As the computer system has developed much in this highly information-oriented society, database security has become a very important problem and its backup strategies need to be made more efficiently and safety. The i...As the computer system has developed much in this highly information-oriented society, database security has become a very important problem and its backup strategies need to be made more efficiently and safety. The image copy method has been used as the most simple and dependable recovery mechanism for media failure. However, this method spends high overhead costs for massive data transmission and much processing time in the normal operation of the database. To cover such weak points, incremental and full backup methods are adopted before updated trucks reach a predetermined level. Moreover, when the number of full backup files exceeded a predetermined level, we stop incremental and full backups and switch it to the image copy. This paper applies cumulative damage model to backup of files in a database system, by putting damage shock by update, failure shock by database failure and damage by dumped files, and considers the tradeoff among overhead costs of image copy and incremental, full backup methods, and discusses analytically an optimal policy for the image copy backup interval. Finally, numerical examples are given in the case of Poisson process and exponential distributions.展开更多
In this paper, we deal with the problem of improving backup and recovery performance by compressing redundancies in large disk-based backup system. We analyze some general compression algorithms; evaluate their scalab...In this paper, we deal with the problem of improving backup and recovery performance by compressing redundancies in large disk-based backup system. We analyze some general compression algorithms; evaluate their scalability and applicability. We investigate the distribution features of the redundant data in whole system range, and propose a multi-resolution distributed compression algorithm which can discern duplicated data at granularity of file level, block level or byte level to reduce the redundancy in backup environment. In order to accelerate recovery, we propose a synthetic backup solution which stores data in a recovery-oriented way and can compose the final data in back-end backup server. Experiments show that this algorithm can greatly reduce bandwidth consumption, save storage cost, and shorten the backup and recovery time. We implement these technologies in our product, called H-info backup system, which is capable of achieving over 10x compression ratio in both network utilization and data storage during backup.展开更多
This paper presents a modeling method by stochastic Petri net for reliability analysis of phased mission system( PMS) with phase backup. The model consisting of petri nets,depicts the system behaviors of unit level,sy...This paper presents a modeling method by stochastic Petri net for reliability analysis of phased mission system( PMS) with phase backup. The model consisting of petri nets,depicts the system behaviors of unit level,system logic level and phase level. Guard functions of petri nets are used to avoid modeling complexity and make the model flexible to different reliability logical structures. It was shown that the time redundancy within phase and from phase backup for PMS can both be described by use of the proposed model.展开更多
In wide area backup protection of electric power systems, the prerequisite of protection device's accurate, fast and reliable performance is its corresponding fault type and fault location can be discriminated qui...In wide area backup protection of electric power systems, the prerequisite of protection device's accurate, fast and reliable performance is its corresponding fault type and fault location can be discriminated quickly and defined exactly. In our study, global information will be introduced into the backup protection system. By analyzing and computing real-time PMU measurements, basing on cluster analysis theory, we are using mainly hierarchical cluster analysis to search after the statistical laws of electrical quantities' marked changes. Then we carry out fast and exact detection of fault components and fault sections, and finally accomplish fault isolation. The facts show that the fault detection of fault component (fault section) can be performed successfully by hierarchical cluster analysis and calculation. The results of hierarchical cluster analysis are accurate and reliable, and the dendrograms of hierarchical cluster analysis are in intuition.展开更多
By using wireless communication technology, when wired network of grassroots station is failure, wireless backup system of meteorological data transmission can automatically switch, and transmit the data at the statio...By using wireless communication technology, when wired network of grassroots station is failure, wireless backup system of meteorological data transmission can automatically switch, and transmit the data at the station with line fault to the destination by short message way. The system has simple operation and low operation cost, and transmission fault of real-time meteorological data due to line problem at the station can be effectively decreased. At present, the system has been tested successfully and put into business operation.展开更多
Based on ATM Multi section backup VP self healing scheme, analysis of cell loss probability under finite buffer is made by use of queue system method. Optimal buffer size can be fixed on.
