期刊文献+
共找到1,261篇文章
< 1 2 64 >
每页显示 20 50 100
Some Rock and Soil Mechanical Issues inTGP Construction 被引量:2
1
作者 DaiHuichao 《工程科学(英文版)》 2004年第3期65-73,共9页
The Yangtze Three Gorges Project (TGP) is the key backbone project to develop and harness the Yangtze river in China. As the largest water conservancy project in the world with the earth and rock excavation amounting ... The Yangtze Three Gorges Project (TGP) is the key backbone project to develop and harness the Yangtze river in China. As the largest water conservancy project in the world with the earth and rock excavation amounting up to 102.83×10 6 m 3, it is, therefore, the largest project on a scale of geomechanical engineering. The involvement of numerous domestic and foreign research institutes in the scientific research has promoted the development of geomechanics. Some rock and soil mechanical issues arising during construction of the Three Gorges Project are discussed in this article. 展开更多
关键词 长江三峡工程 岩体 土壤 工程结构测量 边坡稳定性 安全监测
下载PDF
Micromechanical testing and property upscaling of planetary rocks:A critical review 被引量:1
2
作者 Yiwei Liu Guoping Zhang +1 位作者 Jiangmei Qiao Xuhai Tang 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2024年第9期1217-1241,共25页
Knowledge of the mechanical behavior of planetary rocks is indispensable for space explorations.The scarcity of pristine samples and the irregular shapes of planetary meteorites make it difficult to obtain representat... Knowledge of the mechanical behavior of planetary rocks is indispensable for space explorations.The scarcity of pristine samples and the irregular shapes of planetary meteorites make it difficult to obtain representative samples for conventional macroscale rock mechanics experiments(macro-RMEs).This critical review discusses recent advances in microscale RMEs(micro-RMEs)techniques and the upscaling methods for extracting mechanical parameters.Methods of mineralogical and microstructural analyses,along with non-destructive mechanical techniques,have provided new opportunities for studying planetary rocks with unprecedented precision and capabilities.First,we summarize several mainstream methods for obtaining the mineralogy and microstructure of planetary rocks.Then,nondestructive micromechanical testing methods,nanoindentation and atomic force microscopy(AFM),are detailed reviewed,illustrating the principles,advantages,influencing factors,and available testing results from literature.Subsequently,several feasible upscaling methods that bridge the micro-measurements of meteorite pieces to the strength of the intact body are introduced.Finally,the potential applications of planetary rock mechanics research to guiding the design and execution of space missions are environed,ranging from sample return missions and planetary defense to extraterrestrial construction.These discussions are expected to broaden the understanding of the microscale mechanical properties of planetary rocks and their significant role in deep space exploration. 展开更多
