Entrusted by the Environmental Protection Bureau of Changde City,we conducted drilling,sampling survey and constructed a monitoring network for groundwater in several counties and districts of Changde City.This articl...Entrusted by the Environmental Protection Bureau of Changde City,we conducted drilling,sampling survey and constructed a monitoring network for groundwater in several counties and districts of Changde City.This article introduces the drilling technology,detection method and detection network layout plan adopted in the project,and expounds the problems that occurred while executing the project,in order to provide reference for similar groundwater capacity supervision and construction projects.展开更多
文摘Entrusted by the Environmental Protection Bureau of Changde City,we conducted drilling,sampling survey and constructed a monitoring network for groundwater in several counties and districts of Changde City.This article introduces the drilling technology,detection method and detection network layout plan adopted in the project,and expounds the problems that occurred while executing the project,in order to provide reference for similar groundwater capacity supervision and construction projects.