期刊文献+
共找到1,507篇文章
< 1 2 76 >
每页显示 20 50 100
Spatio-temporal distribution of phytoplankton in the Danjiangkou Reservoir, a water source area for the South-to-North Water Diversion Project (Middle Route), China 被引量:12
1
作者 殷大聪 郑凌凌 宋立荣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2011年第3期531-540,共10页
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ar... One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×106 ind./L, and the highest value was 14.72 × 106 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiscus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance of Stephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR. 展开更多
关键词 浮游植物密度 丹江口水库 南水北调工程 时空分布 水源区 南水北调西线工程 中线 中国
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
2
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water diversion project project portfolio critical chain
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
3
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 south-to-north water diversion project reliability model management chain parallel connection series connection
下载PDF
Wet-Dry Runoff Correlation in Western Route of South-to-North Water Diversion Project,China 被引量:2
4
作者 HUANG Xiao-rong ZHAO Jing-wei YANG Peng-peng 《Journal of Mountain Science》 SCIE CSCD 2015年第3期592-603,共12页
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries(water-exporting area), to the upstrea... The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries(water-exporting area), to the upstream of the Yellow River(waterimporting area). The long-term hydrological data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow characteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, waterimporting area, and the stretch downstream of the water-exporting have synchronization in high–low flow relationship, whereas they display nonsynchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological compensation probability for rivers where water is diverted is about 25% to 10%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the waterexporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the waterexporting area. 展开更多
关键词 南水北调工程 径流相关 西线区域 跨流域引水工程 出口区域 干湿 中国 径流时间序列
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:2
5
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle Route of the south-to-north water diversion project(MR-SNWDP) China
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
6
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water diversion project
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
7
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion project River regime water environment Mathematical model
下载PDF
Impact of the eastern water diversion from the south to the north project on the saltwater intrusion in the Changjiang Estuary in China 被引量:10
8
作者 XU Kun ZHU Jianrong GU Yuliang 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2012年第3期47-58,共12页
The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as ... The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as the sectional salt flux is calculated in the North Branch (NB),the South Branch (SB),the North Channel (NC),the South Channel (SC),the North Passage (NP) and the South Passage (SP),respectively.The net seaward water flux in the SB is reduced,and the net water flux spilling over from the NB to the SB is enhanced after the eastern WDP.Under the mean river discharge condition in the dry season,the net salt flux spilling over from the NB to the SB is increased by 2.09 t/s and 0.52 t/s during the spring and neap tides,respectively,due to the eastern WDP.The saltwater intrusion in the Changjiang Estuary is enhanced by the eastern WDP.Compared with that during the spring tide,the net water diversion ratio during the neap tide in the NC is smaller,and thus the enhancement of the saltwater intrusion by the eastern WDP is smaller in the NC,and larger in the NP and the SP.The tidally averaged surface salinity at the water intakes of the Dongfengxisha Reservoir,the Chenhang Reservoir and the Qingcaosha Reservoir rises both during the spring and neap tides. 展开更多
关键词 eastern water diversion from the south to the north project saltwater intrusion Changjiang Estuary numerical calculation the water resource
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
9
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer project
下载PDF
Computing payment for ecosystem services in watersheds: An analysis of the Middle Route Project of South-to-North Water Diversion in China 被引量:12
10
作者 Zhengju Dong Yan Yan +5 位作者 Jing Duan Xiao Fu Qingrong Zhou Xiang Huang Xiangen Zhu Jingzhu Zhao 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2011年第12期2005-2012,共8页
Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechani... Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechanism by the central government, rapid progress on PES research and practice has been achieved. However PES still faces many difficulties. A key issue is the lack of a fully-fledged theory and method to clearly define the design scope, accounting and feasibility of PES criteria. An improved watershed criteria model was developed in light of research on PES practices in China, investigations on the water source area for the Middle Route Project of South-to-North Water Diversion and ecosystem services outflows theory. The basic principle of assessment is the direct and opportunity cost for ecological conservation and environmental protection in the water source area deduct nationally-financed PES and internal effect. Then the scope and the criteria methods were determined, and internal effect was put forward to define benefits brought from water source area. Finally, Shiyan City, which is the main water source area for the Project of Water Diversion, was analyzed by this model and its payment was calculated. The results showed that: (1) during 2003–2050, the total direct cost and opportunity cost would reach up to 262.70 billion and 256.33 billion Chinese Yuan (CNY, 2000 constant prices), i.e., 50.61% and 49.38% of total cost, respectively; (2) Shiyan City would gain 0.23, 0.06 and 0.03 CNY/m3 in 2014–2020, 2021–2030, and 2031–2050, respectively. 展开更多
