System Analysis & Incentive Model Design for Enterprise Contract Management
1
作者 LEI Ming(Department of Economy Mangaement,Beijing University,Beijing 100871)FENG Shan(Institute of Systems Engineering,Huazhong University of Science and Technology,Wuhan Hubei) 《Systems Science and Systems Engineering》 CSCD 1994年第1期16-25,共10页
With introducting two testing indices of ECMRS,behavior modal of the contract enterprise and the state in ECMRS are in our paper,then two connive models of ECMRS are made by introducing an audit technique as a means o... With introducting two testing indices of ECMRS,behavior modal of the contract enterprise and the state in ECMRS are in our paper,then two connive models of ECMRS are made by introducing an audit technique as a means of acquiring information Moreover,a general rule which determines optimal strategy with perfect informtion is also given. 展开更多
关键词 enterprise contract management responsibility system incentive strategy AUDIT
原文传递
Study on Transfer Problem of Contract and Management Right of Agricultural Land in Anhui Province 被引量:1
2
作者 Jingliang LIU Zhongxiang YU 《Asian Agricultural Research》 2017年第3期48-51,共4页
The status quo and significance of contract and management right transfer of rural land are analyzed,and major problems existed in contract and management right transfer of rural land in Anhui Province are studied,con... The status quo and significance of contract and management right transfer of rural land are analyzed,and major problems existed in contract and management right transfer of rural land in Anhui Province are studied,containing unsound transfer market,insufficient flow demand motion,single transfer form,non-standard register,right determination and certificate issuing. On this basis,several policies and suggestions are proposed,such as combining practical use with suitable use of land right determination and certificate issuing,establishing multilayer rural social security system and expanding land management range. 展开更多
关键词 Rural land contract and management right TRANSFER Anhui Province
下载PDF
Technical Management in Power Plant Constructionfor Export Contract
3
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co., Ltd.) 《Electricity》 1998年第3期30-33,共4页
Regarding the technical management during construction of Thailand PTA Co-generation, there are some problems due to the typical method in electric power construction in China, which show the differences between inter... Regarding the technical management during construction of Thailand PTA Co-generation, there are some problems due to the typical method in electric power construction in China, which show the differences between international methods and ours. In order to do the technical management in the project for export contract, it is necessary to do the work based on the Contract, to know the related laws and regulations, and national conditions, to coordinate the relationship among various parties well, and to carry out the management ahead of time. 展开更多
关键词 Technical management in Power Plant Constructionfor Export contract
下载PDF
Cost Control Strategies in the Pre-Construction Period of Highway Construction
4
作者 Chunbo Chen 《Journal of Architectural Research and Development》 2024年第3期104-109,共6页
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ... Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects. 展开更多
关键词 Highway construction Preliminary management Cost control contract management Investment estimate
下载PDF
高校学生“契约式”管理模式的构建 被引量:6
5
作者 杜维彦 冯开甫 +1 位作者 申秀清 王迎丰 《西华师范大学学报(哲学社会科学版)》 2008年第1期100-103,共4页
我国高等教育正在进入全面素质教育时代,在大学日常教育管理工作新的形势下,建立大学生"契约式"管理模式是十分必要和迫切的。契约化管理是实现大学生自律与他律相结合,建立健全法律法规和学校规章制度,确保学校和学生双方权... 我国高等教育正在进入全面素质教育时代,在大学日常教育管理工作新的形势下,建立大学生"契约式"管理模式是十分必要和迫切的。契约化管理是实现大学生自律与他律相结合,建立健全法律法规和学校规章制度,确保学校和学生双方权益的需要。构建大学生契约化管理模式对于保护学生和学校的合法权益,促进大学生的健康成长,确保学校的稳定,具有重要的现实意义。研究大学生"契约式"管理模式结构和其运行过程中应当注意的问题,有助于高校学生工作的有效开展。大学生"契约式"管理模式也不失为一种行之有效的创新管理途径。 展开更多
关键词 高校 大学生 “契约式”管理模式 构建
下载PDF
Assessment of Performance Based Road Maintenance Practices in Nepal
6
作者 Abhiman Das Mulmi 《Open Journal of Civil Engineering》 2016年第2期225-241,共17页
Roads are the major asset of any country and to conserve them maintenance is essential. The delay of maintenance works can lead the road in the stage of expensive rehabilitation and reconstruction. In Nepal, Departmen... Roads are the major asset of any country and to conserve them maintenance is essential. The delay of maintenance works can lead the road in the stage of expensive rehabilitation and reconstruction. In Nepal, Department of Roads (DoR) is responsible for maintenance of strategic roads of country. The maintenance practice of the road under Department of Road is predominantly based on Strengthen Maintenance Division Process where several maintenance activities like Routine maintenance, Recurrent Maintenance, Periodic Maintenance and Emergency Maintenance are planned and carried out. The maintenance work is based on traditional quantity and unit price based short term maintenance contracts, where maintenance of physical works is