关键词 METEORITES Planetary rock mechanics Non-destructive testing Upscaling method Extraterrestrial construction Space exploration
下载PDF
Mechanical characteristics of soil-rock mixtures containing macropore structure based on 3D modeling technology 被引量:3
3
作者 LIU Yong SUN Shao-rui +4 位作者 WEI Ji-hong SONG Jing-lei YU Yong-xiang HE Wei ZHANG Ji-xing 《Journal of Mountain Science》 SCIE CSCD 2020年第9期2224-2240,共17页
Soil-rock mixtures containing macropore(SRMCM)is a kind of geological material with special mechanical properties.Located in the project area of Lenggu hydropower station on the Yalong River,Sichuan Province,China,the... Soil-rock mixtures containing macropore(SRMCM)is a kind of geological material with special mechanical properties.Located in the project area of Lenggu hydropower station on the Yalong River,Sichuan Province,China,there is an extremely unstable Mahe talus slide with a total volume of nearly160 million cubic meters,which is mainly composed of SRMCM.The study on the mechanical properties of SRMCM is of great significance for the engineering construction and safe operation.In this paper,laboratory tests and discrete element numerical tests based on three-dimensional scanning technology were conducted to study the influence of stone content,stone size,and the angle of the macropore structure on shear characteristics of SRMCM.The failure mechanism of SRMCM was discussed from a microscopic perspective.This work explains the internal mechanism of the influence of stone content,stone size,and the angle of the macropore structure on the strength of SRMCM through the microscopic level of stone rotation,force chain distribution,and crack propagation.As the macropore structure that intersects with the preset shear plane at a large angle could act as a skeleton-like support to resist the shear force,the fracture of the weak cemented surface of soil and stone in the macropore structure is an important cause of SRMCM destruction. 展开更多
关键词 soil rock mixtures Macropore structure Mechanical characteristics Discrete element method Shear band
下载PDF
Estimation of soil organic carbon storage and its fractions in a small karst watershed 被引量:2
4
作者 Zhenming Zhang Yunchao Zhou +1 位作者 Shijie Wang Xianfei Huang 《Acta Geochimica》 EI CAS CSCD 2018年第1期113-124,共12页