关键词 waterSHED payment for ecosystem services ecosystem services cost-benefit analysis Middle Route project of south-to- north water diversion
原文传递
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
11
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern Route south-to-north water diversion project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
南水北调西线工程水源区可调水量“十问”
12
作者 胡鹏 王浩 +13 位作者 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 《中国工程科学》 CSCD 北大核心 2024年第2期210-223,共14页
南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区... 南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区及其下游水资源开发利用、水生态环境、水力发电、航运等方面影响的角度,提出了与水源区可调水量相关的10个问题;以长江上游分布式水文模型为基础,建立了南水北调西线工程水源区可调水量模拟分析模型,力图系统、定量地回答所提问题。本文的主要研究结论有:在仅考虑满足水源区河道内外生态环境和经济社会需水的前提下,“上线+下线”组合方案多年平均可调水量为1.59×10^(10)m^(3),“完全下线”方案在建设岗托水库进行联调时,多年平均可调水量将达到1.74×10^(10)m^(3);在综合考虑调水对水源区水平衡、水力发电和航运影响及其可接受程度后,南水北调西线水源区可调水量为1.22×10^(10)~1.26×10^(10)m^(3)。长远来看,应谋划西南片区水网与国家水网主骨架、“大动脉”的连接与融合,在减小南水北调西线工程调水影响的同时,提高南水北调西线工程的整体供水能力以及对气候变化等外部条件的适应性。 展开更多
关键词 南水北调西线工程 水源区 可调水量 生态需水 跨流域调水
下载PDF
综合水价内涵、形成机制及实施路径探析
13
作者 秦长海 武文红 +2 位作者 何凡 姜珊 王浩 《中国水利》 2024年第10期20-24,共5页
在我国南水北调工程受水区水价管理问题分析的基础上,考虑我国南水北调受水区推进综合水价改革的现实需求,参考电价和天然气价格形成机制,系统解析了综合水价内涵及形成机制,明确综合水价具有区域水资源一体化管理、各类水源成本统一核... 在我国南水北调工程受水区水价管理问题分析的基础上,考虑我国南水北调受水区推进综合水价改革的现实需求,参考电价和天然气价格形成机制,系统解析了综合水价内涵及形成机制,明确综合水价具有区域水资源一体化管理、各类水源成本统一核算和用户终端水价差异化核定特征,提出综合水价需具备工程一体化、管理一体化、监管制度化的实施基础,通过供给侧一体化定价、用户侧差别化定价和管理侧梯次化推进落实综合水价改革,最后提出了推进综合水价改革的相关建议,为我国综合水价改革提供技术支撑,并服务于相关决策的制定。 展开更多
关键词 水资源 综合水价 南水北调 机制 水资源费(税)
下载PDF
局部降温对输水渠道水华抑制的影响分析
14
作者 张雅卓 宋芷萱 +2 位作者 姚烨 闫琳琳 徐楚涵 《水资源与水工程学报》 CSCD 北大核心 2024年第2期130-138,148,共10页
南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象... 南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象条件的工程措施基础上,建立了澎河—沙河渡槽段平面二维水动力和水质模型,研究了通风位置、通风温度和通风时长等因素对输水渠道水温和藻类的影响。研究表明:水温和叶绿素a浓度均与通风位置、通风温度和通风时长有关,通风温度越低、通风时长越长,平均水温和叶绿素a浓度下降幅度越大,平均水温最高可下降约2℃,叶绿素a浓度最大可降低约54.5%,且仅上游和全渠段通风均可有效降低水温和抑制藻类生长,仅下游通风对水温和藻类的影响较小。因此,采取局部降温的方式可以起到一定的降低叶绿素a浓度的作用,综合考虑藻类抑制效果和工程成本,在水华易爆发渠段的上游通冷风是行之有效的工程措施。 展开更多
关键词 输水渠道水华 局部降温 通冷风 叶绿素A 水温 数值模拟 南水北调中线工程
下载PDF
南水北调中线水源区植被指数时空变化分析
15
作者 白景锋 张海军 白云帆 《湖北农业科学》 2024年第2期205-210,共6页
通过单线性回归(SLOPE)和地理加权回归(GWR)法,用植被指数(NDVI)研究南水北调中线水源区的植被分布变化趋势及机制,为保障水量和水质提供理论支撑。结果表明,2000—2019年水源区NDVI和入库流量呈现同步增长,植被逐渐变好,2007年以前NDV... 通过单线性回归(SLOPE)和地理加权回归(GWR)法,用植被指数(NDVI)研究南水北调中线水源区的植被分布变化趋势及机制,为保障水量和水质提供理论支撑。结果表明,2000—2019年水源区NDVI和入库流量呈现同步增长,植被逐渐变好,2007年以前NDVI增长幅度大,2008—2011年处于波动阶段,2012年以后增长幅度减小;NDVI变化最明显的是研究区东北部、西部和丹江口库区周边,这些区域地势相对低平、人口集中,中山和高山区NDVI变化不大;高程、坡度、人口数和城镇化是影响水源区NDVI分布的主要因素,降水、气温和产业比重是次要因素;各因素影响的强度和方向在空间上有异质性,自然地理因素对NDVI影响的最显著范围为高程1090 m以下、年均降水量980 mm以上的区域,人文地理因素影响的显著范围区是人口密度大、城镇化率高的地区。 展开更多
关键词 南水北调中线水源区 NDVI 时空变化
下载PDF
基于生态补偿的南水北调后续工程水价研究
16
