期刊文献+
共找到307篇文章
< 1 2 16 >
每页显示 20 50 100
Scheduling problems on tardiness penalty and earliness award with simply linear processing time 被引量:2
1
作者 余英 卢圳 +2 位作者 孙世杰 何龙敏 胡晶地 《Journal of Shanghai University(English Edition)》 CAS 2009年第2期123-128,共6页
In this paper, a single-machine scheduling model with a given common due date and simple linear processing times was considered. The objective is the total weighted tardiness penalty and earliness award. Some polynomi... In this paper, a single-machine scheduling model with a given common due date and simple linear processing times was considered. The objective is the total weighted tardiness penalty and earliness award. Some polynomial time solvable cases for this problem are given. A dynamic programming algorithm was provided and a branch and bound algorithm for general case of the problem was provided based on a rapid method for estimating the lower bound. 展开更多
关键词 SCHEDULING single machine tardiness earliness
下载PDF
A dynamic programming algorithm for scheduling problems on earliness award and tardiness penalty with time-dependent processing time 被引量:1
2
作者 余英 孙世杰 何龙敏 《Journal of Shanghai University(English Edition)》 CAS 2008年第3期204-209,共6页
In this paper, a single-machine scheduling model with a given common due date is considered. Job processing time is a linear decreasing function of its starting time. The objective function is to minimize the total we... In this paper, a single-machine scheduling model with a given common due date is considered. Job processing time is a linear decreasing function of its starting time. The objective function is to minimize the total weighted earliness award and tardiness penalty. Our aim is to find an optimal schedule so as to minimize the objective function. As the problem is NP-hard, some properties and polynomial time solvable cases of this problem are given. A dynamic programming algorithm for the general case of the problem is provided. 展开更多
关键词 scheduling SINGLE-MACHINE linear decreasing processing time earliness tardiness
下载PDF
考虑时间紧迫度的应急救援车辆路径问题建模与优化
3
作者 陈光会 徐英赫 +1 位作者 李森森 彭志鹏 《物流技术》 2024年第8期151-160,共10页