With few available soil organic carbon(SOC)profiles and the heterogeneity of those that do exist, the estimation of SOC pools in karst areas is highly uncertain.Based on the spatial heterogeneity of SOC content of 23,... With few available soil organic carbon(SOC)profiles and the heterogeneity of those that do exist, the estimation of SOC pools in karst areas is highly uncertain.Based on the spatial heterogeneity of SOC content of 23,536 samples in a karst watershed, a modified estimation method was determined for SOC storage that exclusively applies to karst areas. The method is a "soil-type method" based on revised calculation indexes for SOC storage. In the present study, the organic carbon contents of different soil types varied greatly, but generally decreased with increasing soil depth. The organic carbon content decreased nearly linearly to a depth of 0–50 cm and then varied at depths of 50–100 cm. Because of the large spatial variability in the karst area, we were able to determine that influences of the different indexes on the estimation of SOC storage decreased as follows: soil thickness > boulder content > rock fragment content > SOC content > bulk density. Using the modified formula, the SOC content in the Houzhai watershed in Puding was estimated to range from 3.53 to 5.44 kg m^(-2), with an average value of 1.24 kg m^(-2) to a depth of 20 cm, and from 4.44 to 14.50 kg m^(-2), with an average value of 12.12 kg m^(-2) to a depth of 100 cm. The total SOC content was estimated at 5.39*10^(5) t. 展开更多
关键词 Bare rock rate Estimation method soil organic carbon storage Small watershed KARST
下载PDF
Simulation analysis of construction process of high rock slope's stabilization 被引量:2
5
作者 朱占元 凌贤长 +1 位作者 王宣青 邹祖银 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第2期188-193,共6页
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the u... A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method. 展开更多
关键词 high rock slope STABILITY STABILIZATION construction process simulation elasto-plastic FEM method
下载PDF
Research progress and development direction of low-temperature drilling fluid for Antarctic region 被引量:1
6
作者 SUN Jinsheng WANG Zonglun +5 位作者 LIU Jingping LYU Kaihe HUANG Xianbin ZHANG Xianfa SHAO Zihua HUANG Ning 《Petroleum Exploration and Development》 CSCD 2022年第5期1161-1168,共8页
By combing the characteristics of drilling in Antarctic region, performance requirements on drilling fluid for Antarctic low temperature conditions, and research progress of low temperature drilling fluid, current pro... By combing the characteristics of drilling in Antarctic region, performance requirements on drilling fluid for Antarctic low temperature conditions, and research progress of low temperature drilling fluid, current problems of the drilling fluid have been sorted