期刊文献+
共找到10篇文章
< 1 >
每页显示 20 50 100
A performance-based hybrid deep learning model for predicting TBM advance rate using Attention-ResNet-LSTM
1
作者 Sihao Yu Zixin Zhang +2 位作者 Shuaifeng Wang Xin Huang Qinghua Lei 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第1期65-80,共16页
The technology of tunnel boring machine(TBM)has been widely applied for underground construction worldwide;however,how to ensure the TBM tunneling process safe and efficient remains a major concern.Advance rate is a k... The technology of tunnel boring machine(TBM)has been widely applied for underground construction worldwide;however,how to ensure the TBM tunneling process safe and efficient remains a major concern.Advance rate is a key parameter of TBM operation and reflects the TBM-ground interaction,for which a reliable prediction helps optimize the TBM performance.Here,we develop a hybrid neural network model,called Attention-ResNet-LSTM,for accurate prediction of the TBM advance rate.A database including geological properties and TBM operational parameters from the Yangtze River Natural Gas Pipeline Project is used to train and test this deep learning model.The evolutionary polynomial regression method is adopted to aid the selection of input parameters.The results of numerical exper-iments show that our Attention-ResNet-LSTM model outperforms other commonly-used intelligent models with a lower root mean square error and a lower mean absolute percentage error.Further,parametric analyses are conducted to explore the effects of the sequence length of historical data and the model architecture on the prediction accuracy.A correlation analysis between the input and output parameters is also implemented to provide guidance for adjusting relevant TBM operational parameters.The performance of our hybrid intelligent model is demonstrated in a case study of TBM tunneling through a complex ground with variable strata.Finally,data collected from the Baimang River Tunnel Project in Shenzhen of China are used to further test the generalization of our model.The results indicate that,compared to the conventional ResNet-LSTM model,our model has a better predictive capability for scenarios with unknown datasets due to its self-adaptive characteristic. 展开更多
关键词 Tunnel boring machine(TBM) advance rate Deep learning Attention-ResNet-LSTM Evolutionary polynomial regression
下载PDF
Estimation of the TBM advance rate under hard rock conditions using XGBoost and Bayesian optimization 被引量:13
2
作者 Jian Zhou Yingui Qiu +3 位作者 Shuangli Zhu Danial Jahed Armaghani Manoj Khandelwal Edy Tonnizam Mohamad 《Underground Space》 SCIE EI 2021年第5期506-515,共10页
The advance rate(AR)of a tunnel boring machine(TBM)under hard rock conditions is a key parameter in the successful implementation of tunneling engineering.In this study,we improved the accuracy of prediction models by... The advance rate(AR)of a tunnel boring machine(TBM)under hard rock conditions is a key parameter in the successful implementation of tunneling engineering.In this study,we improved the accuracy of prediction models by employing a hybrid model of extreme gradient boosting(XGBoost)with Bayesian optimization(BO)to model the TBM AR.To develop the proposed models,1286 sets of data were collected from the Peng Selangor Raw Water Transfer tunnel project in Malaysia.The database consists of rock mass and intact rock features,including rock mass rating,rock quality designation,weathered zone,uniaxial compressive strength,and Brazilian tensile strength.Machine specifications,including revolution per minute and thrust force,were considered to predict the TBM AR.The accuracies of the predictive models were examined using the root mean squares error(RMSE)and the coefficient of determination(R^(2))between the observed and predicted yield by employing a five-fold cross-validation procedure.Results showed that the BO algorithm can capture better hyper-parameters for the XGBoost prediction model than can the default XGBoost model.The robustness and generalization of the BO-XGBoost model yielded prominent results with RMSE and R^(2) values of 0.0967 and 0.9806(for the testing phase),respectively.The results demonstrated the merits of the proposed BO-XGBoost model.In addition,variable importance through mutual information tests was applied to interpret the XGBoost model and demonstrated that machine parameters have the greatest impact as compared to rock mass and material properties. 展开更多
关键词 TBM performance advance rate XGBoost Bayesian optimization Predictive modeling
原文传递
Realtime prediction of hard rock TBM advance rate using temporal convolutional network(TCN)with tunnel construction big data 被引量:1
3
作者 Zaobao LIU Yongchen WANG +2 位作者 Long LI Xingli FANG Junze WANG 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2022年第4期401-413,共13页
