Given the background of a transmission tower erected on a particular mining subsidence area,we used finite element modeling to analyze the anti-deformation performance of transmission towers under a number of differen...Given the background of a transmission tower erected on a particular mining subsidence area,we used finite element modeling to analyze the anti-deformation performance of transmission towers under a number of different load conditions,including horizontal foundation displacement,uneven vertical downward displacement,wind loads and icing conditions.The results show that the failure in stability of a single steel angle iron represents the limit of the tower given ground deformation.We calculated the corresponding limits of foundation displacements.The results indicate that compression displacement of the foundation is more dangerous than tension displacement.Under complex foundation displacement conditions,horizontal foundation displacement is a key factor leading to failure in the stability of towers.Under conditions of compression or tension displacement of the foundation,wind load becomes the key factor.Towers do not fail when foundation displacements are smaller than 1% (under tension) or 0.5% (under horizontal compression or single foundation subsidence) of the distance between two supports.展开更多
he influence of laser linewidth on optical fiber transmission systems has been investigated. The maximum transmission distances at different linewidths are first calculated in linear systems with various bit rates. Th...he influence of laser linewidth on optical fiber transmission systems has been investigated. The maximum transmission distances at different linewidths are first calculated in linear systems with various bit rates. Then it is found that SPM can significantly enhance the PMAM noise which severely deteriorates the performance of system with high optical power and large dispersion. In this case, the laser linewidth and optical power must be well controlled.展开更多
This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (H...This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.展开更多
The transmission-line-circuit model of the Z accelerator, developed originally by W. A. STYGAR, P. A. CORCORAN, et al., is revised. The revised model uses different calculations for the electron loss and flow impedanc...The transmission-line-circuit model of the Z accelerator, developed originally by W. A. STYGAR, P. A. CORCORAN, et al., is revised. The revised model uses different calculations for the electron loss and flow impedance in the magnetically insulated transmission line system of the Z accelerator before and after magnetic insulation is established. By including electron pressure and zero electric field at the cathode, a closed set of equations is obtained at each time step, and dynamic shunt resistance (used to represent any electron loss to the anode) and flow impedance are solved, which have been incorporated into the transmission line code for simulations of the vacuum section in the Z accelerator. Finally, the results are discussed in comparison with earlier findings to show the effectiveness and limitations of the model.展开更多
As an efficient and advanced line inspection method, helicopter line patrol is gradually more and more used in transmission lines inspection, promoting the elaborate operation of transmission lines and reducing the ma...As an efficient and advanced line inspection method, helicopter line patrol is gradually more and more used in transmission lines inspection, promoting the elaborate operation of transmission lines and reducing the management cost. However, as a 'floating-potential conductor' near to a high-voltage transmission line, the helicopter would be at a high electric field region;and bring security risk to equipment and operating personnel. In this paper, the electric field strength near the cabin at locations of different distance from transmission lines is investigated by calculation, and the field in the helicopter cabin is also calculated with finite element method (FEM). The result indicates that the potential difference becomes higher with the decrease of the distance between the helicopter and transmission line. Considering the discharge energy and the guarantee of the persons’ safety, the safety distance is determined as d≥15 m.展开更多
The variability of the output power of distributed renewable energy sources(DRESs)that originate from the fastchanging climatic conditions can negatively affect the grid stability.Therefore,grid operators have incorpo...The variability of the output power of distributed renewable energy sources(DRESs)that originate from the fastchanging climatic conditions can negatively affect the grid stability.Therefore,grid operators have incorporated ramp-rate limitations(RRLs)for the injected DRES power in the grid codes.As the DRES penetration levels increase,the mitigation of high-power ramps is no longer considered as a system support function but rather an ancillary service(AS).Energy storage systems(ESSs)coordinated by RR control algorithms are often applied to mitigate these power fluctuations.However,no unified definition of active power ramps,which is essential to treat the RRL as AS,currently exists.This paper assesses the various definitions for ramp-rate RR and proposes RRL method control for a central battery ESS(BESS)in distribution systems(DSs).The ultimate objective is to restrain high-power ramps at the distribution transformer level so that RRL can be traded as AS to the upstream transmission system(TS).The proposed control is based on the direct control of theΔP/Δt,which means that the control parameters are directly correlated with the RR requirements included in the grid codes.In addition,a novel method for restoring the state of charge(So C)within a specific range following a high ramp-up/down event is proposed.Finally,a parametric method for estimating the sizing of central BESSs(BESS sizing for short)is developed.The BESS sizing is determined by considering the RR requirements,the DRES units,and the load mix of the examined DS.The BESS sizing is directly related to the constant RR achieved using the proposed control.Finally,the proposed methodologies are validated through simulations in MATLAB/Simulink and laboratory tests in a commercially available BESS.展开更多
基金National Natural Science Foundation of China(No.50004008)Xuzhou Power Supply Company and the Fundamental Research Funds for the Central Universities(No.2011QNB18) for their financial and technical support for this work
文摘Given the background of a transmission tower erected on a particular mining subsidence area,we used finite element modeling to analyze the anti-deformation performance of transmission towers under a number of different load conditions,including horizontal foundation displacement,uneven vertical downward displacement,wind loads and icing conditions.The results show that the failure in stability of a single steel angle iron represents the limit of the tower given ground deformation.We calculated the corresponding limits of foundation displacements.The results indicate that compression displacement of the foundation is more dangerous than tension displacement.Under complex foundation displacement conditions,horizontal foundation displacement is a key factor leading to failure in the stability of towers.Under conditions of compression or tension displacement of the foundation,wind load becomes the key factor.Towers do not fail when foundation displacements are smaller than 1% (under tension) or 0.5% (under horizontal compression or single foundation subsidence) of the distance between two supports.