out, and the development direction of the drilling fluid has been pointed out. Drilling in the Antarctic region mainly includes drilling in snow, ice and subglacial rock formations, and drilling in Antarctic low temperature conditions will face problems in four aspects:(1) low temperature and large temperature changes in the drilling area;(2) likely well leakage and drillstring-sticking in the snow layer, creep in the ice layer, ice chip gathering jamming in the warm ice layer, well wall collapse in the subglacial rock formations;(3) lack of infrastructure and difficulty in logistical support;(4) fragile environment and low carrying capacity. After years of development, progresses have been made on low-temperature drilling fluids for the Antarctic region. Low-temperature petroleum-based drilling fluid, ethanol/ethylene glycol-based drilling fluid, ester-based drilling fluid and silicone oil-based drilling fluid have been developed. However, these drilling fluids have problems such as insufficient low-temperature tolerance, low environmental performance and weak wellbore stability, etc. In order to meet the performance requirements of drilling fluid under low-temperature conditions in Antarctic region, the working mechanisms of low-temperature drilling fluid must be examined in depth;environment-friendly low-temperature base fluid of drilling fluid and related additives must be developed to prepare environmentally friendly low temperature drilling fluid systems;multi-functional integrated adjustment method for drilling fluid must be worked out to ensure well wall stability and improve cutting-carry capacity when drilling ice formations and ice-rock interlayers;and on-site support operation codes must be established to provide technical support for Antarctic drilling. 展开更多
关键词 Antarctic region snow and ice formation subglacial rock formation low-temperature drilling fluid drilling fluid system working mechanism regulation method construction specification
下载PDF
3D-Analysis of Soil-Foundation-Structure Interaction in Layered Soil
7
作者 Mohd Ahmed Mahmoud H. Mohamed +1 位作者 Javed Mallick Mohd Abul Hasan 《Open Journal of Civil Engineering》 2014年第4期373-385,共13页
The analysis of building structure in contact with soil involves an interactive process of stresses and strains developed within the structure and the soil field. The response of Piled-Raft Foundation system to the st... The analysis of building structure in contact with soil involves an interactive process of stresses and strains developed within the structure and the soil field. The response of Piled-Raft Foundation system to the structure is very challenging because there is an important interplay between