Real-time dynamic adjustment of the tunnel bore machine(TBM)advance rate according to the rockmachine interaction parameters is of great significance to the adaptability of TBM and its efficiency in construction.This ... Real-time dynamic adjustment of the tunnel bore machine(TBM)advance rate according to the rockmachine interaction parameters is of great significance to the adaptability of TBM and its efficiency in construction.This paper proposes a real-time predictive model of TBM advance rate using the temporal convolutional network(TCN),based on TBM construction big data.The prediction model was built using an experimental database,containing 235 data sets,established from the construction data from the Jilin Water-Diversion Tunnel Project in China.The TBM operating parameters,including total thrust,cutterhead rotation,cutterhead torque and penetration rate,are selected as the input parameters of the model.The TCN model is found outperforming the recurrent neural network(RNN)and long short-term memory(LSTM)model in predicting the TBM advance rate with much smaller values of mean absolute percentage error than the latter two.The penetration rate and cutterhead torque of the current moment have significant influence on the TBM advance rate of the next moment.On the contrary,the influence of the cutterhead rotation and total thrust is moderate.The work provides a new concept of real-time prediction of the TBM performance for highly efficient tunnel construction. 展开更多
关键词 hard rock tunnel tunnel bore machine advance rate prediction temporal convolutional networks soft computing construction big data
原文传递
The Impact of Rate of Feeding Advancement after Early Initiation of Enteral Nutrition in Critically Ill, Underweight Patients: A Single-Center Retrospective Chart Review
4
作者 Satomi Ichimaru Maren Sono +2 位作者 Hidetoshi Fujiwara Ryutaro Seo Koichi Ariyoshi 《Food and Nutrition Sciences》 2016年第11期939-954,共16页
Background: The optimal rate of feeding advancement after initiation of early enteral nutrition (EEN) for underweight, critically ill patients is unknown. Methods: We conducted a retrospective chart review in intensiv... Background: The optimal rate of feeding advancement after initiation of early enteral nutrition (EEN) for underweight, critically ill patients is unknown. Methods: We conducted a retrospective chart review in intensive care unit (ICU) patients with a body mass index (BMI) < 20.0 kg/m<sup>2</sup>. Patients were categorized into Group R, which reached the energy target within 3 days of EEN initiation, and Group S, which reached the energy target 4 or more days after EEN initiation. Results: A total of 65 patients with a median age of 73 years were included in the study. No significant differences were observed between the two groups for all-cause mortality, ICU-free days, or length of hospital stay. Ventilator-free days (VFDs) were significantly fewer in Group R than in Group S (18.0 [0.0 - 22.0] vs. 21.0 [16.3 - 24.8] days;P = 0.046). A significantly higher number of patients requiring mechanical ventilation (MV) at hospital discharge were observed in Group R than in Group S (29% vs. 8%;P = 0.030). Multivariable analyses with adjustment for confounders found that days required to reach target energy intake after EEN initiation were significantly and independently associated with the requirement for MV at hospital discharge, but not with VFDs. Conclusion: A slow rate of feeding advancement after initiation of EEN in critically ill patients having a BMI of <20.0 kg/m<sup>2</sup> might be associated with a reduced requirement for MV at hospital discharge. These results require confirmation in a large multicenter trial of underweight, critically ill patients. 展开更多
关键词 Critical Illness UNDERWEIGHT Mechanical Ventilation Early Enteral Nutrition rate of Feeding advancement
下载PDF
Study on the characteristics of ground pressure behaviors in working face with great mining height at different advance speeds by similarity model experiment
5
作者 华心祝 张金龙 谢广祥 《Journal of Coal Science & Engineering(China)》 2007年第1期28-31,共4页
Presently most of research results on strata behaviors were concluded under the normal (moderate) advance rate conditions. Comparing with normal advance rate, fast advance rate and slow advance rate may cause some n... Presently most of research results on strata behaviors were concluded under the normal (moderate) advance rate conditions. Comparing with normal advance rate, fast advance rate and slow advance rate may cause some new changes of strata behaviors. The characteristics of ground pressure behaviors in working face with great mining height at different forward speeds were studied by similarity model experiment in laboratory. Its conclusion provides a theoretic basis for ground pressure controlling. 展开更多
关键词 similarity simulation advance rate working face with great mining height ground pressure
下载PDF
Fine analysis on advanced detection of transient electromagnetic method 被引量:1
6
作者 Wang Bo Liu Shengdong +2 位作者 Yang Zhen Wang Zhijun Huang Lanying 《International Journal of Mining Science and Technology》 SCIE EI 2012年第5期669-673,共5页