作者 黄德春 潘星月 贺正齐 《水电能源科学》 北大核心 2024年第4期201-204,共4页
制定科学合理的跨流域调水工程水价是开展水源区生态补偿的重要途径之一。在现有水价的基础上,新增生态补偿作为水价的重要组成部分,运用机会成本法测算南水北调东线工程水源区生态补偿标准,并引入社会发展阶段系数和政府支付能力系数... 制定科学合理的跨流域调水工程水价是开展水源区生态补偿的重要途径之一。在现有水价的基础上,新增生态补偿作为水价的重要组成部分,运用机会成本法测算南水北调东线工程水源区生态补偿标准,并引入社会发展阶段系数和政府支付能力系数对其进行修正,构建计入生态补偿的南水北调后续工程水价定价模型。以南水北调东线一期工程胶东干线为例,得到2016、2020年水源区的理论生态补偿标准分别为116.121、199.992亿元,在现行价格基础上水价需分别提高0.93、4.51元/m^(3)。结果表明,生态补偿会耗费大量资金,只有当工程调水能力达到规划设计规模时,持续性调水才能逐步降低供水成本,否则水价会超出受水区的承受范围,工程效益也难以发挥。 展开更多
关键词 生态补偿 南水北调后续工程 机会成本 水价定价
下载PDF
水网布局下黄河流域应对极端枯水的关键科学问题
17
作者 王煜 彭少明 +1 位作者 郑小康 尚文绣 《水科学进展》 EI CAS CSCD 北大核心 2024年第1期11-23,共13页
变化环境下极端气象水文事件频发,长江、黄河面临同枯风险。在国家水网建设背景下,为提高长江、黄河同枯的极端不利情景下黄河流域水资源安全保障能力,本文分析了长江、黄河两大流域水资源安全面临的现实问题,识别了变化环境下大型流域... 变化环境下极端气象水文事件频发,长江、黄河面临同枯风险。在国家水网建设背景下,为提高长江、黄河同枯的极端不利情景下黄河流域水资源安全保障能力,本文分析了长江、黄河两大流域水资源安全面临的现实问题,识别了变化环境下大型流域枯水遭遇—水危机形成—跨流域调水潜力—多线路成网互济—极端枯水下水资源安全保障中亟需破解的关键科学问题,构建了水网布局下黄河流域应对极端枯水的总体研究框架,提出该领域重点研究方向包括:变化环境下长江、黄河极端枯水遭遇规律与空间变异机制,水危机风险多链路传导与复合影响定量评估,极端枯水下跨流域调水挖潜增供,长江和黄河跨流域联合调配与多线路互济精细化调控、极端枯水下流域水资源韧性提升优化调控等。 展开更多
关键词 极端枯水 枯水遭遇 水危机 跨流域水资源调配 水资源系统韧性 南水北调 黄河 长江
下载PDF
1960—2020年南水北调区域极端气象要素变化分析
18
作者 张金萍 段德润 +2 位作者 李杜白 李学淳 苏少辉 《水资源与水工程学报》 CSCD 北大核心 2024年第1期1-8,共8页
南水北调工程会引起所涉区域极端气候发生变化,同时极端气候事件对调水工程运行也存在影响。研究以1960—2020年气象观测数据为基础构建极端气象要素指标体系,采用变化范围法(RVA)与集对分析法(SPA)对南水北调影响区极端气象要素的改变... 南水北调工程会引起所涉区域极端气候发生变化,同时极端气候事件对调水工程运行也存在影响。研究以1960—2020年气象观测数据为基础构建极端气象要素指标体系,采用变化范围法(RVA)与集对分析法(SPA)对南水北调影响区极端气象要素的改变程度进行量化计算,揭示了经济发展、气候变化与南水北调工程影响下区域极端气象要素的演变规律。结果表明:在经济发展与气候变化影响下,1960—2020年南水北调影响区极端气象要素指标综合改变度总体为上升趋势,并出现了明显的区域差异性,中线地区极端气候改变度显著大于东线,而两线水源区变化程度低于输水区和受水区;调水前后对比分析表明,工程调水对中线的影响大于东线,且受水区极端气象要素变化程度更为明显;对极端气象要素分析发现,极端蒸发受气候变化与经济发展影响显著,极端气温受调水工程影响变化较大,极端降水受外界扰动变化不明显。 展开更多
关键词 极端气象要素 变化范围法 集对分析法 综合改变度 南水北调工程
下载PDF
南水北调西线工程上线水源区大型底栖动物群落结构及环境驱动因子 被引量:1
19
作者 张丰搏 胡鹏 +3 位作者 闫龙 唐家璇 闫肖瑶 王玉莲 《水资源保护》 EI CSCD 北大核心 2024年第1期135-141,共7页
为评估南水北调西线工程上线水源区大型底栖动物群落结构及环境驱动因子,于2022年7月(汛期)和11月(非汛期)开展监测采样工作。采用生物多样性指数和丰度-生物量比较曲线(ABC曲线)作为大型底栖动物群落特征参数,分析大型底栖动物群落在... 为评估南水北调西线工程上线水源区大型底栖动物群落结构及环境驱动因子,于2022年7月(汛期)和11月(非汛期)开展监测采样工作。采用生物多样性指数和丰度-生物量比较曲线(ABC曲线)作为大型底栖动物群落特征参数,分析大型底栖动物群落在水源区的结构,并对其进行多元排序和Pearson相关性分析。结果表明:共采集45种大型底栖动物,隶属于4门5纲10目32科44属,其中优势种8种,所有优势物种出现频率均大于50%,水源区大型底栖动物群落结构一致性较高;水源区Margalef丰富度指数、Shannon-Wiener多样性指数和Pielou均匀度指数均值分别为4.01、1.68、0.61;多数采样区域大型底栖动物的ABC曲线呈纠缠态势,其丰度和生物量累积百分比的差值面积在0附近波动,群落以小个头物种为主;优势种以耐污值低的敏感种类为主,说明河流几乎不受污染,水体清洁;pH值是影响水源区大型底栖动物群落结构的主要环境驱动因子。 展开更多
关键词 南水北调西线工程 大型底栖动物群落 生物多样性指数 ABC曲线 环境驱动因子
下载PDF
高雷诺数下倒虹吸闸墩绕流水力特性
20
作者 贺蔚 周红星 +3 位作者 秦杭晓 曾庆林 张健 徐辉 《水电能源科学》 北大核心 2024年第4期155-159,共5页
为研究倒虹吸出口闸墩绕流特性,以南水北调某典型倒虹吸为例,基于Flow3D软件建立倒虹吸模型,根据现场原型实测水位、流速进行模型验证;利用该模型模拟了雷诺数6.17×10^(6)~9.38×10^(6)范围下闸墩绕流特性。结果表明,高雷诺数... 为研究倒虹吸出口闸墩绕流特性,以南水北调某典型倒虹吸为例,基于Flow3D软件建立倒虹吸模型,根据现场原型实测水位、流速进行模型验证;利用该模型模拟了雷诺数6.17×10^(6)~9.38×10^(6)范围下闸墩绕流特性。结果表明,高雷诺数条件下,随着雷诺数的增加,闸墩绕流造成的液面波动幅度增加,中墩液面波动显著大于边墩;闸墩后的尾涡量持续增加,雷诺数对斯特劳哈尔数影响不大;边侧闸墩受力的非对称性明显,边墩闸室间特征流速偏流比存在先增大再减小的变化规律,偏流效应造成的离心距不断增加。本研究可针对性改善输水工程水流流态。 展开更多
关键词 南水北调中线工程 卡门涡街 闸墩绕流 偏流效应 倒虹吸
下载PDF
上一页 1 2 76 下一页 到第
使用帮助 返回顶部