This paper presents a unified positive-and negative-sequence dual-dq dynamic model of wind-turbine driven doubly-fed induction generator(DFIG) under unbalanced grid voltage conditions. Strategies for enhanced control ...This paper presents a unified positive-and negative-sequence dual-dq dynamic model of wind-turbine driven doubly-fed induction generator(DFIG) under unbalanced grid voltage conditions. Strategies for enhanced control and operation of a DFIG-used back-to-back(BTB) PWM voltage source converter(VSC) are proposed. The modified control design for the grid-side converter in the stationary αβ frames diminishes the amplitude of DC-link voltage ripples of twice the grid frequency,and the two proposed control targets for the rotor-side converter are alternatively achieved,which,as a result,improve the fault-ride through(FRT) capability of the DFIG based wind power generation systems during unbalanced network supply. A complete unbalanced control scheme with both grid-and rotor-side converters included is designed. Finally,simulation was carried out on a 1.5 MW wind-turbine driven DFIG system and the validity of the developed unified model and the feasibility of the proposed control strategies are all confirmed by the simulated results.展开更多
A novel 4 H-Si C merged P–I–N Schottky(MPS)with floating back-to-back diode(FBD),named FBD-MPS,is proposed and investigated by the Sentaurus technology computer-aided design(TCAD)and analytical model.The FBD feature...A novel 4 H-Si C merged P–I–N Schottky(MPS)with floating back-to-back diode(FBD),named FBD-MPS,is proposed and investigated by the Sentaurus technology computer-aided design(TCAD)and analytical model.The FBD features a trench oxide and floating P-shield,which is inserted between the P+/N-(PN)junction and Schottky junction to eliminate the shorted anode effect.The FBD is formed by the N-drift/P-shield/N-drift and it separates the PN and Schottky active region independently.The FBD reduces not only the Vturn to suppress the snapback effect but also the Von at bipolar operation.The results show that the snapback can be completely eliminated,and the maximum electric field(Emax)is shifted from the Schottky junction to the FBD in the breakdown state.展开更多
We investigate the squeezed back-to-back correlation(BBC) of D^0~0 in relativistic heavy-ion collisions, using the in-medium mass modification calculated with a self-energy in hot pion gas and the source space-time ...We investigate the squeezed back-to-back correlation(BBC) of D^0~0 in relativistic heavy-ion collisions, using the in-medium mass modification calculated with a self-energy in hot pion gas and the source space-time distributions provided by the viscous hydrodynamic code VISH2+1. It is found that the squeezed BBC of D^0~0 is significant in peripheral Au+Au collisions at the relativistic heavy ion collider energy. A possible way to detect the squeezed BBC in an experiment is presented.展开更多
The first completely localized DC back-to-back project for asynchronous interconnection between Northwest and Central China plays an important role in realizing national power grid interconnection, spurring indigenous...The first completely localized DC back-to-back project for asynchronous interconnection between Northwest and Central China plays an important role in realizing national power grid interconnection, spurring indigenous manufacturing industries and promoting DC transmission equipment. Insisting on the principle of autonomous innovation, this project was based on domestic forces in every aspect, from engineering organization, system design, equipment completion, engineering design, equipment manufacturing and procurement to construction and debugging. By passing through strict quality control, intermediate supervision and acceptance test and assessment, the project has been proved up to world advanced level.展开更多
Back-to-back mechanically stabilized earth walls (BBMSEWs) are encountered in bridge approaches, ramp ways, rockfall protection systems, earth dams, levees and noise barriers. However, available design guidelines fo...Back-to-back mechanically stabilized earth walls (BBMSEWs) are encountered in bridge approaches, ramp ways, rockfall protection systems, earth dams, levees and noise barriers. However, available design guidelines for BBMSEWs are limited and not applicable to numerical modeling when back-to-back walls interact with each other. The objective of this paper is to investigate, using PLAXIS code, the effects of the reduction in the distance between BBMSEW, the reinforcement length, the quality of backfill material and the connection of reinforcements in the middle, when the back-to-back walls are close. The results indicate that each of the BBMSEWs behaves independently if the width of the embankment between mechanically stabilized earth walls is greater than that of the active zone. This is in good agreement with the result of FHWA design guideline. However, the results show that the FHWA design guideline underestimates the lateral earth pressure when back-to-back walls interact with each other. Moreover, for closer BBMSEWs, FHWA design guideline strongly overestimates the maximum tensile force in the reinforcement. The investigation of the quality of backfill material shows that the minor increase in embankment cohesion can lead to significant reductions in both the lateral earth pressure and the maximum tensile force in geosynthetic. When the distance between the two earth walls is close to zero, the connection of reinforcement between back-to-back walls significantly improves the factor of safety.展开更多
A comprehensive predictive strategy was proposed for the neutral-point balancing control of back-to-back three-level converters. The phase currents at both sides and the DC-link capacitor voltages were measured for th...A comprehensive predictive strategy was proposed for the neutral-point balancing control of back-to-back three-level converters. The phase currents at both sides and the DC-link capacitor voltages were measured for the prediction of the neutral-point current. A quality function was found to balance the neutral-point, and a metabolic on-times distribution factor was used as a predicator to minimize the quality function at each switching state. Simulation results show that the proposed method produces smaller ripples in tested signals compared with the established one, namely, 9.15% less in a total harmonic distortion(THD) of line-to-line voltage, 1.08% less in the THD of phase current, and 0.9 V less in the ripple of the neutral-point voltage. The obtained experimental results show that the main harmonics of the line-to-line voltage and the phase current in the proposed method are improved by 10 d B and 6 d B, respectively, and the ripple of neutral-point voltage is halved compared to the established one.展开更多
The first fully localized back-to-back DC intercon-nection project which connects Northwest and CentralChina power grids, 330-kV Lingbao Converter Stationhas now started construction for expansion.Lingbao back-to-back...The first fully localized back-to-back DC intercon-nection project which connects Northwest and CentralChina power grids, 330-kV Lingbao Converter Stationhas now started construction for expansion.Lingbao back-to-back converter station situated inLingbao City of Henan Province is the first DC intercon-展开更多
This paper proposes an indirect power control of doubly fed induction generator (DFIG) with the rotor connected to the electric grid through a back-to-back pulse width modulation (PWM) converter for variable speed...This paper proposes an indirect power control of doubly fed induction generator (DFIG) with the rotor connected to the electric grid through a back-to-back pulse width modulation (PWM) converter for variable speed wind power generation. Appropriate state space model of the DFIG is deduced. An original control strategy based on a variable structure control theory, also called sliding mode control, is applied to achieve the control of the active and reactive power exchanged between the stator of the DFIG and the grid. A proportional-integral-(P1) controller is used to keep the DC-link voltage constant for a back-to-back PWM converter. Simulations are conducted for validation of the digital controller operation using Matlab/Simulink software.展开更多
With the rapid development of hydropower in the southwest of China, the energy transmitted by ultra high volt- age direct current (UHVDC) is ever increasing. At the same time, the power grid continues to expand westwa...With the rapid development of hydropower in the southwest of China, the energy transmitted by ultra high volt- age direct current (UHVDC) is ever increasing. At the same time, the power grid continues to expand westward, creating a service area. The stability of the Southwest China Power Grid is becoming a major issue. It is necessary to coordinate the development of hydropower and the construction of cross-region interconnections to optimize the grid structure. The Yu-E denotes the connection between the two region Yu (Chongqing) and E (Hubei) in China. The Yu-E project is a back-to-back voltage source converter based high voltage direct current (VSC-HVDC) project designed to realize an asynchronous connection of the Southwest and Central China Power Grids. The project will improve the bi-directional power support capability and optimize the grid structure. In addition, the Yu-E project will improve hydropower cross-region transmission capacity and enable the Southwest China Power Grid to utilize the power from the Three Gorges in the Central China Power Grid. In this paper, the fault isolation, low-frequency oscillation, sub-synchronous oscillation and short-circuit level are investigated and analyzed. Meanwhile, the impact of the Yu-E project on AC systems is studied in detail. In the end, the overall system design of the Yu-E project is introduced. The research results show that the Yu-E project can increase the transmission capability of the Southwest and Central China Power Grids, and enhance the stability of asynchronously interconnected AC systems. At the same time, the Yu-E project also serves as a demonstration project for the future development and application of VSC technology for the world.展开更多