Fault fracture zones and water-bearing bodies in front of the driving head are the main disasters in mine laneways,thus it is important to perform their advanced detection and prediction in advance in order to provide... Fault fracture zones and water-bearing bodies in front of the driving head are the main disasters in mine laneways,thus it is important to perform their advanced detection and prediction in advance in order to provide reliable technical support for the excavation.Based on the electromagnetic induction theory,we analyzed the characteristics of primary and secondary fields with a positive and negative wave form of current,proposed the fine processing of the advanced detection with variation rate of apparent resistivity and introduced in detail the computational formulae and procedures.The result of physical simulation experiments illustrate that the tectonic interface of modules can be judged by first-order rate of apparent resistivity with a boundary error of 5%,and the position of water body determined by the fine analysis method agrees well with the result of borehole drilling.This shows that in terms of distinguishing structure and aqueous anomalies,the first-order rate of apparent resistivity is more sensitive than the secondorder rate of apparent resistivity.However,some remaining problems are suggested for future solutions. 展开更多
关键词 Mine laneway advanced detection Fine processing First-order rate
下载PDF
Reliability-based congestion pricing model under endogenous equilibrated market penetration and compliance rate of ATIS
7
作者 钟绍鹏 邓卫 Bushell MAX 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第3期1155-1165,共11页
A reliability-based stochastic system optimum congestion pricing(SSOCP) model with endogenous market penetration and compliance rate in an advanced traveler information systems(ATIS) environment was proposed. All trav... A reliability-based stochastic system optimum congestion pricing(SSOCP) model with endogenous market penetration and compliance rate in an advanced traveler information systems(ATIS) environment was proposed. All travelers were divided into two classes. The first guided travelers were referred to as the equipped travelers who follow ATIS advice, while the second unguided travelers were referred to as the unequipped travelers and the equipped travelers who do not follow the ATIS advice(also referred to as non-complied travelers). Travelers were assumed to take travel time, congestion pricing, and travel time reliability into account when making travel route choice decisions. In order to arrive at on time, travelers needed to allow for a safety margin to their trip.The market penetration of ATIS was determined by a continuous increasing function of the information benefit, and the ATIS compliance rate of equipped travelers was given as the probability of the actually experienced travel costs of guided travelers less than or equal to those of unguided travelers. The analysis results could enhance our understanding of the effect of travel demand level and travel time reliability confidence level on the ATIS market penetration and compliance rate; and the effect of travel time perception variation of guided and unguided travelers on the mean travel cost savings(MTCS) of the equipped travelers, the ATIS market penetration, compliance rate, and the total network effective travel time(TNETT). 展开更多
关键词 reliability advanced traveler information systems market penetration compliance rate stochastic system optimum congestion pricing non-additive path cost
下载PDF
In situ experimental study on TBM excavation with high-pressure water-jet-assisted rock breaking 被引量:9
8
作者 ZHANG Jin-liang YANG Feng-wei +2 位作者 CAO Zhi-guo XIA Yi-min LI Yong-chang 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第12期4066-4077,共12页
China’s first high-pressure hydraulically coupled rock-breaking tunnel boring machine(TBM) was designed to overcome the rock breaking problems of TBM in super-hard rock geology, where high-pressure water jet system i... China’s first high-pressure hydraulically coupled rock-breaking tunnel boring machine(TBM) was designed to overcome the rock breaking problems of TBM in super-hard rock geology, where high-pressure water jet system is configured, including high-flow pump sets, high-pressure rotary joint and high-pressure water jet injection device. In order to investigate the rock breaking performance of high-pressure water-jet-assisted TBM, in situ excavation tests were carried out at the Wan’anxi Water Diversion Project in Longyan, Fujian Province, China, under different water jet pressure and rotational speed. The rock-breaking performance of TBM was analyzed including penetration, cutterhead load, advance rate and field penetration index. The test results show that the adoption of high-pressure water-jet-assisted rock breaking technology can improve the boreability of rock mass, where the TBM penetration increases by 64% under the water jet pressure of 270 MPa. In addition, with the increase of the water jet pressure, the TBM penetration increases and the field penetration index decreases. The auxiliary rock-breaking effect of high-pressure water jet decreases with the increase of cutterhead rotational speed. In the case of the in situ tunneling test parameters of this study, the advance rate is the maximum when the pressure of the high-pressure water jet is 270 MPa and the cutterhead rotational speed is 6 r/min. The technical superiority of high-pressure water-jet-assisted rock breaking technology is highlighted and it provides guidance for the excavation parameter selection of high-pressure hydraulically coupled rock-breaking TBM. 展开更多
关键词 tunnel boring machine high-pressure water jet PENETRATION advance rate field penetration index
下载PDF
Patients 60 Years of Age and Older Should Have the Same Chance for Heart Transplantation or Not?