文摘he influence of laser linewidth on optical fiber transmission systems has been investigated. The maximum transmission distances at different linewidths are first calculated in linear systems with various bit rates. Then it is found that SPM can significantly enhance the PMAM noise which severely deteriorates the performance of system with high optical power and large dispersion. In this case, the laser linewidth and optical power must be well controlled.
文摘This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.
基金supported by National Natural Science Foundation of China (No. 50637010)
文摘The transmission-line-circuit model of the Z accelerator, developed originally by W. A. STYGAR, P. A. CORCORAN, et al., is revised. The revised model uses different calculations for the electron loss and flow impedance in the magnetically insulated transmission line system of the Z accelerator before and after magnetic insulation is established. By including electron pressure and zero electric field at the cathode, a closed set of equations is obtained at each time step, and dynamic shunt resistance (used to represent any electron loss to the anode) and flow impedance are solved, which have been incorporated into the transmission line code for simulations of the vacuum section in the Z accelerator. Finally, the results are discussed in comparison with earlier findings to show the effectiveness and limitations of the model.
文摘As an efficient and advanced line inspection method, helicopter line patrol is gradually more and more used in transmission lines inspection, promoting the elaborate operation of transmission lines and reducing the management cost. However, as a 'floating-potential conductor' near to a high-voltage transmission line, the helicopter would be at a high electric field region;and bring security risk to equipment and operating personnel. In this paper, the electric field strength near the cabin at locations of different distance from transmission lines is investigated by calculation, and the field in the helicopter cabin is also calculated with finite element method (FEM). The result indicates that the potential difference becomes higher with the decrease of the distance between the helicopter and transmission line. Considering the discharge energy and the guarantee of the persons’ safety, the safety distance is determined as d≥15 m.
基金part of and supported by the European UnionHorizon 2020 project“EASY-RES”with G.A.:764090。
文摘The variability of the output power of distributed renewable energy sources(DRESs)that originate from the fastchanging climatic conditions can negatively affect the grid stability.Therefore,grid operators have incorporated ramp-rate limitations(RRLs)for the injected DRES power in the grid codes.As the DRES penetration levels increase,the mitigation of high-power ramps is no longer considered as a system support function but rather an ancillary service(AS).Energy storage systems(ESSs)coordinated by RR control algorithms are often applied to mitigate these power fluctuations.However,no unified definition of active power ramps,which is essential to treat the RRL as AS,currently exists.This paper assesses the various definitions for ramp-rate RR and proposes RRL method control for a central battery ESS(BESS)in distribution systems(DSs).The ultimate objective is to restrain high-power ramps at the distribution transformer level so that RRL can be traded as AS to the upstream transmission system(TS).The proposed control is based on the direct control of theΔP/Δt,which means that the control parameters are directly correlated with the RR requirements included in the grid codes.In addition,a novel method for restoring the state of charge(So C)within a specific range following a high ramp-up/down event is proposed.Finally,a parametric method for estimating the sizing of central BESSs(BESS sizing for short)is developed.The BESS sizing is determined by considering the RR requirements,the DRES units,and the load mix of the examined DS.The BESS sizing is directly related to the constant RR achieved using the proposed control.Finally,the proposed methodologies are validated through simulations in MATLAB/Simulink and laboratory tests in a commercially available BESS.