Owing to overcoming the characteristics that there are many economic and technical indexes which are fuzzy and incompatibility to each other in evaluating investment project,a new method is proposed.The method is base...Owing to overcoming the characteristics that there are many economic and technical indexes which are fuzzy and incompatibility to each other in evaluating investment project,a new method is proposed.The method is based on the matter-element analysis and combined with the concepts of fuzzy mathematics,which is called the method of fuzzy matter-element analysis.It constructs the compound fuzzy matter element with the investment projects,evaluation factors and their fuzzy value.Through establishing the best subjection degree (fuzzy value),complex fuzzy matter element of relational coefficient and weight aggregation of fuzzy matter-element model,the writer achieves on optimum order of the investment projects according to the calculated relational degree and finds the best project.In this paper,the calculation of weight adopts the analytical hierarchy process method(AHP).Through the actual example,it shows that the model is simple and its calculation is reliable.It is very significant for the engineering evaluated bid and investment decision.展开更多
Pulsed eddy current (PEC) non-destructive test- ing and evaluation (NDT&E) has been around for some time and it is still attracting extensive attention from researchers around the globe, which can be witnessed th...Pulsed eddy current (PEC) non-destructive test- ing and evaluation (NDT&E) has been around for some time and it is still attracting extensive attention from researchers around the globe, which can be witnessed through the reports reviewed in this paper. Thanks to its richness of spectral components, various applications of this technique have been proposed and reported in the lit- erature covering both structural integrity inspection and material characterization in various industrial sectors. To support its development and for better understanding of the phenomena around the transient induced eddy currents, attempts for its modelling both analytically and numeri- cally have been made by researchers around the world. This review is an attempt to capture the state-of-the-art development and applications of PEC, especially in the last 15 years and it is not intended to be exhaustive. Future challenges and opportunities for PEC NDT&E are also presented.展开更多
A method for solving the winner determination problem (WDP) in multi-attribute procurement auctions is proposed, based on technical and business experts' evaluation information. Firstly, on the background of procur...A method for solving the winner determination problem (WDP) in multi-attribute procurement auctions is proposed, based on technical and business experts' evaluation information. Firstly, on the background of procurements in China, a multi-attribute pro- curement auction mechanism is presented, where technical and business experts participate in the bid evaluation. Then, the concept of TOPSIS is used to determine the positive and negative ideal points of the WDP according to bid prices, the technical and business experts' evaluation information. Further, the closeness coefficient of each bidder (candidate supplier) is obtained by calculating the distances to the positive and negative ideal points. Thus, the winning supplier can be determined according to the closeness coefficients. Finally, a numerical example is used to illustrate the use of the proposed method.展开更多
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis...Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.展开更多
[ Objective ] This study aimed to investigate the major contributors to the measurement uncertainty in quantitative analysis of genetically modified ingreclients and improve the quality of quantitative detection of ge...[ Objective ] This study aimed to investigate the major contributors to the measurement uncertainty in quantitative analysis of genetically modified ingreclients and improve the quality of quantitative detection of genetically modified components. [ Method] The content of CaMV35S promoter (parameter) in GTS40- 3-2 soybean powder samples was measured to estimate the measurement uncertainty preliminarily. [ Result] Type A uncertainty (uA) ' type B uncertainty (uB) and combined standard uncertainty (Uc) were 0.0 004, 0.002 and 0.002, respectively. At a confidence level ofp = 95% and freedom degree of Voff = 3 251, coverage factor k = 1.96, expanded uncertainty U = 0.004. The final measurement result was C = 0.028 ± 0. 004, which was dose to the conventional true value (0.03). Thus, the measurement uncertainty was relatively small, indicating a high quality of measurement. In this study, uncertainty evaluation indicated that the deviation of micro liquid transfer made the greatest contribution to the measurement uncertainty. [ Cludusion ] The deviation of micro liquid transfer should be reduced to im- prove the quality of measurement.展开更多
The publication of ISO 15686-5 is significant for studies related to the life-cycle costs of buildings. Among the many economic evaluation methods, the NPV method is recommended for use by this standard. This stu...The publication of ISO 15686-5 is significant for studies related to the life-cycle costs of buildings. Among the many economic evaluation methods, the NPV method is recommended for use by this standard. This study explains the concept and method of PV, and then provides an explanation of the concept and method of NPV, and points out the limitations in the practical application of the method.展开更多
为保证水电工程投资效益,提高承包商质量水平,提出了一种基于熵权的TOPSIS(technique for order preference by similarity to ideal solution)承包商优选方法。结合评标的模糊性、复杂性等特点,从承包商的企业状况、施工技术、投标报价...为保证水电工程投资效益,提高承包商质量水平,提出了一种基于熵权的TOPSIS(technique for order preference by similarity to ideal solution)承包商优选方法。结合评标的模糊性、复杂性等特点,从承包商的企业状况、施工技术、投标报价3方面筛选出10个重要指标建立指标体系;依据贴近度评判标准,构建承包商优选的熵权TOPSIS模型,采用熵值法确定评价指标的客观权重,进而应用逼近理想解排序法对水电工程承包商的综合水平进行评价。通过工程实例,分别运用均权灰关联模型、熵权灰关联模型、熵权TOPSIS模型作对比分析,验证了所取方法的适用性和优越性。研究结果表明:基于熵权贴近度的排序方法具有更高的区分能力,评价结果可较为客观地反映各承包商的优劣水平,达到更方便有效选择承包商的目的。展开更多
基金Project supported by the National High-Tech Research and Development program of China (863 Program ) (No.2 0 0 2 AA2 Z42 5 1-2 10 0 41) Postdoctoral Scientific Foundation of Northeast Agricultural U niversity. (No. 2 40 0 0 9) and postdoctoral Scien
文摘Owing to overcoming the characteristics that there are many economic and technical indexes which are fuzzy and incompatibility to each other in evaluating investment project,a new method is proposed.The method is based on the matter-element analysis and combined with the concepts of fuzzy mathematics,which is called the method of fuzzy matter-element analysis.It constructs the compound fuzzy matter element with the investment projects,evaluation factors and their fuzzy value.Through establishing the best subjection degree (fuzzy value),complex fuzzy matter element of relational coefficient and weight aggregation of fuzzy matter-element model,the writer achieves on optimum order of the investment projects according to the calculated relational degree and finds the best project.In this paper,the calculation of weight adopts the analytical hierarchy process method(AHP).Through the actual example,it shows that the model is simple and its calculation is reliable.It is very significant for the engineering evaluated bid and investment decision.