9
作者 Mahmoud H.Alshirbini 谢飞 +2 位作者 董念国 陈思 Eman Borham 《Journal of Huazhong University of Science and Technology(Medical Sciences)》 SCIE CAS 2017年第1期57-62,共6页
Heart transplantation is considered the best treatment modality for advanced heart disease. While old age has conventionally been considered a contraindication for heart transplantation due to the reported adverse eff... Heart transplantation is considered the best treatment modality for advanced heart disease. While old age has conventionally been considered a contraindication for heart transplantation due to the reported adverse effect of advanced age, however donor hearts' shortage continues to stimulate the discussion about the recipient's upper age limit. Our study was based on a retrospective analysis for the results of 52(18%) patients aged 60 years and older undergoing heart transplantation between May 2008 and December 2015, and these patients were compared with 236(82%) adult recipients who were younger than 60 years at the time of transplantation and during the same period. In older group, 71% were males with the mean age of 63.38±3.55 years, and in younger group, 83.4% were males with a mean age of 43.72±11.41 years(P=0.27). Dilated cardiomyopathy was the most common indication for transplantation among patients in both groups(P=0.147). In older group, the 3-month survival rate was higher than that in younger group(P=0.587), however the 6-month survival rate showed no significant difference(P=0.225). Although the 1-year survival rate was higher in older group(P=0.56), yet the 3-year survival rate between the two groups showed no statistically significant difference(P=0.48). According to our experience among older heart transplant candidates who were 60 years and older, we believe that advanced age should not be an excluding criterion to cardiac transplantation. 展开更多
关键词 advanced heart failure elderly heart transplantation survival rate
下载PDF
TBM performance prediction using LSTM-based hybrid neural network model:Case study of Baimang River tunnel project in Shenzhen,China
10
作者 Qihang Xu Xin Huang +3 位作者 Baogang Zhang Zixin Zhang Junhua Wang Shuaifeng Wang 《Underground Space》 SCIE EI CSCD 2023年第4期130-152,共23页
Accurately predicting tunnel boring machine(TBM)performance is beneficial for excavation efficiency enhancement and risk miti-gation of TBM tunneling.In this paper,we develop a long short-term memory(LSTM)based hybrid... Accurately predicting tunnel boring machine(TBM)performance is beneficial for excavation efficiency enhancement and risk miti-gation of TBM tunneling.In this paper,we develop a long short-term memory(LSTM)based hybrid intelligent model to predict two key TBM performance parameters(advance rate and cutterhead torque).The model combines the LSTM,BN,Dropout and Dense layers to process the raw data and improve the fitting quality.The features,including the ground formation properties,tunnel route cur-vature,tunnel location and TBM operational parameters,are divided into historical/real-time time-varying parameters,time-invariant parameters and historical/real-time output prediction data.The effectiveness of the proposed model is verified based on a large moni-toring database of the Baimang River Tunnel Project in Shenzhen,south China.We then discuss the influence of the prediction mode,neural network structure and time division interval length of historical data on the prediction accuracy.The significance evaluation of input features shows that the historical output prediction has the largest influence on the prediction accuracy,and the influence of ground properties is secondary.It is also found that the correlations between input features and the output prediction are coincident with their interrelationships with the ground properties and ease of TBM excavation.Finally,it is found that the prediction results are most affected by the total propulsion force followed by the rotation speed of the cutterhead.The established model can provide useful guidance for construction personnel to roughly grasp the possible TBM status from the prediction results when adjusting the operational parameters. 展开更多
关键词 TBM performance LSTM Deep learning Neural network advance rate Cutterhead torque
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部