Based on the construction project of the Changjiashan tunnel of the freeway,the variety rule of surrounding rock masses of the tunnel through the gob of coalmine wasstudied by using of finite element methed(FEM).The s...Based on the construction project of the Changjiashan tunnel of the freeway,the variety rule of surrounding rock masses of the tunnel through the gob of coalmine wasstudied by using of finite element methed(FEM).The status of the stress and strain,thevariety of the plastic area were simulated in the whole rock mass before and after thetunnel was excavated.The characters of stress and deformation of surrounding rockmasses were analyzed when the tunnel was built.It concluded from the numerical simula-tion that the influence on the tunneling is great when the tunnel passing through the gob ofcoalmine is excavated,and the relative measures should be taken.展开更多
Based on the movement regularity of surrounding rock with road-in packing of gob-side entry retaining in fully-mechanized sub-level caving face(RPGERFCF),the me- chanical model of its surrounding rock was established ...Based on the movement regularity of surrounding rock with road-in packing of gob-side entry retaining in fully-mechanized sub-level caving face(RPGERFCF),the me- chanical model of its surrounding rock was established and the calculating formulas of the deformation of the roof,coal wall and filling body were attained.By the mechanical analy- sis to the deformation of the surrounding rock of RPGERFCF,the major factors influencing the deformation of the surrounding rock were found out and the technologic approaches reduced the deformation and enhanced the stability of the surrounding rock were put for- ward.Consequently,the scientific bases were provided for the stability control of the sur- rounding rock of RPGERFCF.展开更多
The horizontal distance X between roadway and the edge of its upper pillar is considered as an important parameter for layout of roadway in floor strata or in the adjacent coal seam. Based on the research achievements...The horizontal distance X between roadway and the edge of its upper pillar is considered as an important parameter for layout of roadway in floor strata or in the adjacent coal seam. Based on the research achievements of rockstrata pressure, this paper illustrates the quantitative relationship among the mining situation of upper searn, the rockstrata properties around roadway, the vertital distanee Z (between roadway and its upper pillar), and the horizontai distance X (between roadway and the edge of its upper pillar), and provides a main basiS for the selection of value X and the relative location between roadway and its upper seam.展开更多
The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 k...The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 km.The longest tunnel(Yigong tunnel)is 42.4 km long.The successful construction of the Sichuan–Tibet railway depends largely on tunnel construction.Due to the complex conditions,tunnel construction for the Sichuan–Tibet railway poses great challenges to the research community.This paper aims to illustrate the necessity of interdisciplinary and joint research to solve problems associated with tunnel construction that will be encountered in the immediate future and facilitate the communication and exchange of ideas between disciplines.To this end,based on a systematic analysis of the available data related to Sichuan–Tibet railway tunnels,six major aspects of the geology,environment,and engineering conditions are identified.Next,based on the engineering responses from the Sichuan–Tibet railway tunnels,potential technical problems and risk characteristics are predicted and evaluated.Further,six key scientific issues are identified and discussed based on a coupled multi-layer analysis of essential tunnel engineering issues.Finally,research directions,technical ideas,and research methods that should be carried out for this project are proposed.展开更多
文摘Based on the construction project of the Changjiashan tunnel of the freeway,the variety rule of surrounding rock masses of the tunnel through the gob of coalmine wasstudied by using of finite element methed(FEM).The status of the stress and strain,thevariety of the plastic area were simulated in the whole rock mass before and after thetunnel was excavated.The characters of stress and deformation of surrounding rockmasses were analyzed when the tunnel was built.It concluded from the numerical simula-tion that the influence on the tunneling is great when the tunnel passing through the gob ofcoalmine is excavated,and the relative measures should be taken.
基金the National Science Foundation of China(50674046)National Science Important Foundation(50634050)Hunan Science Foundation(06JJ50092)
文摘Based on the movement regularity of surrounding rock with road-in packing of gob-side entry retaining in fully-mechanized sub-level caving face(RPGERFCF),the me- chanical model of its surrounding rock was established and the calculating formulas of the deformation of the roof,coal wall and filling body were attained.By the mechanical analy- sis to the deformation of the surrounding rock of RPGERFCF,the major factors influencing the deformation of the surrounding rock were found out and the technologic approaches reduced the deformation and enhanced the stability of the surrounding rock were put for- ward.Consequently,the scientific bases were provided for the stability control of the sur- rounding rock of RPGERFCF.
文摘The horizontal distance X between roadway and the edge of its upper pillar is considered as an important parameter for layout of roadway in floor strata or in the adjacent coal seam. Based on the research achievements of rockstrata pressure, this paper illustrates the quantitative relationship among the mining situation of upper searn, the rockstrata properties around roadway, the vertital distanee Z (between roadway and its upper pillar), and the horizontai distance X (between roadway and the edge of its upper pillar), and provides a main basiS for the selection of value X and the relative location between roadway and its upper seam.
基金the financial support by the National Natural Science of China(Grant No.51738002)the National Key R&D Program of China(Grant No.2017YFC0805401).
文摘The Sichuan–Tibet railway construction has received significant attention from both China and abroad.The new section from Ya’an to Nyingchi is about 1018.6 km long,including 69 tunnels with a total length of 841.7 km.The longest tunnel(Yigong tunnel)is 42.4 km long.The successful construction of the Sichuan–Tibet railway depends largely on tunnel construction.Due to the complex conditions,tunnel construction for the Sichuan–Tibet railway poses great challenges to the research community.This paper aims to illustrate the necessity of interdisciplinary and joint research to solve problems associated with tunnel construction that will be encountered in the immediate future and facilitate the communication and exchange of ideas between disciplines.To this end,based on a systematic analysis of the available data related to Sichuan–Tibet railway tunnels,six major aspects of the geology,environment,and engineering conditions are identified.Next,based on the engineering responses from the Sichuan–Tibet railway tunnels,potential technical problems and risk characteristics are predicted and evaluated.Further,six key scientific issues are identified and discussed based on a coupled multi-layer analysis of essential tunnel engineering issues.Finally,research directions,technical ideas,and research methods that should be carried out for this project are proposed.