the component of building structure and the soil field. Herein, soil-foundation-structure interaction of buildings founded on Piled-Raft Foundation is evaluated through 3D-Nonlinear Finite Element Analyses using PLAXIS3D FOUNDATION code. The soil settlements and forces demand of the high-rise building structures and foundation is computed. The parametric study affecting the soil-foundation-structure response has been carried out. The parameters such as construction phasing, sequential loading, building aspect ratios, soil failure models and thickness proportion of soil field stiff layer, are considered. It is concluded that the interaction of building foundation-soil field and super-structure has remarkable effect on the structure. 展开更多
关键词 FOUNDATION Piled-Raft FOUNDATION soil Models soil Field FINITE Element Method SEQUENTIAL LOADING construction Phase
下载PDF
土与强风化岩双元边坡圆弧-平面破坏模式与支护设计方法 被引量:1
8
作者 李连祥 贾斌 +2 位作者 赵忠杨 韩志霄 李胜群 《重庆大学学报》 CAS CSCD 北大核心 2024年第2期1-13,共13页
为了探究土与强风化岩边坡中强风化岩不破坏的临界坡率及稳定性判断方法,基于济南地层,得出适用于数值模拟的土层参数,并利用强度折减法求出边坡的临界坡率,为施工提供参考。针对强风化岩不破坏的边坡,运用改进的瑞典条分法求出边坡安... 为了探究土与强风化岩边坡中强风化岩不破坏的临界坡率及稳定性判断方法,基于济南地层,得出适用于数值模拟的土层参数,并利用强度折减法求出边坡的临界坡率,为施工提供参考。针对强风化岩不破坏的边坡,运用改进的瑞典条分法求出边坡安全系数解析解,并利用滑移线场法求出滑移线,为安全系数解析解的应用提供依据。结果表明,岩层厚度超过边坡高度1/2或坡率大于1:0.5时,强风化岩一定破坏;解析解得出的安全系数偏小,有利于工程安全;针对土与强风化岩边坡,文中结果可确定边坡破坏区域,设计支护方案。 展开更多
关键词 边坡稳定 安全系数 土岩双元边坡 瑞典条分法 滑移线场法 解析解
下载PDF
深部破碎软岩巷道超前控顶加固及控制爆破技术
9
作者 汪禹 张西良 +4 位作者 李龙福 殷登才 崔正荣 王小兵 金科 《爆破》 CSCD 北大核心 2024年第3期75-84,共10页
随着矿山开采深度逐渐增加,深部破碎围岩工程地质条件转为复杂多变,极大程度上影响巷道等工程施工过程及后续使用安全;为确保深部破碎软岩巷道施工过程中安全及质量,提出了软岩巷道超前控顶加固及控制爆破技术。针对钟九铁矿-550 m水平... 随着矿山开采深度逐渐增加,深部破碎围岩工程地质条件转为复杂多变,极大程度上影响巷道等工程施工过程及后续使用安全;为确保深部破碎软岩巷道施工过程中安全及质量,提出了软岩巷道超前控顶加固及控制爆破技术。针对钟九铁矿-550 m水平6号交岔点岩体裂隙极为发育、稳定性差等特点,拟采用超前控顶措施加固顶板围岩,提高深部破碎软岩巷道的承载力。为便于6号交岔点掘进施工,沿6号交岔点东北侧方向划分17个掘进区,并采用“四步”台阶法分段施工。针对同段起爆数码电子雷管,起爆器系统可随机设置单发雷管起爆间隔时间为3~5 ms,实现同段炮孔单孔单响,降低爆破振动对6号交岔点影响。根据不同掘进区总体岩性情况,优化支护方式(管棚支护、W型钢带及锚索支护等联合支护方式等),确保6号交岔点后续使用期安全。试验结果表明:采用超前控顶加固、控制分区爆破技术,降低破碎软岩巷道顶板偏帮、下沉,保证6号交岔点断面成型效果,削减其支护、后期维护等综合成本达8.7%,该技术可为类似巷道施工提供一定指导建议。 展开更多
关键词 破碎软岩 台阶法施工 支护方式 数码电子雷管
下载PDF
离散元法在月面建造力学分析中的研究及应用
10
作者 周诚 李浩然 +1 位作者 夏一峰 周燕 《中国粉体技术》 CAS CSCD 2024年第4期26-42,共17页
【目的】为了深入了解月面建造过程中月壤的力学特性,评估月基装备性能,优化月面建造作业,开展离散元法(discrete element method,DEM)在月壤接触力学领域的应用调查研究,旨在利用离散元法为未来月球基地建设提供理论指导和技术支持。... 【目的】为了深入了解月面建造过程中月壤的力学特性,评估月基装备性能,优化月面建造作业,开展离散元法(discrete element method,DEM)在月壤接触力学领域的应用调查研究,旨在利用离散元法为未来月球基地建设提供理论指导和技术支持。【研究现状】基于地质勘探、资源采集及运输、建造作业等月面原位建造任务场景,分析月壤颗粒的建模与参数标定,介绍月基装备与月壤的接触作用研究现状,概述离散元法在钻-壤作用模拟、铲-壤作用模拟、轮-壤作用模拟及足-壤作用模拟中的应用,探讨基于离散元法的天然月基承载力分析。【结论与展望】提出降低几何模型复杂度、优化粒间接触模型及参数是提高宏观尺度月壤离散元建模精度以应对大规模月面建造场景的有效方法。认为利用离散元法进行铲挖式月壤采集装置及足式月球车设计在未来可以为月面建造提供可靠的技术支持。面向月面建造,离散元法将在水冰资源利用、建筑物月面承载力分析等方面提供科学依据。 展开更多
