期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Changes in the Supply of Public Intermediate Goods,Fixed Wage,and the Relative Price in the Harris-Todaro Model
1
作者 Boya Chi 《Proceedings of Business and Economic Studies》 2024年第4期254-262,共9页
Since the Harris-Todaro model was proposed in 1970,it has played a crucial role in analyzing various environmental and trade issues in developing countries.This paper analyzes the effects of the amount of public inter... Since the Harris-Todaro model was proposed in 1970,it has played a crucial role in analyzing various environmental and trade issues in developing countries.This paper analyzes the effects of the amount of public intermediate goods provided by the government,the increase in the fixed wage rate in the urban sector,and the changes in the relative international prices of agricultural and manufacturing goods on labor employment,unemployment,and the economic welfare in the context of a small open economy.It also proposes relevant policies to reduce the unemployment rate while improving national welfare. 展开更多
关键词 International trade Public intermediate good Economic welfare harris-todaro model
下载PDF
A Role-Based PMI Security Model for E-Government 被引量:2
2
作者 WULi-jun SUKai-le YANGZhi-hua 《Wuhan University Journal of Natural Sciences》 CAS 2005年第1期329-332,共4页
We introduce the general AC( atlribure certificate), the role specificationAC and the rolt assignment AC We discuss the rolt-based PMI(Privilege Management Infrastructure)architecture. The role-based PMT(Public-Kty In... We introduce the general AC( atlribure certificate), the role specificationAC and the rolt assignment AC We discuss the rolt-based PMI(Privilege Management Infrastructure)architecture. The role-based PMT(Public-Kty In-frastructure) secure model forE-govcrnment isresearehed by combining the role-bastd PMI with PKI architeclure (Public Key Infrastructure). Themodel has advantages of flexibility, convenience, less storage space and less network consumptionetc. We are going to ust iht secure modelin the E-govern-ment system. 展开更多
关键词 e-govemment public key certificate role-specification AC role-assignmentAC ihe security model for e- government
下载PDF
Modeling method and preliminary model of Asteroid Toutatis from Chang'E-2 optical images 被引量:1
3
作者 Xiang-Yu Li Dong Qiao 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2014年第3期310-315,共6页
Shape modeling is fundamental to the analysis of dynamic environment and motion around asteroid. Chang'E- 2 successfully made a flyby of Asteroid 4179 Toutatis and obtained plenty of high-resolution images during the... Shape modeling is fundamental to the analysis of dynamic environment and motion around asteroid. Chang'E- 2 successfully made a flyby of Asteroid 4179 Toutatis and obtained plenty of high-resolution images during the mis- sion. In this paper, the modeling method and preliminary model of Asteroid Toutatis are discussed. First, the optical images obtained by Chang'E-2 are analyzed. Terrain and silhouette features in images are described. Then, the modeling method based on previous radar model and preliminary information from optical images is proposed. A preliminary polyhedron model of Asteroid Toutatis is established. Finally, the spherical harmonic coefficients of Asteroid Toutatis based on the polyhedron model are obtained. Some parameters of model are analyzed and compared. Although the model proposed in this paper is only a preliminary model, this work offers a valuable reference for future high-resolution models. 展开更多
关键词 Chang'e-2 Asteroid Toutatis Shape modeling.Polyhedron method
下载PDF
Lunar topographic model CLTM-s01 from Chang’E-1 laser altimeter 被引量:22
4
作者 PING JinSong HUANG Qian +3 位作者 YAN JianGuo CAO JianFeng TANG GeShi SHU Rong 《Science China(Physics,Mechanics & Astronomy)》 SCIE EI CAS 2009年第7期1105-1114,共10页
More than 3 million range measurements from the Chang’E-1 Laser Altimeter have been used to produce a global topographic model of the Moon with improved accuracy. Our topographic model, a 360th degree and order spher... More than 3 million range measurements from the Chang’E-1 Laser Altimeter have been used to produce a global topographic model of the Moon with improved accuracy. Our topographic model, a 360th degree and order spherical harmonic expansion of the lunar radii, is designated as Chang’E-1 Lunar Topography Model s01 (CLTM-s01). This topographic field, referenced to a mean radius of 1738 km, has an absolute vertical accuracy of approximately 31 m and a spatial resolution of 0.25° (~7.5 km). This new lunar topographic model has greatly improved previous models in spatial coverage, accuracy and spatial resolution, and also shows the polar regions with the altimeter results for the first time. From CLTM-s01, the mean, equatorial, and polar radii of the Moon are 1737103, 1737646, and 1735843 m, respectively. In the lunar-fixed coordinate system, this model shows a COM/COF offset to be (?1.777, ?0.730, 0.237) km along the x, y, and z directions, respectively. All the basic lunar shape parameters derived from CLTM-s01 are in agreement with the results of Clementine GLTM2, but CLTM-s01 offers higher accuracy and reliability due to its better global samplings. 展开更多
关键词 Chang’e-1 LASER ALTIMETER (LAM) LUNAR topographic model
原文传递
Lunar digital elevation model and elevation distribution model based on Chang’E-1 LAM data 被引量:4
5
作者 CAI ZhanChuan1,2,ZHENG CaiMu1,2,TANG ZeSheng1,2,3 & QI DongXu1,2,4 1 Faculty of Information Technology,Macao University of Science and Technology,Macao,China 2 Collaborative Research Laboratory on Lunar and Planetary Exploration,Macao University of Science and Technology,Macao,China +1 位作者 3 School of Information Science and Technology,Tsinghua University,Beijing 100084,China 4 School of Information Science and Technology,Sun Yat-sen University,Guangzhou 510275,China 《Science China(Technological Sciences)》 SCIE EI CAS 2010年第9期2558-2568,共11页
More than 8.2 million effective data samples were obtained by the Chang’E-1 Laser Altimeter (LAM).In order to produce a global topographic model of the moon with improved accuracy,a hierarchical many-knot spline meth... More than 8.2 million effective data samples were obtained by the Chang’E-1 Laser Altimeter (LAM).In order to produce a global topographic model of the moon with improved accuracy,a hierarchical many-knot spline method was proposed in this paper.This algorithm makes use of a hierarchy of control lattices to approximate or interpolate the LAM data.Based on the proposed algorithm,a 0.0625°×0.0625° grid of global lunar DEM was obtained and it was compared with ULCN2005,CLTMs01 and Kaguya models,respectively.At the same time,this paper explored the elevation distribution law and established the elevation distribution model.It is shown that the global lunar and nearside elevation distribution is positively skewed and leptokurtic normal distribution,and the farside elevation distribution is a positively skewed and platykurtic normal distribution. 展开更多
关键词 Chang’e-1 LAM DEM DISTRIBUTION model
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部