This paper describes the results of cost-profit analysis related to interconnectors for Japan-Russia and JapanSouth Korea based on the Asia International Grid Connection Study Group 2^(nd) report. The Group has been e...This paper describes the results of cost-profit analysis related to interconnectors for Japan-Russia and JapanSouth Korea based on the Asia International Grid Connection Study Group 2^(nd) report. The Group has been established in 2016 for conducting research on international electric power networks in Asia from the viewpoint of technology, investment and legal framework. 2^(nd) report of the Group was published in June 2018, examining the profitability of an interconnectors between Japan and neighboring countries. The Group has calculated expected profit from operation of these interconnectors.The Group has categorized interconnector business into four models from the survey of preceding and current business on grids and interconnectors. To clarify profitability, expected internal rate of return(IRR) was calculated for each business model based on estimated investment cost for each route. When interconnector is dedicated to specific power plants or suppliers and electricity can be sold at Japan wholesale market at 2016-2017 price level, positive IRR levels are expected in case that Free on Board(FOB) price lower than 7 JPY/kWh. When the investment will be covered by electricity tariff by final consumers, tariff for consumers will just slightly increase by approximately 0.1 JPY/kWh.展开更多
Facility location allocation(FLA) is one of the important issues in the logistics and transportation fields. In practice, since customer demands, allocations, and even locations of customers and facilities are usually...Facility location allocation(FLA) is one of the important issues in the logistics and transportation fields. In practice, since customer demands, allocations, and even locations of customers and facilities are usually changing, the FLA problem features uncertainty. To account for this uncertainty, some researchers have addressed the fuzzy profit and cost issues of FLA. However, a decision-maker needs to reach a specific profit, minimizing the cost to target customers. To handle this issue it is essential to propose an effective fuzzy cost-profit tradeoff approach of FLA. Moreover, some regional constraints can greatly influence FLA. By taking a vehicle inspection station as a typical automotive service enterprise example, and combined with the credibility measure of fuzzy set theory, this work presents new fuzzy cost-profit tradeoff FLA models with regional constraints. A hybrid algorithm integrating fuzzy simulation and genetic algorithms(GA) is proposed to solve the proposed models. Some numerical examples are given to illustrate the proposed models and the effectiveness of the proposed algorithm.展开更多
文摘This paper describes the results of cost-profit analysis related to interconnectors for Japan-Russia and JapanSouth Korea based on the Asia International Grid Connection Study Group 2^(nd) report. The Group has been established in 2016 for conducting research on international electric power networks in Asia from the viewpoint of technology, investment and legal framework. 2^(nd) report of the Group was published in June 2018, examining the profitability of an interconnectors between Japan and neighboring countries. The Group has calculated expected profit from operation of these interconnectors.The Group has categorized interconnector business into four models from the survey of preceding and current business on grids and interconnectors. To clarify profitability, expected internal rate of return(IRR) was calculated for each business model based on estimated investment cost for each route. When interconnector is dedicated to specific power plants or suppliers and electricity can be sold at Japan wholesale market at 2016-2017 price level, positive IRR levels are expected in case that Free on Board(FOB) price lower than 7 JPY/kWh. When the investment will be covered by electricity tariff by final consumers, tariff for consumers will just slightly increase by approximately 0.1 JPY/kWh.
基金Project supported by the Fundamental Research Funds for the Central Universities(No.2572014BB08)the National Natural Science Foundation of China(Nos.51405075,61304182,71371141,and 71001080)
文摘Facility location allocation(FLA) is one of the important issues in the logistics and transportation fields. In practice, since customer demands, allocations, and even locations of customers and facilities are usually changing, the FLA problem features uncertainty. To account for this uncertainty, some researchers have addressed the fuzzy profit and cost issues of FLA. However, a decision-maker needs to reach a specific profit, minimizing the cost to target customers. To handle this issue it is essential to propose an effective fuzzy cost-profit tradeoff approach of FLA. Moreover, some regional constraints can greatly influence FLA. By taking a vehicle inspection station as a typical automotive service enterprise example, and combined with the credibility measure of fuzzy set theory, this work presents new fuzzy cost-profit tradeoff FLA models with regional constraints. A hybrid algorithm integrating fuzzy simulation and genetic algorithms(GA) is proposed to solve the proposed models. Some numerical examples are given to illustrate the proposed models and the effectiveness of the proposed algorithm.