关键词 月面建造 离散元法 月壤采集 月基装备 承载力
下载PDF
极高地应力硬岩隧道变形规律及施工优化研究
11
作者 王昆 张粒 +2 位作者 廖峻 朱仁景 吴胜忠 《公路交通技术》 2024年第3期124-132,共9页
依托重庆市巫镇高速宝山隧道工程,采用数值模拟方法开展极高地应力无仰拱硬岩隧道的变形规律和施工优化研究,对不同施工工法、施工步距进行了比选。研究表明:1)不同施工工法隧道变形规律基本一致,竖向位移大于水平位移且基底隆起较拱顶... 依托重庆市巫镇高速宝山隧道工程,采用数值模拟方法开展极高地应力无仰拱硬岩隧道的变形规律和施工优化研究,对不同施工工法、施工步距进行了比选。研究表明:1)不同施工工法隧道变形规律基本一致,竖向位移大于水平位移且基底隆起较拱顶沉降更明显,全断面法施工隧道变形收敛速度最快;2)不同施工工法均为基底应力释放程度最大,释放后基底应力仅为初始的55%,且全断面法拱脚处应力集中范围最小;3)隧道周围的岩体以拉伸破坏为主,部分位置存在剪切破坏,施工工法对塑性区的水平影响范围有限;4)该隧道选用全断面法施工可行且较经济。全断面法不同施工步距变形及应力分布基本规律相同,施工步距越大,水平竖向位移越大,拱脚处应力集中越显著,最小主应力值也越大,综合考虑现场施工建设速度、变形收敛情况、应力分布状态,采用1.6 m步距较经济合理。 展开更多
关键词 极高地应力 硬岩隧道 变形规律 施工工法 施工优化
下载PDF
土石混合体边坡力学特性及稳定性分析方法研究进展
12
作者 石广斌 周泽凯 《金属矿山》 CAS 北大核心 2024年第10期202-215,共14页
土石混合体边坡在我国分布比较广泛,在降雨、地震等外力作用下会产生滑坡等变形破坏现象。归类和分析了土石混合体力学特性物理模型试验和数值模拟试验以及边坡稳定性分析方法研究成果,得出块石尺寸和含石量是影响土石混合体剪切特性主... 土石混合体边坡在我国分布比较广泛,在降雨、地震等外力作用下会产生滑坡等变形破坏现象。归类和分析了土石混合体力学特性物理模型试验和数值模拟试验以及边坡稳定性分析方法研究成果,得出块石尺寸和含石量是影响土石混合体剪切特性主要因素,块石排列可以忽略不计;雨水和冻胀等能够显著改变土石胶结介质力学参数,降低率约为20%;通过对比多种稳定性分析方法,认为离散单元法或数值流形法、连续—非连续耦合方法能够更有效分析具有强烈非均质体的土石混合体边坡。在总结已有研究成果和考虑土石混合体介质特点的基础上,提出了土石混合体力学特性和此类边坡稳定性分析方法研究上存在的不足之处,即:①在获取土—石胶结接触面力学参数相关特性指标上,缺少精密的试验设备或仪器,无法准确地测得接触面参数;②在土—石胶结接触面力学模型构建上,忽略了土体与块石间存在嵌入等情况,无法充分反映土—石胶结接触面在外力作用下的力学行为;③目前土石混合体边坡稳定性研究主要关注坡体力学特性以及降雨等作用下的相关参数变化,很少涉及多应力场(如降雨、地震、低温等组合作用)下的土石混合体边坡数值模拟,无法满足实际工程问题的相关需求;④现阶段构建三维土石混合体边坡数值模型上,仅有少数考虑结合数字图像等计算机技术还原真实块体下的三维数值模型,尚需进一步研究分析块石接触面差异分布、超大粒径块石模拟等相关问题。 展开更多
关键词 土石混合体边坡 力学特性 稳定性分析方法 土—石胶结接触面参数
下载PDF
改良高液限土填筑路基施工技术应用
13
作者 康永兴 《工程建设与设计》 2024年第14期149-151,共3页
结合某高速公路工程的实际情况,通过试验路段比对换土法、改良法、加筋法、排水法、预压法、包芯法6种处置方法改良高液限土路基的稳定性,并对其经济效益和环境效益进行了分析。结果表明,包芯法改良高液限土路基施工不仅可以有效提高路... 结合某高速公路工程的实际情况,通过试验路段比对换土法、改良法、加筋法、排水法、预压法、包芯法6种处置方法改良高液限土路基的稳定性,并对其经济效益和环境效益进行了分析。结果表明,包芯法改良高液限土路基施工不仅可以有效提高路基压实度,还可以节约工程成本,减少污染,保护生态。 展开更多
关键词 高液限土路基 处置方法 施工工艺 高速公路
下载PDF
高密度电阻率法在建筑渣土填埋范围勘察中的应用
14
作者 李志刚 《水科学与工程技术》 2024年第1期75-77,共3页
地势较低区域、洼地、河堤或河道中间经常有建筑渣土堆积,造成环境污染。对建筑渣土填埋的治理,首先查明建筑渣土填埋范围,经过现场勘察,采用高密度电阻率法对建筑渣土填埋进行地球物理勘探,通过野外数据采集、数据转换、地形矫正、二... 地势较低区域、洼地、河堤或河道中间经常有建筑渣土堆积,造成环境污染。对建筑渣土填埋的治理,首先查明建筑渣土填埋范围,经过现场勘察,采用高密度电阻率法对建筑渣土填埋进行地球物理勘探,通过野外数据采集、数据转换、地形矫正、二维反演和成果解释,完成对建筑渣土填埋范围的探测,为计算建筑渣土储量提供依据。 展开更多
关键词 高密度电阻率法 建筑渣土 二维反演
下载PDF
基于细观模拟的土石混合体固结特性研究 被引量:1
15
作者 龚文平 赵晓宇 +1 位作者 李馨馨 赵超 《工程力学》 EI CSCD 北大核心 2024年第10期118-127,共10页
土石混合体具有特殊的结构特性,当前数值模拟研究主要聚焦于强度和变形特征,较少从细观尺度探究其固结特性。该文引入无厚度单元法模拟土-石接触面并验证了其有效性,在此基础上构建了土石混合体结构随机分布模型,从细观尺度上探究了内... 土石混合体具有特殊的结构特性,当前数值模拟研究主要聚焦于强度和变形特征,较少从细观尺度探究其固结特性。该文引入无厚度单元法模拟土-石接触面并验证了其有效性,在此基础上构建了土石混合体结构随机分布模型,从细观尺度上探究了内部结构特征(土-石接触面参数、块石形状、含量及级配)对土石混合体固结特性的影响规律。结果表明:当块石含量不变时,含圆形块石的土石混合体固结沉降最小,其次为椭圆形,含多边形块石的土石混合体固结沉降最大;随着含石量的增加,土石混合体沉降和孔隙比均减小;当含石量一定时,含大尺寸块石较多的土石混合体发生的固结程度较高。 展开更多
关键词 土石混合体 固结特性 土-石接触面 细观结构模拟 有限单元法
下载PDF
岩土成层条件下抗滑桩计算的改进有限差分法 被引量:2
16