We calculate the back-to-back correlation (BBC) functions of relativistic boson-antiboson pairs in high energy heavy ion collisions using the Monte Carlo method. The relativistic effects on the BBC functions of ФФ...We calculate the back-to-back correlation (BBC) functions of relativistic boson-antiboson pairs in high energy heavy ion collisions using the Monte Carlo method. The relativistic effects on the BBC functions of ФФ and K+K pairs are investigated. The investigations indicate that the relativistic effects on the BBC functions of K+K- pairs with large momenta are significant, and the effect is sensitive to the particle freeze-out temperature.展开更多
Recent advances in a power electronic device called an electric spring(ES)provide feasible solutions to meeting critical customers’requirements for voltage quality.A new version of the ES was introduced based on a ba...Recent advances in a power electronic device called an electric spring(ES)provide feasible solutions to meeting critical customers’requirements for voltage quality.A new version of the ES was introduced based on a back-to-back converter(ESBC)configuration which extends the operating range and improves the voltage suppression performance to facilitate ultra-high renewable penetration.This paper proposes an efficient control method to facilitate the voltage regulation function of an ESBC with non-critical loads.Particularly,the proposed method is suitable for various load characteristics.We also develop a consensus algorithm to coordinate multiple ESs for maintaining critical bus voltage in distribution systems with ultra-high renewable penetration.The proposed operation of the ESBC is verified by simulation of a modified IEEE 15-bus distribution network.The results show that the ESBC can effectively regulate system voltage and is superior to the original version of the ES.展开更多
We investigate the squeezed back-to-back correlations(BBC) of K+K-, caused by the mass modification of particles in the dense medium formed in d + Au collisions at sNN1/2= 200 GeV and Au + Au collisions at sNN1/2= 6...We investigate the squeezed back-to-back correlations(BBC) of K+K-, caused by the mass modification of particles in the dense medium formed in d + Au collisions at sNN1/2= 200 GeV and Au + Au collisions at sNN1/2= 62.4 GeV. Considering that some kaons may not be affected by the medium, we further study the BBC functions of K+K-when parts of all kaons have a mass-shift. Our results indicate that the BBC functions of K+K-can be observed when only ~10% of all kaons have a mass-shift in d + Au collisions at sNN1/2 = 200 GeV and the peripheral collisions of Au + Au at sNN1/2= 62.4 GeV. Since the BBC function is caused by the mass-shift due to the interactions between the particle and the medium, the successful detection of the BBC function indirectly marks that the dense medium has formed in these collision systems. We suggest the experimental measurement of the BBC function of K+K- in d + Au collisions at sNN1/2 = 200 GeV and peripheral collisions of Au + Au at sNN1/2 = 62.4 GeV.展开更多
The squeezed back-to-back correlation(SBBC)of a boson-antiboson pair is sensitive to the time distribution of the particle-emitting source,and the SBBC function for an evolving source is expected to be affected by the...The squeezed back-to-back correlation(SBBC)of a boson-antiboson pair is sensitive to the time distribution of the particle-emitting source,and the SBBC function for an evolving source is expected to be affected by the relaxation time of the system.In this study,we investigated the effect of relaxation time on the SBBC function.We propose a method for calculating the SBBC function with relaxation-time approximation for evolving sources.SBBC functions of D^(0)D^(-0)in relativistic heavy-ion collisions were investigated using a hydrodynamic model.We found that the relaxation time reduces the amplitudes of the SBBC functions.This becomes apparent for long relaxation times and large initial relative deviations of the chaotic and squeezed amplitudes from their equilibrium values in the temporal steps.展开更多
