Cluster synchronization is an important dynamical behavior in community networks and deserves further investigations.A community network with distributed time delays is investigated in this paper.For achieving cluster...Cluster synchronization is an important dynamical behavior in community networks and deserves further investigations.A community network with distributed time delays is investigated in this paper.For achieving cluster synchronization,an impulsive control scheme is introduced to design proper controllers and an adaptive strategy is adopted to make the impulsive controllers unified for different networks.Through taking advantage of the linear matrix inequality technique and constructing Lyapunov functions,some synchronization criteria with respect to the impulsive gains,instants,and system parameters without adaptive strategy are obtained and generalized to the adaptive case.Finally,numerical examples are presented to demonstrate the effectiveness of the theoretical results.展开更多
To study the influence of construction interfaces on dynamic characteristics of roller compacted concrete dams(RCCDs),mechanical properties of construction interfaces are firstly analyzed. Then, the viscous-spring art...To study the influence of construction interfaces on dynamic characteristics of roller compacted concrete dams(RCCDs),mechanical properties of construction interfaces are firstly analyzed. Then, the viscous-spring artificial boundary(VSAB) is adopted to simulate the radiation damping of their infinite foundations, and based on the Marc software, a simplified seismic motion input method is presented by the equivalent nodal loads. Finally, based on the practical engineering of a RCC gravity dam, effects of radiation damping and construction interfaces on the dynamic characteristics of dams are investigated in detail. Analysis results show that dynamic response of the RCC gravity dam significantly reduces about 25% when the radiation damping of infinite foundation is considered. Hot interfaces and the normal cold interfaces have little influence on the dynamic response of the RCC gravity dam.However, nonlinear fracture along the cold interfaces at the dam heel will occur under the designed earthquake if the cold interfaces are combined poorly. Therefore, to avoid the fractures along the construction interfaces under the potential super earthquakes,combination quality of the RCC layers should be significantly ensured.展开更多
Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined...Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.展开更多
1 Background As the basic principle of the world economy,environment,and social development,sustainable development is the focus of the international community today.In the Olympic Agenda 2020 published by the Interna...1 Background As the basic principle of the world economy,environment,and social development,sustainable development is the focus of the international community today.In the Olympic Agenda 2020 published by the International Olympic Committee(IOC),sustainable development was officially listed as one of the core concepts of the Olympic Games.Since the beginning of the bid,the concept of ctathlete-centered,sustainable and economical”was proposed,which was highly consistent with the idea of the Olympic Agenda 2020.To implement the concept of holding“green”Olympic Games and meet the sustainability requirements of the IOC,the Organizing Committee of Beijing Winter Olympic Games issued a series of documents related to the sustainability of sports venues such as Sustainability Policies for 2022 Beijing Winter Olympic Games and Winter Paralympic Games,and strived to realize the sustainable development of sports venues in the whole life cycle of planning and design stage,construction stage,operation stage,and post-game utilization.展开更多
基金Project supported by the National Natural Science Foundation of China(Grant No.61463022)the Natural Science Foundation of Jiangxi Province,China(Grant No.20161BAB201021)the Natural Science Foundation of Jiangxi Educational Committee,China(Grant No.GJJ14273)
文摘Cluster synchronization is an important dynamical behavior in community networks and deserves further investigations.A community network with distributed time delays is investigated in this paper.For achieving cluster synchronization,an impulsive control scheme is introduced to design proper controllers and an adaptive strategy is adopted to make the impulsive controllers unified for different networks.Through taking advantage of the linear matrix inequality technique and constructing Lyapunov functions,some synchronization criteria with respect to the impulsive gains,instants,and system parameters without adaptive strategy are obtained and generalized to the adaptive case.Finally,numerical examples are presented to demonstrate the effectiveness of the theoretical results.
基金Projects(20120094110005,20120094130003)supported by the Research Fund for the Doctoral Program of Higher Education of ChinaProjects(51379068,51139001,51279052,51209077,51179066)supported by the National Natural Science Foundation of China+1 种基金Project(NCET-11-0628)supported by the Program for New Century Excellent Talents in University,ChinaProjects(201201038,201101013)supported by the Public Welfare Industry Research Special Fund Project of Ministry of Water Resources of China
文摘To study the influence of construction interfaces on dynamic characteristics of roller compacted concrete dams(RCCDs),mechanical properties of construction interfaces are firstly analyzed. Then, the viscous-spring artificial boundary(VSAB) is adopted to simulate the radiation damping of their infinite foundations, and based on the Marc software, a simplified seismic motion input method is presented by the equivalent nodal loads. Finally, based on the practical engineering of a RCC gravity dam, effects of radiation damping and construction interfaces on the dynamic characteristics of dams are investigated in detail. Analysis results show that dynamic response of the RCC gravity dam significantly reduces about 25% when the radiation damping of infinite foundation is considered. Hot interfaces and the normal cold interfaces have little influence on the dynamic response of the RCC gravity dam.However, nonlinear fracture along the cold interfaces at the dam heel will occur under the designed earthquake if the cold interfaces are combined poorly. Therefore, to avoid the fractures along the construction interfaces under the potential super earthquakes,combination quality of the RCC layers should be significantly ensured.
文摘Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.
文摘1 Background As the basic principle of the world economy,environment,and social development,sustainable development is the focus of the international community today.In the Olympic Agenda 2020 published by the International Olympic Committee(IOC),sustainable development was officially listed as one of the core concepts of the Olympic Games.Since the beginning of the bid,the concept of ctathlete-centered,sustainable and economical”was proposed,which was highly consistent with the idea of the Olympic Agenda 2020.To implement the concept of holding“green”Olympic Games and meet the sustainability requirements of the IOC,the Organizing Committee of Beijing Winter Olympic Games issued a series of documents related to the sustainability of sports venues such as Sustainability Policies for 2022 Beijing Winter Olympic Games and Winter Paralympic Games,and strived to realize the sustainable development of sports venues in the whole life cycle of planning and design stage,construction stage,operation stage,and post-game utilization.