With the increasing deployment of renewable energy-based power generation plants,the power system is becoming increasingly vulnerable due to the intermittent nature of renewable energy,and a blackout can be the worst ...With the increasing deployment of renewable energy-based power generation plants,the power system is becoming increasingly vulnerable due to the intermittent nature of renewable energy,and a blackout can be the worst scenario.The current auxiliary generators must be upgraded to energy sources with substantially high power and storage capacity,a short response time,good profitability,and minimal environmental concern.Difficulties in the power restoration of renewable energy generators should also be addressed.The different energy storage methods can store and release electrical/thermal/mechanical energy and provide flexibility and stability to the power system.Herein,a review of the use of energy storage methods for black start services is provided,for which little has been discussed in the literature.First,the challenges that impede a stable,environmentally friendly,and cost-effective energy storage-based black start are identified.The energy storagebased black start service may lack supply resilience.Second,the typical energy storage-based black start service,including explanations on its steps and configurations,is introduced.Black start services with different energy storage technologies,including electrochemical,thermal,and electromechanical resources,are compared.Results suggest that hybridization of energy storage technologies should be developed,which mitigates the disadvantages of individual energy storage methods,considering the deployment of energy storage-based black start services.展开更多
With the continuous development of new energy generation technology and the increasingly complex power grid environment,the traditional black start scheme cannot meet the requirements of today’s power grid in order t...With the continuous development of new energy generation technology and the increasingly complex power grid environment,the traditional black start scheme cannot meet the requirements of today’s power grid in order to ensure the stable operation of the power system can be restored quickly in the face of large power outages,so a more complete black start scheme needs to be developed to cope with the new power system.With the development of energy storage technology,the limitations of the traditional black-start scheme can be solved by new energy farms with energy storage configuration.Therefore,this paper investigates the problems faced by black-start,the key technologies of energy storage assisted new energy black-start,and introduces the research related to new energy black-start technology to provide reference for future research and application of new energy black-start.展开更多
The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as h...The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.展开更多
Battery energy storage systems(BESSs)are a kind of important asset for power systems with high integration levels of renewable energy,and they can be controlled to provide various critical services to the power grid.T...Battery energy storage systems(BESSs)are a kind of important asset for power systems with high integration levels of renewable energy,and they can be controlled to provide various critical services to the power grid.This paper presents the real-world experience of using a megawatt-scale BESS with grid-following(GFL)and grid-forming(GFM)controls and a run-of-river(ROR)hydropower plant to restore a regional power system.To demonstrate this,we carry out power-hardwarein-the-loop experiments integrating an actual GFL-or GFM-controlled BESS and a load bank.Both the simulation and experimental results presented in this paper show the different roles of GFL-or GFM-controlled BESS in power system black starts.The results provide further insight for system operators on how GFL-or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS.The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method,thus enhancing the system resiliency and robustness.展开更多
The optimization of black-start decision-making plays an important role in the rapid restoration of a power system after a major failure/outage.With the introduction of the concept of smart grids and the development o...The optimization of black-start decision-making plays an important role in the rapid restoration of a power system after a major failure/outage.With the introduction of the concept of smart grids and the development of real-time communication networks,the black-start decision-makers are no longer limited to only one or a few power system experts such as dispatchers,but rather a large group of professional people in practice.The overall behaviors of a large decision-making group of decision-makers/experts are more complicated and unpredictable.However,the existing methods for black-start decision-making cannot handle the situations with a large group of decision-makers.Given this background,a clustering algorithm is presented to optimize the black-start decision-making problem with a large group of decision-makers.Group decision-making preferences are obtained by clustering analysis,and the final black-start decision-making results are achieved by combining the weights of black-start indexes and the preferences of the decision-making group.The effectiveness of the proposed method is validated by a practical case.This work extends the black-start decision-making problem to situations with a large group of decision-makers.展开更多
On the process of power system black start after an accident, it can help to optimize the resources allocation and accelerate the recovery process that decomposing the power system into several independent partitions ...On the process of power system black start after an accident, it can help to optimize the resources allocation and accelerate the recovery process that decomposing the power system into several independent partitions for parallel recovery. On the basis of adequate consideration of fuzziness of black-start zone partitioning, a new algorithm based on fuzzy clustering analysis is presented. Characteristic indexes are extracted fully and accurately. The raw data matrix is made up of the electrical distance between every nodes and blackstart resources. Closure transfer method is utilized to get the dynamic clustering. The availability and feasibility of the proposed algorithm are verified on the New-England 39 bus system at last.展开更多
In response to the need for robust black-start strategies in modern smart grids during blackouts,this paper proposes a two-stage black-start model that integrates wind turbines(WT),photovoltaic generators(PV),and ener...In response to the need for robust black-start strategies in modern smart grids during blackouts,this paper proposes a two-stage black-start model that integrates wind turbines(WT),photovoltaic generators(PV),and energy storage systems(ESS).The system restoration path model in the first stage utilizes the Dijkstra algorithm to create a skeleton network and formulate a post-outage generator start-up plan.The second stage involved a load pick-up model,structured as a mixed-integer linear programming problem,aimed at restoring the load with the assistance of the ESS.This stage was designed for computational efficiency,allowing solutions to be obtained using standard commercial solvers.The performance and efficacy of the proposed model were demonstrated through its application to modified IEEE 39/118-bus transmission systems,with the results affirming its high efficiency and effectiveness in power system restoration scenarios.展开更多
基金financially supported by the UK Engineering and Physical Sciences Research Council(Nos.EP/S001905/1,EP/S032622/1,and EP/N032888/1)the Jiangsu Provincial Department of Science and Technology,China(Nos.BZ2019071 and BZ2020076)。
文摘With the increasing deployment of renewable energy-based power generation plants,the power system is becoming increasingly vulnerable due to the intermittent nature of renewable energy,and a blackout can be the worst scenario.The current auxiliary generators must be upgraded to energy sources with substantially high power and storage capacity,a short response time,good profitability,and minimal environmental concern.Difficulties in the power restoration of renewable energy generators should also be addressed.The different energy storage methods can store and release electrical/thermal/mechanical energy and provide flexibility and stability to the power system.Herein,a review of the use of energy storage methods for black start services is provided,for which little has been discussed in the literature.First,the challenges that impede a stable,environmentally friendly,and cost-effective energy storage-based black start are identified.The energy storagebased black start service may lack supply resilience.Second,the typical energy storage-based black start service,including explanations on its steps and configurations,is introduced.Black start services with different energy storage technologies,including electrochemical,thermal,and electromechanical resources,are compared.Results suggest that hybridization of energy storage technologies should be developed,which mitigates the disadvantages of individual energy storage methods,considering the deployment of energy storage-based black start services.
