Extensive research work including multiple methodologies and numerous simulations have been completed in order to determine the economic effectiveness of employing CHP at commercial and residential sites. In contrast ...Extensive research work including multiple methodologies and numerous simulations have been completed in order to determine the economic effectiveness of employing CHP at commercial and residential sites. In contrast to the above, very few attempts have been made to develop methodologies to study the feasibility of CHP systems at industrial manufacturing facilities. As a result, practical opportunities for CHP at industrial sites are often not realized or even investigated. It follows that there is a need in the CHP related literature for an analysis that is explicit and yet general enough to determine the economic viability and potential for success of CHP systems at industrial manufacturing facilities. Therefore, the purpose of this paper is to clearly outline a methodology to determine the economic effectiveness of installation and operation of a CHP system at industrial facilities that have a need for space or process heating in the form of steam. The effect on the CHP system economic performance of several parameters, such as the project payback, internal rate of return, net present value, etc., are considered in the proposed methodology. The applicability and generality of the methodology is illustrated by examples including four different manufacturing facilities. The effects of the variability of factors such as annual facility operational hours during which both process heat and electricity are needed, facility average hourly thermal load, cost of utility supplied electricity, and CHP fuel type and associated fuel cost, on the outcome of the economic analysis are also examined.展开更多
This paper built a combined heat and power(CHP) dispatch model for wind-CHP system with solid heat storage device(SHS) aiming at minimizing system coal consumption, and set system demand-supply balance and units'...This paper built a combined heat and power(CHP) dispatch model for wind-CHP system with solid heat storage device(SHS) aiming at minimizing system coal consumption, and set system demand-supply balance and units' operation conditions as the operation constraints. Furthermore, robust stochastic optimization theory was used to describe wind power output uncertainty. The simulation result showed that SHS increased CHP peak-valley shifting capability and reduced abandoned wind rate from 12% to 6%, and reduced 5% coal consumption, compared with the original system operation by flexible charging electric power and heating. The payback period of employing SHS in wind-CHP system is far shorter than SHS expected service life.展开更多
斜温层蓄热罐可以提高热电联产(combined heat and power,CHP)机组在供热期间的调峰能力,因此逐渐向大型化发展,但设计参数对蓄热罐的性能影响较大,且采用目前的性能评估方法效率较低。为此,建立大型蓄热罐的物理模型及数学模型,研究蓄...斜温层蓄热罐可以提高热电联产(combined heat and power,CHP)机组在供热期间的调峰能力,因此逐渐向大型化发展,但设计参数对蓄热罐的性能影响较大,且采用目前的性能评估方法效率较低。为此,建立大型蓄热罐的物理模型及数学模型,研究蓄热过程中斜温层的形成及变化过程,提出斜温层等效容积的概念,同时分析结构参数及运行参数对斜温层等效容积的影响。结果表明:形成稳定斜温层后,随着蓄热量的增加,斜温层厚度变化不大,采用斜温层等效容积可以更高效的评估蓄热罐的性能。比较不同工况下蓄热罐等效容积的相对变化量可知,不同影响因素对斜温层等效容积的影响从高到低排序依次为布水器布置、蓄热流量、高径比和冷热水温差。研究成果为大型蓄热罐的性能评估提供了一种新参考。展开更多
文摘Extensive research work including multiple methodologies and numerous simulations have been completed in order to determine the economic effectiveness of employing CHP at commercial and residential sites. In contrast to the above, very few attempts have been made to develop methodologies to study the feasibility of CHP systems at industrial manufacturing facilities. As a result, practical opportunities for CHP at industrial sites are often not realized or even investigated. It follows that there is a need in the CHP related literature for an analysis that is explicit and yet general enough to determine the economic viability and potential for success of CHP systems at industrial manufacturing facilities. Therefore, the purpose of this paper is to clearly outline a methodology to determine the economic effectiveness of installation and operation of a CHP system at industrial facilities that have a need for space or process heating in the form of steam. The effect on the CHP system economic performance of several parameters, such as the project payback, internal rate of return, net present value, etc., are considered in the proposed methodology. The applicability and generality of the methodology is illustrated by examples including four different manufacturing facilities. The effects of the variability of factors such as annual facility operational hours during which both process heat and electricity are needed, facility average hourly thermal load, cost of utility supplied electricity, and CHP fuel type and associated fuel cost, on the outcome of the economic analysis are also examined.
基金Supported by the Fundamental Research Funds for the National Science Foundation of China(71573084)
文摘This paper built a combined heat and power(CHP) dispatch model for wind-CHP system with solid heat storage device(SHS) aiming at minimizing system coal consumption, and set system demand-supply balance and units' operation conditions as the operation constraints. Furthermore, robust stochastic optimization theory was used to describe wind power output uncertainty. The simulation result showed that SHS increased CHP peak-valley shifting capability and reduced abandoned wind rate from 12% to 6%, and reduced 5% coal consumption, compared with the original system operation by flexible charging electric power and heating. The payback period of employing SHS in wind-CHP system is far shorter than SHS expected service life.
文摘斜温层蓄热罐可以提高热电联产(combined heat and power,CHP)机组在供热期间的调峰能力,因此逐渐向大型化发展,但设计参数对蓄热罐的性能影响较大,且采用目前的性能评估方法效率较低。为此,建立大型蓄热罐的物理模型及数学模型,研究蓄热过程中斜温层的形成及变化过程,提出斜温层等效容积的概念,同时分析结构参数及运行参数对斜温层等效容积的影响。结果表明:形成稳定斜温层后,随着蓄热量的增加,斜温层厚度变化不大,采用斜温层等效容积可以更高效的评估蓄热罐的性能。比较不同工况下蓄热罐等效容积的相对变化量可知,不同影响因素对斜温层等效容积的影响从高到低排序依次为布水器布置、蓄热流量、高径比和冷热水温差。研究成果为大型蓄热罐的性能评估提供了一种新参考。