With a focus on the backup roll, a rolling-contact-fatigue experiment was performed on samples of 5% Cr forged steel. The P-S-N fatigue curves were determined and the fatigue strength was calculated. The emergence of ...With a focus on the backup roll, a rolling-contact-fatigue experiment was performed on samples of 5% Cr forged steel. The P-S-N fatigue curves were determined and the fatigue strength was calculated. The emergence of cracks on the test-sample surfaces was observed at different fatigue cycles. A micro-hardness tester was used to measure the hardness of the subsurface fatigue layer. The microstructures were analyzed at various magnifications with an optical microscope, scanning electron microscope, and transmission electron microscope. Based on these tests, the rolling-contact-fatigue mechanism of the large forged steel backup roll was also considered. The results showed that the contact-fatigue strength of the tested backup roll steel was 1 249 MPa;the surface fatigue crack lengthened continuously as the number of cycles increased and followed an S-shaped curve; the subsurface fatigue hardness reached its highest value at about 90 (HV) increment from the matrix hardness of 540 (HV) in the backup roll; the subsurface martensite/bainite microstructure was crushed and the dislocation density was greatly increased. Under alternating contact stresses,the surface/subsurface material was damaged and exhibited many microdefects. At the least, the surface fatigue layer on backup rolls should be fully removed before the microcracks enter a period of rapid propagation.展开更多
VERITAS Backup Exec9.1 for Windows Servers是先进的Windows数据保护解决方案,能为Microsoft Windows服务器环境提供通过Microsoft认证的,全面的、经济的、高效的保护。它提供基于Web的管理控制台和直观的类似浏览器的图形用户界面,...VERITAS Backup Exec9.1 for Windows Servers是先进的Windows数据保护解决方案,能为Microsoft Windows服务器环境提供通过Microsoft认证的,全面的、经济的、高效的保护。它提供基于Web的管理控制台和直观的类似浏览器的图形用户界面,加上使用方便的向导功能,适用于任何水平的用户和任何规模网络的数据保护和恢复。另外。展开更多
Base station(BS)backup batteries(BSBBs),with their dispatchable capacity,are potential demand-side resources for future power systems.To enhance the power supply reliability and post-contingency frequency security of ...Base station(BS)backup batteries(BSBBs),with their dispatchable capacity,are potential demand-side resources for future power systems.To enhance the power supply reliability and post-contingency frequency security of power systems,we propose a two-stage stochastic unit commitment(UC)model incorporating operational reserve and post-contingency frequency support provisions from massive BSBBs in cellular networks,in which the minimum backup energy demand is considered to ensure BS power supply reliability.The energy,operational reserve,and frequency support ancillary services are co-optimized to handle the power balance and post-contingency frequency security in both forecasted and stochastic variable renewable energy(VRE)scenarios.Furthermore,we propose a dedicated and scalable distributed optimization framework to enable autonomous optimizations for both dispatching center(DC)and BSBBs.The BS model parameters are stored and processed locally,while only the values of BS decision variables are required to upload to DC under the proposed distributed optimization framework,which safeguards BS privacy effectively.Case studies on a modified IEEE 14-bus system demonstrate the effectiveness of the proposed method in promoting VRE accommodation,ensuring post-contingency frequency security,enhancing operational economics,and fully utilizing BSBBs'energy and power capacity.Besides,the proposed distributed optimization framework has been validated to converge to a feasible solution with near-optimal performance within limited iterations.Additionally,numerical results on the Guangdong 500 kV provincial power system in China verify the scalability and practicality of the proposed distributed optimization framework.展开更多
The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a ...The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a practical need to study a backup protection technology that does not require step-by-step setting and can be adaptively coordinated.This paper proposes an action sequence adaptive to fault positions that uses only positive sequence fault component(PSFC)voltage.Considering the influence of DGs,the unified time dial setting can be obtained by selecting specific points.The protection performance is improved by using the adjacent upstream and downstream protections to meet the coordination time interval in the case of metallic faults at the near-and far-ends of the line.Finally,the expression and implementation scheme for inverse-time backup protection(ITBP)based on the unified characteristic equation is given.Simulation results show that this scheme can adapt to DG penetration scenarios and can realize the adaptive coordination of multi-level relays.展开更多
The protagonist, Scarlett, in the book Gone with the Wind, impresses people throughout the world, not only because of her beautiful appearance, but also her brave and strong spirit. However, everyone has his weak poin...The protagonist, Scarlett, in the book Gone with the Wind, impresses people throughout the world, not only because of her beautiful appearance, but also her brave and strong spirit. However, everyone has his weak points, and she is not an exception. So it's sure that she needs some backup forces to support her to get through the tough days. This thesis tries to put forward Scarlett's strong backup forces, which help her pull through the tough life and finally become a real brave person who could face the rest life strongly and fearlessly all by herself.展开更多
In the context of real-time fault-tolerant scheduling in multiprocessor systems, Primary-backup scheme plays an important role. A backup copy is always preferred to be executed as passive backup copy whenever possible...In the context of real-time fault-tolerant scheduling in multiprocessor systems, Primary-backup scheme plays an important role. A backup copy is always preferred to be executed as passive backup copy whenever possible because it can take the advantages of backup copy de-allocation technique and overloading technique to improve schedulability. In this paper, we propose a novel efficient fault-tolerant ratemonotonic best-fit algorithm efficient fault-tolerant rate-monotonic best-fit (ERMBF) based on multiprocessors systems to enhance the schedulability. Unlike existing scheduling algorithms that start scheduling tasks with only one processor. ERMBF pre-allocates a certain amount of processors before starting scheduling tasks, which enlarge the searching spaces for tasks. Besides, when a new processor is allocated, we reassign the task copies that have already been assigned to the existing processors in order to find a superior tasks assignment configuration. These two strategies are all aiming at making as many backup copies as possible to be executed as passive status. As a result, ERMBF can use fewer processors to schedule a set of tasks without losing real-time and fault-tolerant capabilities of the system. Simulation results reveal that ERMBF significantly improves the schedulability over existing, comparable algorithms in literature.展开更多
