期刊文献+
共找到15篇文章
< 1 >
每页显示 20 50 100
Research on Welding Quality Traceability Model of Offshore Platform Block Construction Process
1
作者 Jinghua Li Wenhao Yin +1 位作者 Boxin Yang Qinghua Zhou 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第1期699-730,共32页
Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platf... Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process. 展开更多
关键词 Quality traceability model block construction process welding quality management long short-term memory quality data backtracking query optimization algorithm
下载PDF
Research on Quality Management Measures of Green Building Construction
2
作者 Jie Hong Xiang Xu 《Journal of Architectural Research and Development》 2024年第3期8-13,共6页
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ... Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development. 展开更多
关键词 Green building engineering construction process control Quality management construction publicity
下载PDF
Review of Power Supply and Distribution Construction Technology for Highway Electromechanical Engineering
3
作者 Li Liu 《Journal of Electronic Research and Application》 2024年第2期27-32,共6页
In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan... In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology. 展开更多
关键词 HIGHWAY Mechanical and electrical engineering Power supply and distribution construction technology construction process
下载PDF
Construction Process Control of Large Extra Caissons 被引量:2
4
作者 胡少伟 王红霞 樊建生 《Tsinghua Science and Technology》 SCIE EI CAS 2005年第3期359-363,共5页
The complexity of geotechnical engineering and variability in construction circumstances of large extra caissons make the problem of maintaining appropriate sink attitude quite difficult, especially in keeping sink un... The complexity of geotechnical engineering and variability in construction circumstances of large extra caissons make the problem of maintaining appropriate sink attitude quite difficult, especially in keeping sink uniformity and achieving the expected final sink depth. A new construction control method is presented using ∞H theory, considering uncertainties in the mechanics model and external noise in the construction site parameters. The design method of an ∞H controller has consequently been obtained for large extra caissons. Control results using only constructor experiences are compared with simulation results using the ∞ H controller for a practical engineering situation, which indicates that the ∞H controller is successful in maintaining sink uniformity, avoiding sink as well as in achieving the expected final sink depth. 展开更多
关键词 large extra caissons construction process attitude control ∞H control
原文传递
Optimal Component Types for the Design of Construction Processes
5
作者 Felix Enge Wolfgang Huhnt 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期317-324,共8页
Within the project preparation phase, experienced professionals manually map design information onto process information with the aim to develop realistic and practical schedules. Unfortunately, the mapping itself is ... Within the project preparation phase, experienced professionals manually map design information onto process information with the aim to develop realistic and practical schedules. Unfortunately, the mapping itself is neither part of any underlying data model nor is it supported by current scheduling tools. As a consequence the process of setting up the data model for a schedule is still not supported formally. Huhnt and Enge described a modelling technique that addresses the missing linkage between design and process information[1]. The approach makes use of so called component types. These are template sub-processes that describe the fabrication procedure of typical building components. Decomposing the building into com-ponents and assigning a component type to each component allows for formal support while scheduling. Depending on the decomposition of the building into components and the complexity of the involved component types the specification effort differs. The question about optimal component types arises: Which layout of building components and component types results in minimal specification effort? This paper presents a branch and bound algorithm to determine optimal component types. For a given schedule, which has been modelled based on component types, all possible decompositions into sub-processes are determined. During the decomposition process the encountered configurations are compared. Those with minimal specifica-tion effort are registered. Theoretical and practical examples are examined and discussed. 展开更多
关键词 SCHEDULING process modelling planning processes construction processes branch and bound pattern matching search algorithm OPTIMIZATION
原文传递
Modification Management for Construction Processes
6
作者 Wolfgang Huhnt Sven Richter Felix Enge 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期185-191,共7页
This paper presents an approach to handle different types of subsequent modifications in construction processes. It is focused on a formalized approach with the objective that effects of subsequent modifications are d... This paper presents an approach to handle different types of subsequent modifications in construction processes. It is focused on a formalized approach with the objective that effects of subsequent modifications are detected automatically. The approach presented in this paper makes use of an existing modeling technique specifically focused on construction processes. The modeling techniques result in a process description where all technological interdependencies between construction activities are considered and where consistency between the sequence of activities and the history of components is guaran-teed. This modeling technique is expanded by an existing concept for handling versions and dependencies between objects. The integration of these different concepts makes it possible to track effects of relevant types of subsequent modifications in construction processes on a formalized basis. Effects of subsequent modifications are detected by algorithms, different versions can be compared by algorithms and different versions are stored so that subsequent modifications are documented. The innovation of the approach presented is the completeness. Effects of different relevant types of subsequent modifications in construction processes are tracked on a formalized basis. 展开更多
关键词 construction processes process modeling subsequent modifications
原文传递
Deformation behavior and acting earth pressure of three-hinge precast arch culvert in construction process
7
作者 Yasuo Sawamura Hiroyuki Ishihara +2 位作者 Yoshinori Otani Kiyoshi Kishida Makoto Kimura 《Underground Space》 SCIE EI 2019年第3期251-260,共10页
The three-hinge precast arch culvert consists of two segmental precast units and three hinge points.It harnesses the passive resistance of an embankment by permitting deflection,resulting in a mechanically stable stru... The three-hinge precast arch culvert consists of two segmental precast units and three hinge points.It harnesses the passive resistance of an embankment by permitting deflection,resulting in a mechanically stable structure.However,the design of the three-hinge precast arch culvert differs from that of a conventional culvert,prompting the mechanical behavior of the culvert to become an important issue.In this study,therefore,1/5 scale model tests were conducted on a three-hinge precast arch culvert to measure the changes in the inside width and earth pressure acting on the culvert at each step in order to investigate the culvert’s mechanical behavior at each construction stage.Moreover,the deflection measurement of the culvert was obtained at the in-situ construction site.The results indicate that the arch members were displaced according to the embankment depth in a similar manner to the design load.Therefore,the horizontal earth pressure,which was larger than the earth pressure at rest,acted on the culvert at the end of its construction. 展开更多
关键词 Precast arch culvert construction process Coefficient of earth pressure Inside width
原文传递
Probabilistic prediction of expected ground condition and construction time and costs in road tunnels 被引量:3
8
作者 A.Mahmoodzadeh S.Zare 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期734-745,共12页
Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic est... Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding. 展开更多
关键词 Markov process Geological condition Monte-Carlo (MC) simulation construction time and costs Hamro tunnel
下载PDF
On Lexical Processing in Teaching of College English Reading
9
作者 聂晓黎 《海外英语》 2012年第10X期137-138,共2页
As Constructivist theory is applied into lexical processing in teaching of college English reading, understanding word meaning should be seen as a reconstruction rather than a transmission of knowledge. Teachers shoul... As Constructivist theory is applied into lexical processing in teaching of college English reading, understanding word meaning should be seen as a reconstruction rather than a transmission of knowledge. Teachers should set up linguistic environment where students as sociate what they are learning with previous experience, and accomplish the construction of meaning in collaborative circumstance. 展开更多
关键词 constructionISM ENGLISH READING LEXICAL processING
下载PDF
政策执行过程研究:社会建构论的视角 被引量:10
10
作者 胡杰容 《北京工业大学学报(社会科学版)》 2007年第3期11-15,32,共6页
指出社会建构论为政策执行过程研究提供了一个全新的视角,认为社会建构论强调现实的社会建构性与行动者的主观能动性,主张行动与规则之间的构造关系;在政策执行过程研究中引入社会建构论,通过展现政策执行过程中政策行动者的创造性和能... 指出社会建构论为政策执行过程研究提供了一个全新的视角,认为社会建构论强调现实的社会建构性与行动者的主观能动性,主张行动与规则之间的构造关系;在政策执行过程研究中引入社会建构论,通过展现政策执行过程中政策行动者的创造性和能动性及其他们之间的多元互动关系,不仅有利于揭示现实的政策执行过程,而且有助于重新认识政策文本与政策行动、政策执行与制定的关系。 展开更多
关键词 社会建构论 政策 执行过程 政策执行者 目标群体
下载PDF
“谁都/也VP”的构式特征和构式化过程及机制
11
作者 陈振艳 《淮南师范学院学报》 2020年第2期65-70,共6页
