Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
1
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF
Experimental study on stability of sunken large diameter cylindrical structure on sandy seabed during construction period 被引量:1
2
作者 秦崇仁 庞红犁 +1 位作者 李世森 张伟 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2002年第4期581-595,共15页
A systematic experimental research work is done for the stability of sunken large diameter cylinder during construction period. It is the first research that gives the method for assessing the stability of the larger ... A systematic experimental research work is done for the stability of sunken large diameter cylinder during construction period. It is the first research that gives the method for assessing the stability of the larger diameter cylindrical structure, a set of values is derived also for the critical stability indices of the large diameter cylinder sunken to the sandy seabed. 展开更多
关键词 Sunken large diameter cylinder sandy seabed stability during construction period assessing method critical stability index
下载PDF
Target for Power Construction in 9th Five-year Plan Period Set-up
3
《Electricity》 1996年第4期19-19,共1页
According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
关键词 In Target for Power construction in 9th Five-year Plan period Set-up
下载PDF
Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
4
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co.. Ltd.) 《Electricity》 1998年第3期34-37,共4页
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon... The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period. 展开更多
关键词 Trial Demonstration of SupervisionDuring the Quality Guaranteed period in construction of Power Plant
下载PDF
Dynamic Deformation Monitoring for Long-Span Bridges under Construction and EMD De-noising Method
5
作者 Shengxiang Huang Chao Kang Wen Zhang 《Journal of Civil Engineering and Architecture》 2016年第7期853-859,共7页
Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traff... Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traffic. To exactly evaluate the periodic alignments, internal forces and safety, geometrical and physical monitoring are needed during construction. This study aims at the requirement of dynamic geometric monitoring during Sutong Bridge construction, and introduces the realization and observing schemes of the self-developed GPS real-time dynamic geometrical deformation monitoring system. Affected by wind load and construction circumstance, GPS (global positioning system) monitoring signal contains a variety of noise. And the useful signal can be extracted from the signal after de-noising the noises. A de-noising method based on EMD (empirical mode decomposition) model is introduced here to process the bridge dynamic monitoring data, and with the wavelet threshold de-noising method are compared. The result shows that the EMD method has good adaptability, is free from the choice of wavelet bases and the number of decomposition layer. The method is an effective de-noising method for dynamic deformation monitoring to large-span bridges. 展开更多
关键词 Long-span bridge construction period dynamic deformation monitoring empirical mode decomposition de-noising.
下载PDF
Risk Assessment and Prediction of Construction Project Based on 1D-CNN-Attention-BP
6
作者 Yawen Zhong 《World Journal of Engineering and Technology》 2021年第4期861-876,共16页
In order to solve the problem of low accuracy of construction project duration prediction, this paper proposes a CNN attention BP combination model </span><span style="font-family:"white-space:... In order to solve the problem of low accuracy of construction project duration prediction, this paper proposes a CNN attention BP combination model </span><span style="font-family:"white-space:normal;">project risk prediction model based on attention mechanism, one-dimensional </span><span style="font-family:"white-space:normal;">convolutional neural network (1d-cnn) and BP neural network. Firstly, the literature analysis method is used to select the risk evaluation index value of construction project, and the attention mechanism is used to determine the weight of risk factors on construction period prediction;then, BP neural network is used to predict the project duration, and accuracy, cross entropy loss function and F1 score are selected to comprehensively evaluate the performance of 1d-cnn-attention-bp combined model. The experimental results show that the duration risk prediction accuracy of the risk prediction model proposed in this paper is more than 90%, which can meet the risk prediction of construction projects with high accuracy. 展开更多
关键词 construction Project Risk 1D-CNN-Attention-BP One Dimensional Convolutional Neural Network construction period Forecast Risk Identification
下载PDF
Seepage field distribution and water inflow laws of tunnels in water-rich regions 被引量:7
7
作者 LI Zheng CHEN Zi-quan +2 位作者 HE Chuan MA Chun-chi DUAN Chao-ran 《Journal of Mountain Science》 SCIE CSCD 2022年第2期591-605,共15页
Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the str... Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the structural safety of tunnels in water-rich regions.In this paper,a tunnel seepage model testing system was used to conduct experiments of the grouting circle and primary support with different permeability coefficients.The influences of the supporting structures on the water inflow laws and the distribution of the water pressure in the tunnel were analyzed.With the decrease in the permeability coefficient of the grouting circle or the primary support,the inflow rate of water into the tunnel showed a non-linear decreasing trend.In comparison,the water inflow reduction effect of grouting circle was much better than that of primary support.With the increase of the permeability coefficient of the grouting ring,the water pressure behind the primary lining increases gradually,while the water pressure behind the grouting ring decreases.Thus,the grouting of surrounding rock during the construction of water-rich tunnel can effectively weaken the hydraulic connection,reduce the influence range of seepage,and significantly reduce the decline of groundwater.Meanwhile,the seepage tests at different hydrostatic heads and hydrodynamic heads during tunnel operation period were also conducted.As the hydrostatic head decreased,the water pressure at each characteristic point decreased approximately linearly,and the water inflow rate also had a gradual downward trend.Under the action of hydrodynamic head,the water pressure had an obvious lagging effect,which was not conducive to the stability of the supporting structures,and it could be mitigated by actively regulating the drainage rate.Compared with the hydrostatic head,the hydrodynamic head could change the real-time rate of water inflow to the tunnel and broke the dynamic balance between the water pressure and water inflow rate,thereby affecting the stress state on the supporting structures. 展开更多
关键词 Water-rich tunnel Seepage field distribution Water inflow law construction period Operation period
下载PDF
Characteristics of strong-coupling bipolaron qubit in two-dimensional quantum dot in electric field
8
作者 张颖 韩超 额尔敦朝鲁 《Optoelectronics Letters》 EI 2015年第5期386-389,共4页
Based on Lee-Low-Pines(LLP) unitary transformation, this article adopts the variational method of the Pekar type and gets the energy and wave functions of the ground state and the first excited state of strong-couplin... Based on Lee-Low-Pines(LLP) unitary transformation, this article adopts the variational method of the Pekar type and gets the energy and wave functions of the ground state and the first excited state of strong-coupling bipolaron in two-dimensional quantum dot in electric field, thus constructs a bipolaron qubit. The numerical results represent that the time oscillation period T0 of probability density of the two electrons in qubit decreases with the increasing electric field intensity F and dielectric constant ratio of the medium η; the probability density Q of the two electrons in qubit oscillates periodically with the increasing time t; the probability of electron appearing near the center of the quantum dot is larger, while that appearing away from the center of the quantum dot is much smaller. 展开更多
关键词 appearing unitary dielectric periodically excited phonon constructs coordinates variational coherent