Since its implementation of the openingpolicy,China has witnessed greatsuccess in foreign fund utilization.Hunan,situated in the hinterland,beganto introduce foreign capital a little later thanthe coastal areas.In 197...Since its implementation of the openingpolicy,China has witnessed greatsuccess in foreign fund utilization.Hunan,situated in the hinterland,beganto introduce foreign capital a little later thanthe coastal areas.In 1979,Hunan began toconduct processing and assembling businessand compensation trade,but gained only afew million US dollars.A vast change wastook place in the Eighth Five-Year Planperiod,achieving a great quantitative andqualitative rise in foreign capital utilizationas compared with the sixth and seventh Five-Year Plan periods.In the past five years,Hunan has approved 4,001 foreign-fundedprojects,a 5,5-fold increase over the total forthe previous 12 years(1979-1990),including3,584 projects directly financed by展开更多
The Kunlunshan Mountain Ms8.1 earthquake, occurred in Nov.14, 2001, is the first event with magnitude more than 8 in the China earthquake monitoring history, specifically at the beginning of digital techniques in prec...The Kunlunshan Mountain Ms8.1 earthquake, occurred in Nov.14, 2001, is the first event with magnitude more than 8 in the China earthquake monitoring history, specifically at the beginning of digital techniques in precursor monitoring networks. Any investigation of recorded data on this earthquake is very important for testing the operation of the digital monitoring networks and understanding the preparation, occurrence, and adjustment of stress/strain of strong continental earthquakes. In this paper we investigated the coseismic response changes of well water level of groundwater and volume strain meter of bore hole in digital earthquake monitoring network of Capital area and its vicinity, due to the Nov.14, 2001 Ms8.1 Kunlun Mountain earthquake. The responding time, shapes or manners, amplitudes, and lasting time of well water level and strain-meters to seismic wave are studied in comparison. Then we discussed the possibility that the response changes of groundwater to strong distant earthquakes can be understood as one kind of observing evidence of stress/strain changes induced by distant earthquake.展开更多
The revision work of the overall plan from 1991 to1992 under the auspices of the Beijing Institute of Planning and Design(BIPD) has been completed in an all-round way.This article sums upthose background conditions,gu...The revision work of the overall plan from 1991 to1992 under the auspices of the Beijing Institute of Planning and Design(BIPD) has been completed in an all-round way.This article sums upthose background conditions,guiding ideology and basic objectives con-cerned,and the four focal points of the revision.展开更多
Jiangsu De Long Nickel Industry Co.,Ltd is a private enterprise dedicated to manufacture of nickel nickel-iron alloy products with advanced technique process,in Xiangshui,Yancheng it has 2 50000 DWT grade shipping doc...Jiangsu De Long Nickel Industry Co.,Ltd is a private enterprise dedicated to manufacture of nickel nickel-iron alloy products with advanced technique process,in Xiangshui,Yancheng it has 2 50000 DWT grade shipping docks,completed 24 nickel-iron alloy production lines with 1,000,000 t/a scale and one 1,500,000 t/a high-end stainless steel workshop,one展开更多
文摘Since its implementation of the openingpolicy,China has witnessed greatsuccess in foreign fund utilization.Hunan,situated in the hinterland,beganto introduce foreign capital a little later thanthe coastal areas.In 1979,Hunan began toconduct processing and assembling businessand compensation trade,but gained only afew million US dollars.A vast change wastook place in the Eighth Five-Year Planperiod,achieving a great quantitative andqualitative rise in foreign capital utilizationas compared with the sixth and seventh Five-Year Plan periods.In the past five years,Hunan has approved 4,001 foreign-fundedprojects,a 5,5-fold increase over the total forthe previous 12 years(1979-1990),including3,584 projects directly financed by
基金supported by Natural Science Foundation of China(41274061 and 40374019)
文摘The Kunlunshan Mountain Ms8.1 earthquake, occurred in Nov.14, 2001, is the first event with magnitude more than 8 in the China earthquake monitoring history, specifically at the beginning of digital techniques in precursor monitoring networks. Any investigation of recorded data on this earthquake is very important for testing the operation of the digital monitoring networks and understanding the preparation, occurrence, and adjustment of stress/strain of strong continental earthquakes. In this paper we investigated the coseismic response changes of well water level of groundwater and volume strain meter of bore hole in digital earthquake monitoring network of Capital area and its vicinity, due to the Nov.14, 2001 Ms8.1 Kunlun Mountain earthquake. The responding time, shapes or manners, amplitudes, and lasting time of well water level and strain-meters to seismic wave are studied in comparison. Then we discussed the possibility that the response changes of groundwater to strong distant earthquakes can be understood as one kind of observing evidence of stress/strain changes induced by distant earthquake.
文摘The revision work of the overall plan from 1991 to1992 under the auspices of the Beijing Institute of Planning and Design(BIPD) has been completed in an all-round way.This article sums upthose background conditions,guiding ideology and basic objectives con-cerned,and the four focal points of the revision.
文摘Jiangsu De Long Nickel Industry Co.,Ltd is a private enterprise dedicated to manufacture of nickel nickel-iron alloy products with advanced technique process,in Xiangshui,Yancheng it has 2 50000 DWT grade shipping docks,completed 24 nickel-iron alloy production lines with 1,000,000 t/a scale and one 1,500,000 t/a high-end stainless steel workshop,one