针对间歇生产过程存在的多阶段问题,提出了基于数据动态特性CPV(1)(cumulative percent variance of the first principal component)指标进行模糊聚类实现多阶段软划分的方法,解决了传统分段方式对间歇过程进行硬划分的缺陷,使得过程...针对间歇生产过程存在的多阶段问题,提出了基于数据动态特性CPV(1)(cumulative percent variance of the first principal component)指标进行模糊聚类实现多阶段软划分的方法,解决了传统分段方式对间歇过程进行硬划分的缺陷,使得过程多阶段划分更加准确。在此基础上建立多阶段具有时变主元协方差的改进MPCA(multiway principal component analysis)模型进行间歇过程的监视。将此方法应用于青霉素发酵过程,验证了该方法的可靠度和有效性。展开更多
This paper introduces the refurbishmentof 200 MW generating units in NortheastPower Network in recent years, to improvetheir operation reliability, economy,adjustability and controllability. It mainlydescribes the adv...This paper introduces the refurbishmentof 200 MW generating units in NortheastPower Network in recent years, to improvetheir operation reliability, economy,adjustability and controllability. It mainlydescribes the advanced technology used inimproving the combustion, optimizingpulverized coal distribution, economizerantiwear and strengthening heat transfer ofboiler sets and the refurbishment effects. Itintroduces technical measures and prot1ts inretro fit of flow passage of triple-flow lowpressure steam turbines, as well as theapplication of digital electronic hydraulic(DEH) govemors to realize the coordinatedcontrol and energy saving of generating units.(I) Refurbish ment of 200 MWBoiler Equipment in NortheastPower NetworkAbstractThis part introduces some measuresperformed to improve the operation level of2OO MW boiler sets of the power plants inNortheast Power Network in recent years.including the application of conce11trated(conc)-weak c0mbustion technology, theresearch and application of high-efficiencypulverized coal classifier, the application ofantiwear economizer and comprehensiveimprovement of insufficient temperature ofmain steam and reheated stean1. Afterrefurbishment the operating econo111y andsafety of the generating units are greatlyimproved.展开更多
文摘针对间歇生产过程存在的多阶段问题,提出了基于数据动态特性CPV(1)(cumulative percent variance of the first principal component)指标进行模糊聚类实现多阶段软划分的方法,解决了传统分段方式对间歇过程进行硬划分的缺陷,使得过程多阶段划分更加准确。在此基础上建立多阶段具有时变主元协方差的改进MPCA(multiway principal component analysis)模型进行间歇过程的监视。将此方法应用于青霉素发酵过程,验证了该方法的可靠度和有效性。
文摘This paper introduces the refurbishmentof 200 MW generating units in NortheastPower Network in recent years, to improvetheir operation reliability, economy,adjustability and controllability. It mainlydescribes the advanced technology used inimproving the combustion, optimizingpulverized coal distribution, economizerantiwear and strengthening heat transfer ofboiler sets and the refurbishment effects. Itintroduces technical measures and prot1ts inretro fit of flow passage of triple-flow lowpressure steam turbines, as well as theapplication of digital electronic hydraulic(DEH) govemors to realize the coordinatedcontrol and energy saving of generating units.(I) Refurbish ment of 200 MWBoiler Equipment in NortheastPower NetworkAbstractThis part introduces some measuresperformed to improve the operation level of2OO MW boiler sets of the power plants inNortheast Power Network in recent years.including the application of conce11trated(conc)-weak c0mbustion technology, theresearch and application of high-efficiencypulverized coal classifier, the application ofantiwear economizer and comprehensiveimprovement of insufficient temperature ofmain steam and reheated stean1. Afterrefurbishment the operating econo111y andsafety of the generating units are greatlyimproved.