This paper deals with a new concept for calculating DC harmonic voltages and currents of line- commutated HVDC systems. In contrast to the conventional method, this method is useful for BTB (Back-To-Back) HVDC systems...This paper deals with a new concept for calculating DC harmonic voltages and currents of line- commutated HVDC systems. In contrast to the conventional method, this method is useful for BTB (Back-To-Back) HVDC systems without smoothing reactors or PTP (Point-To-Point) with very short transmission line. This method proposes a new direction for HVDC system design and analysis. The proposed method is applied to a 50 Hz/60 Hz BTB test system and a synchronized BTB test system. After simulation and verification, the new results are introduced.展开更多
In this paper, based on the analysis of the mathematical model in a common synchronous reference frame of the brushless doubly-fed generator (BDFG), the grid connection strategy and maximum energy extraction control...In this paper, based on the analysis of the mathematical model in a common synchronous reference frame of the brushless doubly-fed generator (BDFG), the grid connection strategy and maximum energy extraction control were both analyzed. Besides, the transient simula- tion of no-load model and generation model of the BDFG have been developed on the MATLAB/Simulink platform. The test results during cutting-in grid confirmed the good dynamic performance of grid synchronization and effective power control approach for the BDFG-based variable speed wind turbines.展开更多
We carry out a thermal storage research on GaN HEMT at 350℃for 48 h,and a recess phenomenon is observed in the low voltage section of Schottky forward characteristics.The decrease of 2DEG density will be responsible ...We carry out a thermal storage research on GaN HEMT at 350℃for 48 h,and a recess phenomenon is observed in the low voltage section of Schottky forward characteristics.The decrease of 2DEG density will be responsible for the recess phenomenon.Because the conventional method is not suitable for this kind of curve,a revised approach is presented by analyzing the back-to-back Schottky junction energy band to extract Schottky parameters, which leads to a consistent fit effect.展开更多
The provision of wind farm(WF)grid codes(GCs)has become imperative for sustained grid operations,especially for WFs with permanent-magnet synchronous generator(PMSG)wind energy conversion system.Numerous techniques ha...The provision of wind farm(WF)grid codes(GCs)has become imperative for sustained grid operations,especially for WFs with permanent-magnet synchronous generator(PMSG)wind energy conversion system.Numerous techniques have been developed for executing GC requirements in the event of grid faults.Among the methods,an intriguing strategy is to enhance the performance of back-to-back(BTB)converter controllers.In this research,the PID-type terminal sliding mode control(PID-TSMC)scheme is implemented for both machine-side and grid-side converter-modified controllers of BTB-converter,to reinforce the nonlinear relationship among the state-variable and the control input.The application of this control scheme decreases the response time and improves the robustness of the BTB-converter controllers regarding uncertainty of parameters and external disturbances.The grid-side converter tracks the maximum power point,contributing to the rapid decrease of generator active power output during faults.This frees up converter capacity for injecting GC-compliant reactive current into the grid.Besides,the machine-side converter regulates DC-link voltage,in which its variations during external disturbances decrease substantially with the PID-TSMC.The discussions on the simulations contemplate on the robustness and efficiency of the implemented PID-TSMC strategy in comparison to other BTB-converter control strategies.展开更多
基金Project (No. 50577056) supported by the National Natural ScienceFoundation of China
文摘This paper presents a unified positive-and negative-sequence dual-dq dynamic model of wind-turbine driven doubly-fed induction generator(DFIG) under unbalanced grid voltage conditions. Strategies for enhanced control and operation of a DFIG-used back-to-back(BTB) PWM voltage source converter(VSC) are proposed. The modified control design for the grid-side converter in the stationary αβ frames diminishes the amplitude of DC-link voltage ripples of twice the grid frequency,and the two proposed control targets for the rotor-side converter are alternatively achieved,which,as a result,improve the fault-ride through(FRT) capability of the DFIG based wind power generation systems during unbalanced network supply. A complete unbalanced control scheme with both grid-and rotor-side converters included is designed. Finally,simulation was carried out on a 1.5 MW wind-turbine driven DFIG system and the validity of the developed unified model and the feasibility of the proposed control strategies are all confirmed by the simulated results.