文摘As the computer system has developed much in this highly information-oriented society, database security has become a very important problem and its backup strategies need to be made more efficiently and safety. The image copy method has been used as the most simple and dependable recovery mechanism for media failure. However, this method spends high overhead costs for massive data transmission and much processing time in the normal operation of the database. To cover such weak points, incremental and full backup methods are adopted before updated trucks reach a predetermined level. Moreover, when the number of full backup files exceeded a predetermined level, we stop incremental and full backups and switch it to the image copy. This paper applies cumulative damage model to backup of files in a database system, by putting damage shock by update, failure shock by database failure and damage by dumped files, and considers the tradeoff among overhead costs of image copy and incremental, full backup methods, and discusses analytically an optimal policy for the image copy backup interval. Finally, numerical examples are given in the case of Poisson process and exponential distributions.
基金Supported by the National Natural Science Foun-dation of China (60473023) the National Innovation Foundationfor Small Technology-Based Firms (04C26214201280)
文摘In this paper, we deal with the problem of improving backup and recovery performance by compressing redundancies in large disk-based backup system. We analyze some general compression algorithms; evaluate their scalability and applicability. We investigate the distribution features of the redundant data in whole system range, and propose a multi-resolution distributed compression algorithm which can discern duplicated data at granularity of file level, block level or byte level to reduce the redundancy in backup environment. In order to accelerate recovery, we propose a synthetic backup solution which stores data in a recovery-oriented way and can compose the final data in back-end backup server. Experiments show that this algorithm can greatly reduce bandwidth consumption, save storage cost, and shorten the backup and recovery time. We implement these technologies in our product, called H-info backup system, which is capable of achieving over 10x compression ratio in both network utilization and data storage during backup.
基金Nationd Natural Science Foundation of China(No.71671185)
文摘This paper presents a modeling method by stochastic Petri net for reliability analysis of phased mission system( PMS) with phase backup. The model consisting of petri nets,depicts the system behaviors of unit level,system logic level and phase level. Guard functions of petri nets are used to avoid modeling complexity and make the model flexible to different reliability logical structures. It was shown that the time redundancy within phase and from phase backup for PMS can both be described by use of the proposed model.
文摘In wide area backup protection of electric power systems, the prerequisite of protection device's accurate, fast and reliable performance is its corresponding fault type and fault location can be discriminated quickly and defined exactly. In our study, global information will be introduced into the backup protection system. By analyzing and computing real-time PMU measurements, basing on cluster analysis theory, we are using mainly hierarchical cluster analysis to search after the statistical laws of electrical quantities' marked changes. Then we carry out fast and exact detection of fault components and fault sections, and finally accomplish fault isolation. The facts show that the fault detection of fault component (fault section) can be performed successfully by hierarchical cluster analysis and calculation. The results of hierarchical cluster analysis are accurate and reliable, and the dendrograms of hierarchical cluster analysis are in intuition.
文摘By using wireless communication technology, when wired network of grassroots station is failure, wireless backup system of meteorological data transmission can automatically switch, and transmit the data at the station with line fault to the destination by short message way. The system has simple operation and low operation cost, and transmission fault of real-time meteorological data due to line problem at the station can be effectively decreased. At present, the system has been tested successfully and put into business operation.
文摘Based on ATM Multi section backup VP self healing scheme, analysis of cell loss probability under finite buffer is made by use of queue system method. Optimal buffer size can be fixed on.
文摘With a focus on the backup roll, a rolling-contact-fatigue experiment was performed on samples of 5% Cr forged steel. The P-S-N fatigue curves were determined and the fatigue strength was calculated. The emergence of cracks on the test-sample surfaces was observed at different fatigue cycles. A micro-hardness tester was used to measure the hardness of the subsurface fatigue layer. The microstructures were analyzed at various magnifications with an optical microscope, scanning electron microscope, and transmission electron microscope. Based on these tests, the rolling-contact-fatigue mechanism of the large forged steel backup roll was also considered. The results showed that the contact-fatigue strength of the tested backup roll steel was 1 249 MPa;the surface fatigue crack lengthened continuously as the number of cycles increased and followed an S-shaped curve; the subsurface fatigue hardness reached its highest value at about 90 (HV) increment from the matrix hardness of 540 (HV) in the backup roll; the subsurface martensite/bainite microstructure was crushed and the dislocation density was greatly increased. Under alternating contact stresses,the surface/subsurface material was damaged and exhibited many microdefects. At the least, the surface fatigue layer on backup rolls should be fully removed before the microcracks enter a period of rapid propagation.