基金Ministry of Higher Education of Malaysia for funding the project on PEC NDT at IIUM through the research grant FRGS16-059-0558supported by the National Natural Science Foundation of China under research grants 51677187 and 51307172
文摘Pulsed eddy current (PEC) non-destructive test- ing and evaluation (NDT&E) has been around for some time and it is still attracting extensive attention from researchers around the globe, which can be witnessed through the reports reviewed in this paper. Thanks to its richness of spectral components, various applications of this technique have been proposed and reported in the lit- erature covering both structural integrity inspection and material characterization in various industrial sectors. To support its development and for better understanding of the phenomena around the transient induced eddy currents, attempts for its modelling both analytically and numeri- cally have been made by researchers around the world. This review is an attempt to capture the state-of-the-art development and applications of PEC, especially in the last 15 years and it is not intended to be exhaustive. Future challenges and opportunities for PEC NDT&E are also presented.
基金supported by the National Natural Science Foundation of China(7127105171371002+1 种基金71471032)the Fundamental Research Funds for the Central Universities,NEU,China(N140607001)
文摘A method for solving the winner determination problem (WDP) in multi-attribute procurement auctions is proposed, based on technical and business experts' evaluation information. Firstly, on the background of procurements in China, a multi-attribute pro- curement auction mechanism is presented, where technical and business experts participate in the bid evaluation. Then, the concept of TOPSIS is used to determine the positive and negative ideal points of the WDP according to bid prices, the technical and business experts' evaluation information. Further, the closeness coefficient of each bidder (candidate supplier) is obtained by calculating the distances to the positive and negative ideal points. Thus, the winning supplier can be determined according to the closeness coefficients. Finally, a numerical example is used to illustrate the use of the proposed method.
文摘Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.
基金Supported by Project of Standardized Technology System of Sichuan Bureau of Quality and Technical Supervision(ZYBZ2013-39)
文摘[ Objective ] This study aimed to investigate the major contributors to the measurement uncertainty in quantitative analysis of genetically modified ingreclients and improve the quality of quantitative detection of genetically modified components. [ Method] The content of CaMV35S promoter (parameter) in GTS40- 3-2 soybean powder samples was measured to estimate the measurement uncertainty preliminarily. [ Result] Type A uncertainty (uA) ' type B uncertainty (uB) and combined standard uncertainty (Uc) were 0.0 004, 0.002 and 0.002, respectively. At a confidence level ofp = 95% and freedom degree of Voff = 3 251, coverage factor k = 1.96, expanded uncertainty U = 0.004. The final measurement result was C = 0.028 ± 0. 004, which was dose to the conventional true value (0.03). Thus, the measurement uncertainty was relatively small, indicating a high quality of measurement. In this study, uncertainty evaluation indicated that the deviation of micro liquid transfer made the greatest contribution to the measurement uncertainty. [ Cludusion ] The deviation of micro liquid transfer should be reduced to im- prove the quality of measurement.
文摘The publication of ISO 15686-5 is significant for studies related to the life-cycle costs of buildings. Among the many economic evaluation methods, the NPV method is recommended for use by this standard. This study explains the concept and method of PV, and then provides an explanation of the concept and method of NPV, and points out the limitations in the practical application of the method.
文摘为保证水电工程投资效益,提高承包商质量水平,提出了一种基于熵权的TOPSIS(technique for order preference by similarity to ideal solution)承包商优选方法。结合评标的模糊性、复杂性等特点,从承包商的企业状况、施工技术、投标报价3方面筛选出10个重要指标建立指标体系;依据贴近度评判标准,构建承包商优选的熵权TOPSIS模型,采用熵值法确定评价指标的客观权重,进而应用逼近理想解排序法对水电工程承包商的综合水平进行评价。通过工程实例,分别运用均权灰关联模型、熵权灰关联模型、熵权TOPSIS模型作对比分析,验证了所取方法的适用性和优越性。研究结果表明:基于熵权贴近度的排序方法具有更高的区分能力,评价结果可较为客观地反映各承包商的优劣水平,达到更方便有效选择承包商的目的。