文摘A novel 4 H-Si C merged P–I–N Schottky(MPS)with floating back-to-back diode(FBD),named FBD-MPS,is proposed and investigated by the Sentaurus technology computer-aided design(TCAD)and analytical model.The FBD features a trench oxide and floating P-shield,which is inserted between the P+/N-(PN)junction and Schottky junction to eliminate the shorted anode effect.The FBD is formed by the N-drift/P-shield/N-drift and it separates the PN and Schottky active region independently.The FBD reduces not only the Vturn to suppress the snapback effect but also the Von at bipolar operation.The results show that the snapback can be completely eliminated,and the maximum electric field(Emax)is shifted from the Schottky junction to the FBD in the breakdown state.
基金Supported by the National Natural Science Foundation of China under Grant Nos 11675034,11647166 and 11675033
文摘We investigate the squeezed back-to-back correlation(BBC) of D^0~0 in relativistic heavy-ion collisions, using the in-medium mass modification calculated with a self-energy in hot pion gas and the source space-time distributions provided by the viscous hydrodynamic code VISH2+1. It is found that the squeezed BBC of D^0~0 is significant in peripheral Au+Au collisions at the relativistic heavy ion collider energy. A possible way to detect the squeezed BBC in an experiment is presented.
文摘The first completely localized DC back-to-back project for asynchronous interconnection between Northwest and Central China plays an important role in realizing national power grid interconnection, spurring indigenous manufacturing industries and promoting DC transmission equipment. Insisting on the principle of autonomous innovation, this project was based on domestic forces in every aspect, from engineering organization, system design, equipment completion, engineering design, equipment manufacturing and procurement to construction and debugging. By passing through strict quality control, intermediate supervision and acceptance test and assessment, the project has been proved up to world advanced level.
文摘Back-to-back mechanically stabilized earth walls (BBMSEWs) are encountered in bridge approaches, ramp ways, rockfall protection systems, earth dams, levees and noise barriers. However, available design guidelines for BBMSEWs are limited and not applicable to numerical modeling when back-to-back walls interact with each other. The objective of this paper is to investigate, using PLAXIS code, the effects of the reduction in the distance between BBMSEW, the reinforcement length, the quality of backfill material and the connection of reinforcements in the middle, when the back-to-back walls are close. The results indicate that each of the BBMSEWs behaves independently if the width of the embankment between mechanically stabilized earth walls is greater than that of the active zone. This is in good agreement with the result of FHWA design guideline. However, the results show that the FHWA design guideline underestimates the lateral earth pressure when back-to-back walls interact with each other. Moreover, for closer BBMSEWs, FHWA design guideline strongly overestimates the maximum tensile force in the reinforcement. The investigation of the quality of backfill material shows that the minor increase in embankment cohesion can lead to significant reductions in both the lateral earth pressure and the maximum tensile force in geosynthetic. When the distance between the two earth walls is close to zero, the connection of reinforcement between back-to-back walls significantly improves the factor of safety.
基金Project(61074018)supported by the National Natural Science Foundation of ChinaProject(2012kfjj06)supported by Hunan Province Key Laboratory of Smart Grids Operation and Control(Changsha University of Science and Technology),China
文摘A comprehensive predictive strategy was proposed for the neutral-point balancing control of back-to-back three-level converters. The phase currents at both sides and the DC-link capacitor voltages were measured for the prediction of the neutral-point current. A quality function was found to balance the neutral-point, and a metabolic on-times distribution factor was used as a predicator to minimize the quality function at each switching state. Simulation results show that the proposed method produces smaller ripples in tested signals compared with the established one, namely, 9.15% less in a total harmonic distortion(THD) of line-to-line voltage, 1.08% less in the THD of phase current, and 0.9 V less in the ripple of the neutral-point voltage. The obtained experimental results show that the main harmonics of the line-to-line voltage and the phase current in the proposed method are improved by 10 d B and 6 d B, respectively, and the ripple of neutral-point voltage is halved compared to the established one.
