A new kind of corrosion resistant steelfor cargo oiltanks(COT)was developed.The influences of finalrolling temperature,cooling rate,and finalcooling temperature on microstructure were investigated.The proper rolling...A new kind of corrosion resistant steelfor cargo oiltanks(COT)was developed.The influences of finalrolling temperature,cooling rate,and finalcooling temperature on microstructure were investigated.The proper rolling process parameters were obtained through multi-pass thermalsimulation test.The finalrolling temperature is about 820 ℃,the finalcooling temperature is about 600 ℃,and the cooling rate should be controlled between 10 ℃/s and 20 ℃/s.Based on the above analysis of the results,three groups of rolling samples by thermo mechanicalcontrolprocess are prepared.The tensile strength,yield strength,and toughness of the corrosion resistant steelare measured,which meet the requirements of DH36 steel,it can instruct the actualrolling production.The corrosion behaviour is also researched by weight loss and electrochemicalimpedance spectroscopic method,and it is found that the steelhas good corrosion resistance performance,the best one is No.3 steel,the corrosion rate of which is about 1/4 of the accepted criterion.展开更多
Nowadays, new retail formats have been growing rapidly in China. Looking into the different retail formats' development deeply, a quantitative method'is proposed for comprehensive appraisal. The proposed method uses...Nowadays, new retail formats have been growing rapidly in China. Looking into the different retail formats' development deeply, a quantitative method'is proposed for comprehensive appraisal. The proposed method uses the retail life cycle to structure the appraisal factors hierarchically as the criteria in the basic framework of the AHP, and obtains the weight of the criteria from ratio-scale matrices as well as the scores of the altemative retail formats from pairwise comparison matrices. And this method is applied to study the different developing level of three retail formats in Xi' an and their developing order is then gained.展开更多
The significance of cultural awareness in foreign language learning is an issue that earns hot discussion in the both fields of linguistics and instructional science. Being different from others, the observing angle i...The significance of cultural awareness in foreign language learning is an issue that earns hot discussion in the both fields of linguistics and instructional science. Being different from others, the observing angle in this paper lies in how the signal is processed. The four skills of listening, speaking, reading and writing are classified, by ways of signal processing, into two categorizes, namely receptive skills to which listening and reading belong, and productive skills to which speaking and writing belong. By analyzing the signal processing progress occurred in each of the four skills, the author is to argue the functions of cultural awareness in each of these four skills, in order to reinforce the importance of emphasizing cultural awareness in the new standards for English in China.展开更多
More and more attention is paid to listening comprehension and learner factors nowadays, but less attention is paid to the effect of short-term memory. By analyzing the function and effect of short-term memory in the ...More and more attention is paid to listening comprehension and learner factors nowadays, but less attention is paid to the effect of short-term memory. By analyzing the function and effect of short-term memory in the process of information in the mind, this essay points out that short-term memory plays a vital role in listening comprehension, and puts forward three most effective ways to improve short-term memory retention.展开更多
In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, ...In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision.展开更多
基金Funded by the National Key Technology Research and Development Program of the Ministry of Science and Technology of China during the“12th Five-Year Plan”(No.2011BAE25B03)
文摘A new kind of corrosion resistant steelfor cargo oiltanks(COT)was developed.The influences of finalrolling temperature,cooling rate,and finalcooling temperature on microstructure were investigated.The proper rolling process parameters were obtained through multi-pass thermalsimulation test.The finalrolling temperature is about 820 ℃,the finalcooling temperature is about 600 ℃,and the cooling rate should be controlled between 10 ℃/s and 20 ℃/s.Based on the above analysis of the results,three groups of rolling samples by thermo mechanicalcontrolprocess are prepared.The tensile strength,yield strength,and toughness of the corrosion resistant steelare measured,which meet the requirements of DH36 steel,it can instruct the actualrolling production.The corrosion behaviour is also researched by weight loss and electrochemicalimpedance spectroscopic method,and it is found that the steelhas good corrosion resistance performance,the best one is No.3 steel,the corrosion rate of which is about 1/4 of the accepted criterion.
基金This research was sponsored by Soft Science Foundation of Xi'an (R200251) and Innovation Foundation for postgraduate students of NWPU (Z20040069).
文摘Nowadays, new retail formats have been growing rapidly in China. Looking into the different retail formats' development deeply, a quantitative method'is proposed for comprehensive appraisal. The proposed method uses the retail life cycle to structure the appraisal factors hierarchically as the criteria in the basic framework of the AHP, and obtains the weight of the criteria from ratio-scale matrices as well as the scores of the altemative retail formats from pairwise comparison matrices. And this method is applied to study the different developing level of three retail formats in Xi' an and their developing order is then gained.
文摘The significance of cultural awareness in foreign language learning is an issue that earns hot discussion in the both fields of linguistics and instructional science. Being different from others, the observing angle in this paper lies in how the signal is processed. The four skills of listening, speaking, reading and writing are classified, by ways of signal processing, into two categorizes, namely receptive skills to which listening and reading belong, and productive skills to which speaking and writing belong. By analyzing the signal processing progress occurred in each of the four skills, the author is to argue the functions of cultural awareness in each of these four skills, in order to reinforce the importance of emphasizing cultural awareness in the new standards for English in China.
文摘More and more attention is paid to listening comprehension and learner factors nowadays, but less attention is paid to the effect of short-term memory. By analyzing the function and effect of short-term memory in the process of information in the mind, this essay points out that short-term memory plays a vital role in listening comprehension, and puts forward three most effective ways to improve short-term memory retention.
文摘In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision.