A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A gene...A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency.展开更多
This paper presents a case study for the advanced planning and scheduling (APS) problem encountered in a light source manufacturer. The APS problem explicitly considers due dates of products, operation sequences amo...This paper presents a case study for the advanced planning and scheduling (APS) problem encountered in a light source manufacturer. The APS problem explicitly considers due dates of products, operation sequences among items, and capacity constraints of the manufacturing system. The objective of the problem is to seek the minimum cost of both production idle time and tardiness or earliness penalty of an order. An intelligent heuristic is applied to the problem, and the results demonstrate that significant production performances can be achieved while ensuring customer satisfaction as opposed to normal oractices followed in the company relying on human expertise.展开更多
This paper aims to develop a conceptual framework for real-time production planning and control(PPC).Firstly,we discuss the most prominently applied contemporary information and communication technologies for PPC.En...This paper aims to develop a conceptual framework for real-time production planning and control(PPC).Firstly,we discuss the most prominently applied contemporary information and communication technologies for PPC.Enterprise resource planning(ERP) systems that integrate the value chain in an enterprise,manufacturing execution systems that manage and control the production on shopfloor,and advanced planning and scheduling(APS)systems that develop solutions for complex planning problems are the planning and control systems that have been analyzed.We emphasize the application of radio frequency identification as the most advanced and promising emerging real-time data capture technology that is currently available to manufacturers.Having analyzed the features and shortcomings of the individual systems perse,and by considering the advantages that may be realized through effective integration of these otherwise discrete systems,we propose a framework for real-time PPC.展开更多
基金This project is supported by the Hong Kong Polytechnic University,China(No,G-RGF9).
文摘A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency.
基金supported by National Natural Science Foundation of China under the project of 70901021, 61174171 and 71171040Social Science Foundation of the Ministry of Education of China under the project of 10YJC630139 Foundation for University Outstanding Young Researchers of Fujian Province of China under the project of JA10023S
文摘This paper presents a case study for the advanced planning and scheduling (APS) problem encountered in a light source manufacturer. The APS problem explicitly considers due dates of products, operation sequences among items, and capacity constraints of the manufacturing system. The objective of the problem is to seek the minimum cost of both production idle time and tardiness or earliness penalty of an order. An intelligent heuristic is applied to the problem, and the results demonstrate that significant production performances can be achieved while ensuring customer satisfaction as opposed to normal oractices followed in the company relying on human expertise.
基金support of the research program SFI NORMAN(Norwegian Manufacturing Future)
文摘This paper aims to develop a conceptual framework for real-time production planning and control(PPC).Firstly,we discuss the most prominently applied contemporary information and communication technologies for PPC.Enterprise resource planning(ERP) systems that integrate the value chain in an enterprise,manufacturing execution systems that manage and control the production on shopfloor,and advanced planning and scheduling(APS)systems that develop solutions for complex planning problems are the planning and control systems that have been analyzed.We emphasize the application of radio frequency identification as the most advanced and promising emerging real-time data capture technology that is currently available to manufacturers.Having analyzed the features and shortcomings of the individual systems perse,and by considering the advantages that may be realized through effective integration of these otherwise discrete systems,we propose a framework for real-time PPC.