文摘VERITAS Backup Exec9.1 for Windows Servers是先进的Windows数据保护解决方案,能为Microsoft Windows服务器环境提供通过Microsoft认证的,全面的、经济的、高效的保护。它提供基于Web的管理控制台和直观的类似浏览器的图形用户界面,加上使用方便的向导功能,适用于任何水平的用户和任何规模网络的数据保护和恢复。另外。
基金supported in part by the National Nature Science Foundation of China(No.52177088).
文摘Base station(BS)backup batteries(BSBBs),with their dispatchable capacity,are potential demand-side resources for future power systems.To enhance the power supply reliability and post-contingency frequency security of power systems,we propose a two-stage stochastic unit commitment(UC)model incorporating operational reserve and post-contingency frequency support provisions from massive BSBBs in cellular networks,in which the minimum backup energy demand is considered to ensure BS power supply reliability.The energy,operational reserve,and frequency support ancillary services are co-optimized to handle the power balance and post-contingency frequency security in both forecasted and stochastic variable renewable energy(VRE)scenarios.Furthermore,we propose a dedicated and scalable distributed optimization framework to enable autonomous optimizations for both dispatching center(DC)and BSBBs.The BS model parameters are stored and processed locally,while only the values of BS decision variables are required to upload to DC under the proposed distributed optimization framework,which safeguards BS privacy effectively.Case studies on a modified IEEE 14-bus system demonstrate the effectiveness of the proposed method in promoting VRE accommodation,ensuring post-contingency frequency security,enhancing operational economics,and fully utilizing BSBBs'energy and power capacity.Besides,the proposed distributed optimization framework has been validated to converge to a feasible solution with near-optimal performance within limited iterations.Additionally,numerical results on the Guangdong 500 kV provincial power system in China verify the scalability and practicality of the proposed distributed optimization framework.
基金supported in part by the National Natural Science Foundation of China(NSFC-UKRI_EPSRC)(No.52061635105)in part by the Science and Technology Program of SGCC(No.5100-202040327A-0-0-00).
文摘The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a practical need to study a backup protection technology that does not require step-by-step setting and can be adaptively coordinated.This paper proposes an action sequence adaptive to fault positions that uses only positive sequence fault component(PSFC)voltage.Considering the influence of DGs,the unified time dial setting can be obtained by selecting specific points.The protection performance is improved by using the adjacent upstream and downstream protections to meet the coordination time interval in the case of metallic faults at the near-and far-ends of the line.Finally,the expression and implementation scheme for inverse-time backup protection(ITBP)based on the unified characteristic equation is given.Simulation results show that this scheme can adapt to DG penetration scenarios and can realize the adaptive coordination of multi-level relays.
文摘The protagonist, Scarlett, in the book Gone with the Wind, impresses people throughout the world, not only because of her beautiful appearance, but also her brave and strong spirit. However, everyone has his weak points, and she is not an exception. So it's sure that she needs some backup forces to support her to get through the tough days. This thesis tries to put forward Scarlett's strong backup forces, which help her pull through the tough life and finally become a real brave person who could face the rest life strongly and fearlessly all by herself.
基金Supported by the National Basic Reseach Program of China (973 Program 2004 CB318200)
文摘In the context of real-time fault-tolerant scheduling in multiprocessor systems, Primary-backup scheme plays an important role. A backup copy is always preferred to be executed as passive backup copy whenever possible because it can take the advantages of backup copy de-allocation technique and overloading technique to improve schedulability. In this paper, we propose a novel efficient fault-tolerant ratemonotonic best-fit algorithm efficient fault-tolerant rate-monotonic best-fit (ERMBF) based on multiprocessors systems to enhance the schedulability. Unlike existing scheduling algorithms that start scheduling tasks with only one processor. ERMBF pre-allocates a certain amount of processors before starting scheduling tasks, which enlarge the searching spaces for tasks. Besides, when a new processor is allocated, we reassign the task copies that have already been assigned to the existing processors in order to find a superior tasks assignment configuration. These two strategies are all aiming at making as many backup copies as possible to be executed as passive status. As a result, ERMBF can use fewer processors to schedule a set of tasks without losing real-time and fault-tolerant capabilities of the system. Simulation results reveal that ERMBF significantly improves the schedulability over existing, comparable algorithms in literature.