文摘The first fully localized back-to-back DC intercon-nection project which connects Northwest and CentralChina power grids, 330-kV Lingbao Converter Stationhas now started construction for expansion.Lingbao back-to-back converter station situated inLingbao City of Henan Province is the first DC intercon-
文摘This paper proposes an indirect power control of doubly fed induction generator (DFIG) with the rotor connected to the electric grid through a back-to-back pulse width modulation (PWM) converter for variable speed wind power generation. Appropriate state space model of the DFIG is deduced. An original control strategy based on a variable structure control theory, also called sliding mode control, is applied to achieve the control of the active and reactive power exchanged between the stator of the DFIG and the grid. A proportional-integral-(P1) controller is used to keep the DC-link voltage constant for a back-to-back PWM converter. Simulations are conducted for validation of the digital controller operation using Matlab/Simulink software.
基金This work was supported in part by the National Natural Science Foundation of China(No.U1866210).
文摘With the rapid development of hydropower in the southwest of China, the energy transmitted by ultra high volt- age direct current (UHVDC) is ever increasing. At the same time, the power grid continues to expand westward, creating a service area. The stability of the Southwest China Power Grid is becoming a major issue. It is necessary to coordinate the development of hydropower and the construction of cross-region interconnections to optimize the grid structure. The Yu-E denotes the connection between the two region Yu (Chongqing) and E (Hubei) in China. The Yu-E project is a back-to-back voltage source converter based high voltage direct current (VSC-HVDC) project designed to realize an asynchronous connection of the Southwest and Central China Power Grids. The project will improve the bi-directional power support capability and optimize the grid structure. In addition, the Yu-E project will improve hydropower cross-region transmission capacity and enable the Southwest China Power Grid to utilize the power from the Three Gorges in the Central China Power Grid. In this paper, the fault isolation, low-frequency oscillation, sub-synchronous oscillation and short-circuit level are investigated and analyzed. Meanwhile, the impact of the Yu-E project on AC systems is studied in detail. In the end, the overall system design of the Yu-E project is introduced. The research results show that the Yu-E project can increase the transmission capability of the Southwest and Central China Power Grids, and enhance the stability of asynchronously interconnected AC systems. At the same time, the Yu-E project also serves as a demonstration project for the future development and application of VSC technology for the world.
基金Supported by National Natural Science Foundation of China(11275037)
文摘We calculate the back-to-back correlation (BBC) functions of relativistic boson-antiboson pairs in high energy heavy ion collisions using the Monte Carlo method. The relativistic effects on the BBC functions of ФФ and K+K pairs are investigated. The investigations indicate that the relativistic effects on the BBC functions of K+K- pairs with large momenta are significant, and the effect is sensitive to the particle freeze-out temperature.
基金fully supported by a grant from the Research Grants Council of the Hong Kong Special Administrative Region under Theme-based Research Scheme through Project No.T23-701/14-N
文摘Recent advances in a power electronic device called an electric spring(ES)provide feasible solutions to meeting critical customers’requirements for voltage quality.A new version of the ES was introduced based on a back-to-back converter(ESBC)configuration which extends the operating range and improves the voltage suppression performance to facilitate ultra-high renewable penetration.This paper proposes an efficient control method to facilitate the voltage regulation function of an ESBC with non-critical loads.Particularly,the proposed method is suitable for various load characteristics.We also develop a consensus algorithm to coordinate multiple ESs for maintaining critical bus voltage in distribution systems with ultra-high renewable penetration.The proposed operation of the ESBC is verified by simulation of a modified IEEE 15-bus distribution network.The results show that the ESBC can effectively regulate system voltage and is superior to the original version of the ES.