作者 张海洋 宋绪国 +1 位作者 郭帅杰 闫穆涵 《铁道标准设计》 北大核心 2024年第6期31-36,共6页
滑坡治理工程中抗滑桩可能布置于层状土层、层状岩层,或岩、土成层等各种地质条件下,现行规范对于该问题建议将成层地基按加权平均法换算成等效的当量地基系数,但对于地层差异性较大的岩土成层地基其适用性有待研究。为解决这一问题,基... 滑坡治理工程中抗滑桩可能布置于层状土层、层状岩层,或岩、土成层等各种地质条件下,现行规范对于该问题建议将成层地基按加权平均法换算成等效的当量地基系数,但对于地层差异性较大的岩土成层地基其适用性有待研究。为解决这一问题,基于Euler-Bernoulli梁理论建立抗滑桩受荷段、嵌固段整体受荷分析模型,采用改进有限差分法提出抗滑桩全桩内力求解的统一矩阵运算式,避免常规有限差分方法将桩身分为受荷段和嵌固段及利用滑面处连续性条件求解的复杂迭代过程;基于2个边坡工程抗滑桩治理案例,证明改进有限差分法对岩土成层条件下抗滑桩分析的可靠性,计算用时仅需1.2 s左右,相比已有方法进一步提高抗滑桩分析设计的计算效率。 展开更多
关键词 边坡工程 抗滑桩 岩土成层 改进有限差分法 全桩内力分析
下载PDF
基于总安全系数法的宜兴高速铁路隧道支护参数优化与试验 被引量:1
17
作者 谢壁婷 肖明清 +2 位作者 徐晨 陈文鹏 王克金 《铁道建筑》 北大核心 2024年第1期86-89,共4页
隧道支护结构设计总安全系数法的应用,可实现隧道支护结构设计由类比设计向量化设计转变。依托宜兴高速铁路(宜昌—兴山)优化试验段,基于总安全系数法对隧道支护参数进行优化,结合现场测试将优化后支护参数的设计值和实测值进行对比。... 隧道支护结构设计总安全系数法的应用,可实现隧道支护结构设计由类比设计向量化设计转变。依托宜兴高速铁路(宜昌—兴山)优化试验段,基于总安全系数法对隧道支护参数进行优化,结合现场测试将优化后支护参数的设计值和实测值进行对比。结果表明:与原设计方案相比,Ⅲ、Ⅳ、Ⅴ级围岩条件下,优化后支护参数的经济性指标最多可降低5.24%、23.85%、22.61%;Ⅲ、Ⅳ级围岩条件下,隧道施工进度指标最多可提高29.6%、40.0%。通过现场测试,围岩压力设计值均大于实测值,喷射混凝土层安全系数设计值均小于实测值。优化后支护参数均满足安全要求,总安全系数法可靠。 展开更多
关键词 总安全系数法 支护参数优化 安全系数 现场测试 围岩压力 经济性指标 施工进度指标
下载PDF
复合成层地层盾构隧道施工引起土体变形计算研究
18
作者 魏纲 朱德涵 +3 位作者 王哲 齐永洁 姜海波 项鹏飞 《岩土工程学报》 EI CAS CSCD 北大核心 2024年第5期919-926,共8页
为解决盾构上部多层水平覆土且开挖面内上下水平分层的复合地层条件下盾构施工引起的土体变形问题,在统一土体解析解法的基础上对其中土质条件影响参数进行修正,使其可以进行复合地层条件下的土体变形计算,并对土体移动焦点范围进行了... 为解决盾构上部多层水平覆土且开挖面内上下水平分层的复合地层条件下盾构施工引起的土体变形问题,在统一土体解析解法的基础上对其中土质条件影响参数进行修正,使其可以进行复合地层条件下的土体变形计算,并对土体移动焦点范围进行了重新的划分。将修正后的统一土体解析解法与类随机介质理论相结合,得到可以解决盾构开挖面上存在多种土层情况的计算方法,并且可适用于任意开挖面形状的盾构施工。研究结果表明:经过多组工程案例验算,验证了方法的可行性;开挖面上某一土层厚度等量增加会使土体变形发生非线性变化;由于土体损失比变形传递路径对土体变形的影响更大,相同洞径比下的土体变形可能存在差异。 展开更多
关键词 复合地层 盾构施工 土体变形 统一土体解析解法 类随机介质理论
下载PDF
基于CPTU数据的海洋土土体分层研究
19
作者 刘建平 冯治国 +2 位作者 余颂 戚雯璐 陈松庭 《河南科学》 2024年第10期1443-1449,共7页
准确识别海洋土土体分层是探明海床地质条件和开展海洋岩土工程建设的前提.海洋工程中常采用钻探技术识别土体分层,但该方法在海底取样过程中会受海洋复杂环境影响,存在显著的取样扰动,且取样后进行室内土工试验的样本数量有限,导致土... 准确识别海洋土土体分层是探明海床地质条件和开展海洋岩土工程建设的前提.海洋工程中常采用钻探技术识别土体分层,但该方法在海底取样过程中会受海洋复杂环境影响,存在显著的取样扰动,且取样后进行室内土工试验的样本数量有限,导致土体分层结果存在较大的不确定性,因此亟须合理可靠的海洋土土体分层识别方法.基于原位孔压静力触探试验(CPTU),通过贝叶斯方法结合既有工程经验和目标场地的CPTU数据,实现较为准确的海洋土土体分层识别.并通过模拟数据和浙江省甬舟铁路金塘海底隧道工程的勘察数据验证本文方法可靠性.结果表明,本研究提出方法可识别海洋土最有可能的层数及各层土体的厚度,可进一步为勘探规划和海洋岩土工程设计提供支持. 展开更多
关键词 海洋土体 工程建设 CPTU 贝叶斯方法 土层划分
下载PDF
堆石混凝土高拱坝施工期温度应力仿真分析 被引量:1
20
作者 李太阳 唐晓玲 +1 位作者 吴弦谦 杨韬 《贵州大学学报(自然科学版)》 2024年第1期110-118,共9页
为研究堆石混凝土高拱坝施工期温度场和应力场的分布特点,并探究堆石混凝土在高拱坝上的适用性,本文运用数值仿真及顺序耦合法,综合考虑堆石混凝土弹模变化、堆石混凝土入仓温度、环境气候变化等因素,对不同温控措施的堆石混凝土高拱坝... 为研究堆石混凝土高拱坝施工期温度场和应力场的分布特点,并探究堆石混凝土在高拱坝上的适用性,本文运用数值仿真及顺序耦合法,综合考虑堆石混凝土弹模变化、堆石混凝土入仓温度、环境气候变化等因素,对不同温控措施的堆石混凝土高拱坝进行施工期全过程仿真计算。对比分析不同温控措施下高拱坝施工期的温度场和应力场,结果表明:不同温控工况下,坝体温度场和应力场的分布规律基本一致,施工期温度应力与混凝土入仓温度相关,运行期坝体应力随环境气温变化;应力线性化后最大拉应力分别为1.68 MPa、1.60 MPa、1.48 MPa。因此,堆石混凝土运用于高拱坝时,在分缝浇筑的情况下,仅需采取简单温控措施即可满足温度防裂要求。 展开更多
关键词 堆石混凝土 高拱坝 有限元法 施工期 温度应力 温控措施
下载PDF
上一页 1 2 64 下一页 到第
使用帮助 返回顶部