outsourced. Client demands the contractor what work is to be done, when to be do it and the extent of the work. The contractor is paid on the basis of a defined output or quantity accomplished, and the schedule of the rates. DoR engineers required full time supervision of work. Pilot based performance based maintenance practice of road started in Nepal in 2003. The study assesses performance road maintenance practices of road maintenance in Nepal on the basis of the framework of cost efficiency, level of service effectiveness and quality of service. The study concluded that implementation of Performance Based Maintenance Contract (PBMC) was not successful in Nepal as Road Asset condition was not maintained to performance standard. One of the reasons is the weak service delivery of contractor alongside weak contract enforcement from the road agency. 展开更多
关键词 Road Maintenance Performance Based Maintenance Cost Efficiency contract management
下载PDF
A Benefit Measurement Framework for an Online Contract Change Management System
7
作者 Tejas Oza 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期205-210,共6页
The contract change management (CCM) system is an online collaboration tool, which supports the contract change management process of new engineering contract (NEC) contract. It is currently used in practice on a wide... The contract change management (CCM) system is an online collaboration tool, which supports the contract change management process of new engineering contract (NEC) contract. It is currently used in practice on a wide range of civil, power, and building projects in the UK. The aim of this study is first to identify the tangible and intangible benefits of the system through a user survey; then to develop a framework to measure these benefits. A questionnaire survey is conducted, which reveals that CCM can help project teams improve process effectiveness, reduce risk of process failures, and increase the compliance with NEC requirements. Subsequently, a spreadsheet tool is developed to allow CCM users to calculate the tangible cost savings as a result of using the system. For intangible benefits, a change management maturity model (CM3) is developed, which provides a measurement framework for assessing the improvement of a project team’s capability in dealing with contract changes. 展开更多
关键词 contract change management IT benefit measurement capability maturity model benefit measurement framework new engineering contract (NEC) processes
原文传递
Excess Benefit Allocation in Shared Savings Based on Non-cooperative Game Theory
8
作者 Xiao Xu 《Proceedings of Business and Economic Studies》 2021年第4期36-42,共7页
Energy saving income distribution mode is of great significance to the energy industry.With the continuous application of new technologies,the problem of excess energy saving income distribution has become one of the ... Energy saving income distribution mode is of great significance to the energy industry.With the continuous application of new technologies,the problem of excess energy saving income distribution has become one of the obstacles to the appreciation of energy performance.At present,the distribution of risk and income is mainly based on the contribution of risk and income,which has some limitations.The benefit distribution of energy saving negotiation between energy saving service companies and clients can be regarded as a bargaining process where an effective range satisfying both parties can be obtained.This provides a new perspective in solving the problem of excess energy saving income distribution in energy management contract projects. 展开更多
关键词 contract energy management Excess energy saving Non-cooperative game theory Bargaining model
下载PDF
The outlook of blockchain technology for construction engineering management 被引量:22
9
作者 Jun WANG Peng WU +1 位作者 Xiangyu WANG Wenchi SHOU 《Frontiers of Engineering Management》 2017年第1期67-75,共9页
Current construction engineering management suffers numerous challenges in terms of the trust,information sharing, and process automation. Blockchain which is a decentralised transaction and data management technology... Current construction engineering management suffers numerous challenges in terms of the trust,information sharing, and process automation. Blockchain which is a decentralised transaction and data management technology, has attracted increasing interests from both academic and industrial aspects since 2008. However,most of the existing research and practices are focused on the blockchain itself(i.e. technical challenges and limitations) or its applications in the finance service sector(i.e.Bitcoin). This paper aims to investigate the potential of applying blockchain technology in the construction sector.Three types of blockchain-enabled applications are proposed to improve the current processes of contract management, supply chain management, and equipment leasing, respectively. Challenges of blockchain implementation are also discussed in this paper. 展开更多
关键词 Blockchain contract management supply chain management equipment leasing