期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
STRUCTURE DESIGN OF THE BEIJING SPECTROMETERⅢBEAM PIPE 被引量:3
1
作者 ZHENG Lifang JI Quan +5 位作者 WANG Li LI xunfeng XU Shaowang DONG Sujun ZHAO Libin LIU Jianping 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2008年第3期1-6,共6页
The Beijing spectrometer Ⅲ (BESⅢ) beam pipe is in the center of the BESⅢ, which is the detector of the upgrade project of Beijing electron and positron collider (BEPC Ⅱ). Electrons and positrons collide in the... The Beijing spectrometer Ⅲ (BESⅢ) beam pipe is in the center of the BESⅢ, which is the detector of the upgrade project of Beijing electron and positron collider (BEPC Ⅱ). Electrons and positrons collide in the BESⅢ beam pipe. According to the demands of the BEPC Ⅱ, a key program of Chinese Academy of Sciences, the BESⅢ beam pipe is designed based on the finite elements analysis. The BESIII beam pipe is installed in the inner cylinder of the BESⅢ drift chamber. As a vacuum tube, the BESIII beam pipe is designed as 1 000 mm in length, 63 mm in inner diameter and 114 mm in outer diameter, respectively. The BESIII beam pipe consists of a central beryllium pipe cooled by EDM-1, the oil No.1 for electric discharge machining, and two extended copper pipes cooled by deionized water (DW). The three parts are jointed by vacuum welding. Factors taken into account in the design are as follows. ① The wall thickness of the central beryllium pipe should be designed as small as possible to reduce the multi-scattering and improve the particle momentum resolution. And the wall thickness of the extended copper pipe should be designed as large as possible to protect the detectors from the backgrounds. ②The BESⅢ beam pipe must be sufficiently cooled to avoid the damage and prevents its influence to the BESⅢ drift chamber (DC) operation. The inner surface temperature of the DC inner cylinder must be maintained at 293±2 K. ③ The magnetic permeability of the materials used in the BESⅢ beam pipe must be less than 1.05 H/m to avoid large magnetic field distortions. ④ The static pressure of the vacuum chamber of the BESⅢ beam pipe must be less than 800 μPa. The simulating results show that the designed structure of the BESⅢ beam pipe satisfies the requirements mentioned above. The structure design scheme is evaluated and adonted hv the headouarters of BEPCⅡ. 展开更多
关键词 Beam pipe beijing spectrometer Structure design beijing electron and positron collider BESⅢ
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部