基金Supported by Joint Foundation of Natural Science Foundation of Jilin Province(No.YDZJ202101ZYTS152).
文摘With the continuous development of new energy generation technology and the increasingly complex power grid environment,the traditional black start scheme cannot meet the requirements of today’s power grid in order to ensure the stable operation of the power system can be restored quickly in the face of large power outages,so a more complete black start scheme needs to be developed to cope with the new power system.With the development of energy storage technology,the limitations of the traditional black-start scheme can be solved by new energy farms with energy storage configuration.Therefore,this paper investigates the problems faced by black-start,the key technologies of energy storage assisted new energy black-start,and introduces the research related to new energy black-start technology to provide reference for future research and application of new energy black-start.
文摘The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.
文摘Battery energy storage systems(BESSs)are a kind of important asset for power systems with high integration levels of renewable energy,and they can be controlled to provide various critical services to the power grid.This paper presents the real-world experience of using a megawatt-scale BESS with grid-following(GFL)and grid-forming(GFM)controls and a run-of-river(ROR)hydropower plant to restore a regional power system.To demonstrate this,we carry out power-hardwarein-the-loop experiments integrating an actual GFL-or GFM-controlled BESS and a load bank.Both the simulation and experimental results presented in this paper show the different roles of GFL-or GFM-controlled BESS in power system black starts.The results provide further insight for system operators on how GFL-or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS.The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method,thus enhancing the system resiliency and robustness.
基金supported by National Natural Science Foundation of China (No.51007080)National High Technology Research and Development Program of China (863 Program) (No.2011AA05A105)+1 种基金the Fundamental Research Funds for the Central Universities (No.2012QNA4011)key project from Zhejiang Electric Power Corporation
文摘The optimization of black-start decision-making plays an important role in the rapid restoration of a power system after a major failure/outage.With the introduction of the concept of smart grids and the development of real-time communication networks,the black-start decision-makers are no longer limited to only one or a few power system experts such as dispatchers,but rather a large group of professional people in practice.The overall behaviors of a large decision-making group of decision-makers/experts are more complicated and unpredictable.However,the existing methods for black-start decision-making cannot handle the situations with a large group of decision-makers.Given this background,a clustering algorithm is presented to optimize the black-start decision-making problem with a large group of decision-makers.Group decision-making preferences are obtained by clustering analysis,and the final black-start decision-making results are achieved by combining the weights of black-start indexes and the preferences of the decision-making group.The effectiveness of the proposed method is validated by a practical case.This work extends the black-start decision-making problem to situations with a large group of decision-makers.
文摘On the process of power system black start after an accident, it can help to optimize the resources allocation and accelerate the recovery process that decomposing the power system into several independent partitions for parallel recovery. On the basis of adequate consideration of fuzziness of black-start zone partitioning, a new algorithm based on fuzzy clustering analysis is presented. Characteristic indexes are extracted fully and accurately. The raw data matrix is made up of the electrical distance between every nodes and blackstart resources. Closure transfer method is utilized to get the dynamic clustering. The availability and feasibility of the proposed algorithm are verified on the New-England 39 bus system at last.
基金Science and Technology Project of the State Grid,Shanxi Electric Power Research Institute.(Project name:Research on equivalent inertia and frequency response characteristics of induction motors and applications of black-start scheme in power grids,project number:52053022000 J).
文摘In response to the need for robust black-start strategies in modern smart grids during blackouts,this paper proposes a two-stage black-start model that integrates wind turbines(WT),photovoltaic generators(PV),and energy storage systems(ESS).The system restoration path model in the first stage utilizes the Dijkstra algorithm to create a skeleton network and formulate a post-outage generator start-up plan.The second stage involved a load pick-up model,structured as a mixed-integer linear programming problem,aimed at restoring the load with the assistance of the ESS.This stage was designed for computational efficiency,allowing solutions to be obtained using standard commercial solvers.The performance and efficacy of the proposed model were demonstrated through its application to modified IEEE 39/118-bus transmission systems,with the results affirming its high efficiency and effectiveness in power system restoration scenarios.