期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Development of Surface Grating Distributed Feedback Quantum Cascade Laser for High Output Power and Low Threshold Current Density
1
作者 刘颖慧 张锦川 +3 位作者 江建民 孙素娟 李沛旭 刘峰奇 《Chinese Physics Letters》 SCIE CAS CSCD 2015年第2期60-62,共3页
We report on the room-temperature cascade laser (QCL) at λ -4.7μm. cw operation of a surface grating Both grating design and material distributed feedback (DFB) quantum optimization are used to decrease the thre... We report on the room-temperature cascade laser (QCL) at λ -4.7μm. cw operation of a surface grating Both grating design and material distributed feedback (DFB) quantum optimization are used to decrease the threshold current density and to increase the output power. For a high-reflectivity-coated 13-μm-wide and 4- mm-long laser, high wall-plug efficiency of 6% is obtained at 20℃ from a single facet producing over I W of ew output power. The threshold current density of DFB QCL is as low as 1.13kA/cm^2 at 10℃ and 1.34kA/cm2 at 30℃ in cw mode. Stable single-mode emission with a side-mode suppression ratio of about 30 dB is observed in tile working temperature range of 20-50℃. 展开更多
关键词 DFB QCL development of Surface Grating Distributed Feedback Quantum cascade Laser for High Output Power and Low Threshold Current Density
下载PDF
The scheme optimization on construction diversion with discharge control feature of upstream operational reservoir
2
作者 Liu Quan Hu Zhigen +2 位作者 Fan Wuyi Ni Jinchu Li Qinjun 《Engineering Sciences》 EI 2012年第4期61-67,82,共8页
There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk f... There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk factors of construction diversion system with discharge control feature as well as their composition. And the risk factors include the upstream operational reservoir discharge control, the interval flood and branch flood and the diversion system itself. And then based on analyzing of the conversion relation between risk index and investment index of diversion scheme, the risk control and conversion principals of diversion system are put forward, and the feasible diversion scheme model is built. At last, the risk and economic evaluation and scheme economic feasibility analysis method of diversion scheme are shown by an example of construction diversion scheme optimization with the discharge control condition of upstream hydropower station. The study is valuable for establishment and optimization of construction diversion scheme with upstream reservoir discharge control. 展开更多
关键词 construction diversion cascade hydropower development risk analysis scheme optimization
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部