Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home a...Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.展开更多
On April 16, the 500-kV Jing’an transmission & substation project in Shanghai, a super-large, multi-voltage level, all-underground, full digital intelligent substation, was completed and put into operation,
针对变压器匝间绝缘是电力变压器损坏事故中的主要损坏部位的问题,设计并制作了500 k V电力变压器匝间绝缘的线圈模型,研究匝间绝缘的电老化特性。根据模型线圈预试验的结果,确定了实验方案,并基于极大似然法思想确定求取反幂模型中的...针对变压器匝间绝缘是电力变压器损坏事故中的主要损坏部位的问题,设计并制作了500 k V电力变压器匝间绝缘的线圈模型,研究匝间绝缘的电老化特性。根据模型线圈预试验的结果,确定了实验方案,并基于极大似然法思想确定求取反幂模型中的参数方法;最后求取不同数据量下的参数值。分析结果表明:不同数据量下所求得的参数值不同,若使电压寿命指数N不出现异常值,至少需要在4种电压持续时间下进行实验;在10种电压持续时间下可得到可靠的电压寿命指数N,其值为13.38。最终通过简单计算及仿真分析求得了老化寿命与电场强度间的反幂模型,用于指导实际变压器的生产设计。展开更多
为满足500 k V武—察输变电工程系统调试需要,文中利用PSCAD电磁暂态仿真软件,在系统调试方式、正常运行方式及检修方式下对500 k V武—察输变电工程系统启动过程中工频过电压、控制电压、潜供电流与恢复电压进行计算分析,以便为工程实...为满足500 k V武—察输变电工程系统调试需要,文中利用PSCAD电磁暂态仿真软件,在系统调试方式、正常运行方式及检修方式下对500 k V武—察输变电工程系统启动过程中工频过电压、控制电压、潜供电流与恢复电压进行计算分析,以便为工程实施提供理论依据,为运行提供参考。展开更多
为保证国家电网公司750kV示范工程1500MVA满负荷试验顺利进行,利用BPA程序计算750kV示范工程1500MVA试验方式下的系统稳定性;提出在公伯峡电厂1~5号发电机励磁系统配置电力系统稳定器(power system stabilizer,PSS)改进系统阻尼;分析...为保证国家电网公司750kV示范工程1500MVA满负荷试验顺利进行,利用BPA程序计算750kV示范工程1500MVA试验方式下的系统稳定性;提出在公伯峡电厂1~5号发电机励磁系统配置电力系统稳定器(power system stabilizer,PSS)改进系统阻尼;分析发电机自并励系统对系统稳定影响的原理以及公伯峡电厂1~5号发电机PSS参数整定试验结果,并用BPA程序重新对公伯峡电厂发电机配置PSS参数后的试验系统进行了稳定计算分析,结果表明试验系统静态稳定极限大于1800MW,为1500MVA满负荷试验提供了技术保证;最后给出了750kV示范工程1500MVA满负荷试验分析结论。展开更多
基金Supported by the Open Project of Jiangsu Key Laboratory of Environmental Engineering(ZX2017005)
文摘Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.
文摘On April 16, the 500-kV Jing’an transmission & substation project in Shanghai, a super-large, multi-voltage level, all-underground, full digital intelligent substation, was completed and put into operation,
文摘针对变压器匝间绝缘是电力变压器损坏事故中的主要损坏部位的问题,设计并制作了500 k V电力变压器匝间绝缘的线圈模型,研究匝间绝缘的电老化特性。根据模型线圈预试验的结果,确定了实验方案,并基于极大似然法思想确定求取反幂模型中的参数方法;最后求取不同数据量下的参数值。分析结果表明:不同数据量下所求得的参数值不同,若使电压寿命指数N不出现异常值,至少需要在4种电压持续时间下进行实验;在10种电压持续时间下可得到可靠的电压寿命指数N,其值为13.38。最终通过简单计算及仿真分析求得了老化寿命与电场强度间的反幂模型,用于指导实际变压器的生产设计。
文摘为保证国家电网公司750kV示范工程1500MVA满负荷试验顺利进行,利用BPA程序计算750kV示范工程1500MVA试验方式下的系统稳定性;提出在公伯峡电厂1~5号发电机励磁系统配置电力系统稳定器(power system stabilizer,PSS)改进系统阻尼;分析发电机自并励系统对系统稳定影响的原理以及公伯峡电厂1~5号发电机PSS参数整定试验结果,并用BPA程序重新对公伯峡电厂发电机配置PSS参数后的试验系统进行了稳定计算分析,结果表明试验系统静态稳定极限大于1800MW,为1500MVA满负荷试验提供了技术保证;最后给出了750kV示范工程1500MVA满负荷试验分析结论。