基金Supported by the National Natural Science Foundation of China(11647166,11747155)the Natural Science Foundation of Inner Mongolia(2017BS0104)+1 种基金Changzhou Science and Technology Bureau(CJ20180054)the Foundation of Jiangsu University of Technology(KYY17028)
文摘We investigate the squeezed back-to-back correlations(BBC) of K+K-, caused by the mass modification of particles in the dense medium formed in d + Au collisions at sNN1/2= 200 GeV and Au + Au collisions at sNN1/2= 62.4 GeV. Considering that some kaons may not be affected by the medium, we further study the BBC functions of K+K-when parts of all kaons have a mass-shift. Our results indicate that the BBC functions of K+K-can be observed when only ~10% of all kaons have a mass-shift in d + Au collisions at sNN1/2 = 200 GeV and the peripheral collisions of Au + Au at sNN1/2= 62.4 GeV. Since the BBC function is caused by the mass-shift due to the interactions between the particle and the medium, the successful detection of the BBC function indirectly marks that the dense medium has formed in these collision systems. We suggest the experimental measurement of the BBC function of K+K- in d + Au collisions at sNN1/2 = 200 GeV and peripheral collisions of Au + Au at sNN1/2 = 62.4 GeV.
基金supported by the National Natural Science Foundation of China (Nos. 12175031 and 11675034)
文摘The squeezed back-to-back correlation(SBBC)of a boson-antiboson pair is sensitive to the time distribution of the particle-emitting source,and the SBBC function for an evolving source is expected to be affected by the relaxation time of the system.In this study,we investigated the effect of relaxation time on the SBBC function.We propose a method for calculating the SBBC function with relaxation-time approximation for evolving sources.SBBC functions of D^(0)D^(-0)in relativistic heavy-ion collisions were investigated using a hydrodynamic model.We found that the relaxation time reduces the amplitudes of the SBBC functions.This becomes apparent for long relaxation times and large initial relative deviations of the chaotic and squeezed amplitudes from their equilibrium values in the temporal steps.
文摘This paper deals with a new concept for calculating DC harmonic voltages and currents of line- commutated HVDC systems. In contrast to the conventional method, this method is useful for BTB (Back-To-Back) HVDC systems without smoothing reactors or PTP (Point-To-Point) with very short transmission line. This method proposes a new direction for HVDC system design and analysis. The proposed method is applied to a 50 Hz/60 Hz BTB test system and a synchronized BTB test system. After simulation and verification, the new results are introduced.
文摘In this paper, based on the analysis of the mathematical model in a common synchronous reference frame of the brushless doubly-fed generator (BDFG), the grid connection strategy and maximum energy extraction control were both analyzed. Besides, the transient simula- tion of no-load model and generation model of the BDFG have been developed on the MATLAB/Simulink platform. The test results during cutting-in grid confirmed the good dynamic performance of grid synchronization and effective power control approach for the BDFG-based variable speed wind turbines.
基金Project supported by the National Natural Science Foundation of China(Nos.60890191,60976059)the National Basic Research Program of China(No.2010CB327500).
文摘We carry out a thermal storage research on GaN HEMT at 350℃for 48 h,and a recess phenomenon is observed in the low voltage section of Schottky forward characteristics.The decrease of 2DEG density will be responsible for the recess phenomenon.Because the conventional method is not suitable for this kind of curve,a revised approach is presented by analyzing the back-to-back Schottky junction energy band to extract Schottky parameters, which leads to a consistent fit effect.
文摘The provision of wind farm(WF)grid codes(GCs)has become imperative for sustained grid operations,especially for WFs with permanent-magnet synchronous generator(PMSG)wind energy conversion system.Numerous techniques have been developed for executing GC requirements in the event of grid faults.Among the methods,an intriguing strategy is to enhance the performance of back-to-back(BTB)converter controllers.In this research,the PID-type terminal sliding mode control(PID-TSMC)scheme is implemented for both machine-side and grid-side converter-modified controllers of BTB-converter,to reinforce the nonlinear relationship among the state-variable and the control input.The application of this control scheme decreases the response time and improves the robustness of the BTB-converter controllers regarding uncertainty of parameters and external disturbances.The grid-side converter tracks the maximum power point,contributing to the rapid decrease of generator active power output during faults.This frees up converter capacity for injecting GC-compliant reactive current into the grid.Besides,the machine-side converter regulates DC-link voltage,in which its variations during external disturbances decrease substantially with the PID-TSMC.The discussions on the simulations contemplate on the robustness and efficiency of the implemented PID-TSMC strategy in comparison to other BTB-converter control strategies.