The PLC and upper computer are used in BOP control system of traditional thermal power plant to monitor the in-situ equipment. It is complicated and wastes labor and resources. It is difficult to maintain and manage t...The PLC and upper computer are used in BOP control system of traditional thermal power plant to monitor the in-situ equipment. It is complicated and wastes labor and resources. It is difficult to maintain and manage them. Beijing GuoDian ZhiShen Control Technology applied the homemade DCS (EDPF-NT System) to the integrated BOP control system of 600-MW supercritical power unit, which offers advantages in efficiency promotion, cost reduction and resource sharing. That also reflects the dominance of EDPF-NT System in performance, price, real-time DUP, network compatibility and communication. This article introduces the main characteristics, structure and configuration of EDPF-NT System, as well as the hierarchical operation, the multi-domain network structure and the private network router developed for Zhuanghe Power Plant.展开更多
文摘The PLC and upper computer are used in BOP control system of traditional thermal power plant to monitor the in-situ equipment. It is complicated and wastes labor and resources. It is difficult to maintain and manage them. Beijing GuoDian ZhiShen Control Technology applied the homemade DCS (EDPF-NT System) to the integrated BOP control system of 600-MW supercritical power unit, which offers advantages in efficiency promotion, cost reduction and resource sharing. That also reflects the dominance of EDPF-NT System in performance, price, real-time DUP, network compatibility and communication. This article introduces the main characteristics, structure and configuration of EDPF-NT System, as well as the hierarchical operation, the multi-domain network structure and the private network router developed for Zhuanghe Power Plant.