“谁都/也VP”包括施受构式、受施构式和正反同辞构式三种类型,表达施受和受施两种意义,是多义构式。“谁都/也VP”是作为一个完整的形式语义匹配一步步演变而来的,经过了从甲式到乙式到丙式再到丁式的构式化过程,在构式化过程中起作用... “谁都/也VP”包括施受构式、受施构式和正反同辞构式三种类型,表达施受和受施两种意义,是多义构式。“谁都/也VP”是作为一个完整的形式语义匹配一步步演变而来的,经过了从甲式到乙式到丙式再到丁式的构式化过程,在构式化过程中起作用的机制是重新分析——类推——重新分析+类推,正反同辞构式兼有施受型构式和受施型构式的构式化形义匹配模式。 展开更多
关键词 谁都/也VP 构式特征 构式化过程 构式化机制 形义匹配模式
下载PDF
现代汉语“要不要”强调构式的构式化——基于一种全新理论框架
12
作者 雷四维 《山西农业大学学报(社会科学版)》 2015年第2期210-216,共7页
"要不要"强调构式是近来汉语使用中所产生的新兴结构,具有强调、表达说话者主观态度的功能,在结构和功能上都具有一定的特殊性。运用全新的构式化与构式演变理论对其形成过程及机制进行讨论,认为该构式的生成是大脑通过汉语... "要不要"强调构式是近来汉语使用中所产生的新兴结构,具有强调、表达说话者主观态度的功能,在结构和功能上都具有一定的特殊性。运用全新的构式化与构式演变理论对其形成过程及机制进行讨论,认为该构式的生成是大脑通过汉语已有构式类推的结果,并通过一系列构式演变逐渐产生。 展开更多
关键词 “要不要” 构式化 构式演变 形成机制 形成过程 类推
下载PDF
Chinalco Southeast Coast Aluminum Deep Processing Base Started Construction in Fuzhou
13
《China Nonferrous Metals Monthly》 2016年第12期7-,共1页
At the end of August,Chinalco Southeast Coast Aluminum Deep Processing Base broke ground at the Fujian-Taiwan(Fuzhou)Industrial Park for Blue Economy.Based on Chilco Ruimin(an aluminum processing subsidiary of Chinalc... At the end of August,Chinalco Southeast Coast Aluminum Deep Processing Base broke ground at the Fujian-Taiwan(Fuzhou)Industrial Park for Blue Economy.Based on Chilco Ruimin(an aluminum processing subsidiary of Chinalco in Fujian Province)as the main body,Chinalco 展开更多
关键词 BASE Chinalco Southeast Coast Aluminum Deep processing Base Started construction in Fuzhou BODY
原文传递
Process and cause of urban-rural development transformation in the Bohai Rim Region, China 被引量:22
14
作者 LIU Yansui HU Zhichao LI Yuheng 《Journal of Geographical Sciences》 SCIE CSCD 2014年第6期1147-1160,共14页
China's reform and opening-up policy has brought the country a great development opportunity. The high-speed growth of the economy not only led China to a period of industrialization, urbanization, informatization an... China's reform and opening-up policy has brought the country a great development opportunity. The high-speed growth of the economy not only led China to a period of industrialization, urbanization, informatization and agricultural modernization, but also exacerbated the situation of the urban–rural dual structure. Based on the review of current studies, we first used the analytic hierarchy process(AHP) method to evaluate the urban–rural development and transformation level by population transformation index, land transformation index, industrial transformation index and social transformation index between 1996 and 2012 around the Bohai Rim Region. Then, based on the results of each index, we used the exploratory spatial data analysis(ESDA) method to investigate the spatial autocorrelation of the change in the urban–rural development transformation index during the 16-year period using Global Moran's I index and Local Moran's I index. Finally, we investigated the mechanism of change of the urban–rural development transformation index at county level, summarizing five main factors:(1) the radiation from the surrounding big cities,(2) the acceleration of the urbanization process,(3) the upgrading of the industrial structure,(4) the publishing and implementation of a macro development strategy and regional policy, and(5) natural factors such as topology. 展开更多
关键词 urban–rural development transformation urbanization village-town construction Bohai Rim Region analytic hierarchy process ESDA
原文传递
Effect of concrete creep and shrinkage on tall hybrid structures and its countermeasures
15
作者 Pusheng SHEN Hui FANG Xinhong XIA 《Frontiers of Structural and Civil Engineering》 SCIE EI 2009年第2期234-239,共6页
This paper aims to study the different vertical displacements in tall hybrid-structures and the corresponding engineering measures.First,the method to calculate the different vertical displacements in tall hybrid-stru... This paper aims to study the different vertical displacements in tall hybrid-structures and the corresponding engineering measures.First,the method to calculate the different vertical displacements in tall hybrid-structures is presented.This method takes into account the effects of construction process by applying loads sequentially story by story.Based on the concrete creep and shrinkage calculation formula in American Concrete Institute(ACI)code,with the assumption that loads are increased linearly in members,the creep and shrinkage effects of members are analyzed by adopting two parameters named average load-aged-coefficient and average age-last coefficient.The effects of steel ratio on members creep are analyzed by age-adjusted module method(AEMM).The effects that core-tube were constructed in advance to outer steel frame were also considered.Then,based on the samplecalculation,the measures to effectively reduce the different vertical displacements in hybrid-structures are proposed.This method is simple and practical in the calculation of different vertical displacements in tall and super-tall hybrid-structures. 展开更多
关键词 CREEP SHRINKAGE construction process hybrid-structure
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部