考虑时间紧迫度的应急救援车辆路径优化,具有重要的理论价值与实际意义。以总费用(早到惩罚费用+延时惩罚费用-时间窗内送达奖励费用)最小为目标构建模型,并针对车辆在时间窗内送达以及早到、晚到的三种不同情形,定义时间紧迫度,设计精... 考虑时间紧迫度的应急救援车辆路径优化,具有重要的理论价值与实际意义。以总费用(早到惩罚费用+延时惩罚费用-时间窗内送达奖励费用)最小为目标构建模型,并针对车辆在时间窗内送达以及早到、晚到的三种不同情形,定义时间紧迫度,设计精确算法A求解,证明了算法A的时间复杂度为O(ln^(3)),其中l、n分别为配送车辆和受灾点的个数,以决策应急救援车辆的行驶路径。最后以上海嘉定区疫情防控应急物资配送为例,对模型和算法的有效性进行了证明,可为政府部门应急救援路径选择提供有效理论依据。 展开更多
关键词 时间紧迫度 早到惩罚费用 延时惩罚费用 车辆路径优化 精确算法
下载PDF
地震烈度仪对卷积神经网络模型地震预警震级估计的影响
4
作者 朱景宝 宋晋东 李山有 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2024年第6期81-90,共10页
为探索地震烈度仪对卷积神经网络模型地震预警震级估计的影响,以2022年中国发生的5次破坏性地震(M_S≥5.8)为例,将地震数据应用到卷积神经网络震级估计模型中,分析引入烈度仪地震数据后的震级估计。结果表明:在P波到达后3 s,烈度仪和强... 为探索地震烈度仪对卷积神经网络模型地震预警震级估计的影响,以2022年中国发生的5次破坏性地震(M_S≥5.8)为例,将地震数据应用到卷积神经网络震级估计模型中,分析引入烈度仪地震数据后的震级估计。结果表明:在P波到达后3 s,烈度仪和强震仪的单台震级估计误差主要分布在±1震级单位范围内;对于震中距100 km以内的数据,在P波到达后10 s内,与强震仪相比,烈度仪震级估计误差均值更接近0;对于信噪比小于20的数据,强震仪震级估计误差均值比烈度仪的震级估计误差均值更接近0,且烈度仪有更大震级估计误差的不确定度。此外,对于这5次地震,与强震仪相比,烈度仪的数量更多、分布更密,引入烈度仪地震数据后,卷积神经网络模型更快地获得鲁棒的震级估计。研究结果为地震烈度仪在卷积神经网络震级估计模型中的适用性提供了依据,也为地震预警系统震级估计提供参考。 展开更多
关键词 地震预警 卷积神经网络 震级估计 地震烈度仪 破坏性地震
下载PDF
基于灰数描述的不确定工时作业车间E/T调度优化
5
作者 陈开院 熊禾根 《组合机床与自动化加工技术》 北大核心 2024年第4期187-192,共6页
针对不确定加工时间的作业车间调度问题,考虑每个工件的交货期窗口,旨在最小化工件提前/拖期成本和机器空闲成本。分别采用基本遗传算法和混合遗传算法进行求解,并比较两种算法的求解质量。通过灰色理论和模糊数理论对不确定加工时间分... 针对不确定加工时间的作业车间调度问题,考虑每个工件的交货期窗口,旨在最小化工件提前/拖期成本和机器空闲成本。分别采用基本遗传算法和混合遗传算法进行求解,并比较两种算法的求解质量。通过灰色理论和模糊数理论对不确定加工时间分别建立调度模型,分析两种模型的优化程度和稳定性。结果表明,与基本遗传算法相比,引入按指定邻域结构进行局部搜索的混合遗传算法具有更好收敛能力;与模糊数方式相比,采用灰色理论能够更好地描述不确定加工时间,且在求解过程中也具有更好的适应性和稳定性。 展开更多
关键词 不确定加工时间 交货期窗口 提前/拖期 灰色理论 混合遗传算法 局部搜索
下载PDF
中国XRT智能预选抛废技术应用研究与实践
6
作者 罗主平 刘建华 +5 位作者 孙业长 杨婷 杨璐 阳建国 张文国 周承丞 《金属矿山》 CAS 北大核心 2024年第8期79-92,共14页
我国矿石资源普遍禀赋差,选矿成本高,但选矿工艺技术及设备研发水平较高。为了推动近年取得重大突破的高效大块预选设备———XRT智能选矿机更好地服务矿山,提升矿山的生产力水平和经济效益,建设绿色生态矿山,在简要介绍了XRT智能选矿... 我国矿石资源普遍禀赋差,选矿成本高,但选矿工艺技术及设备研发水平较高。为了推动近年取得重大突破的高效大块预选设备———XRT智能选矿机更好地服务矿山,提升矿山的生产力水平和经济效益,建设绿色生态矿山,在简要介绍了XRT智能选矿机系统组成与分选原理、工艺技术的适用性及要求、工艺技术与设备的特点和优越性基础上,按矿种分类介绍了代表性矿山开展XRT智能预选抛废研究与生产实践的情况。试验研究与生产实践表明:XRT智能选矿机对矿种具有广泛的适应性,且具有分选客观、科学、精准、智能、节能、环保等特点;可以兼顾两种及以上目标矿物或元素的高效综合回收;应用工艺简单,对现场碎矿流程的冲击、干扰小;入选粒度粗,高度契合能抛早抛、能收早收理念;对薄、小、边、残、贫矿石资源的开发具有显著的扩能、降本、提质意义。并就XRT智能选矿机的研发和工艺技术应用给出了7点建议:解决分选粒度向上下拓展与分选效率、可靠性、稳定性和工艺的适应性问题,以实现多抛多收的目标;解决设备的大型化、系列化问题,以降低投资和生产成本,并方便现场配置和生产管理;研发三产品XRT智能选矿机,为后续制定高效的选矿工艺和产品方案创造条件;制定全面、科学的矿废判定标准,以实现资源效益的最大化;支持并携手矿石选择性破碎技术共同发展,为预选创造更好的条件;科学制定包容其他预选抛废技术的高效抛废工艺,使抛废更彻底、工艺流程更简洁顺畅、技术经济指标更好;论证废石洗矿工艺替代筛分洗矿工艺或给矿洗矿工艺的科学性,以使全系统工艺流程更简单、生产环境更整洁、投资和生产成本更低。最后指出,除磁铁矿石外,其他铁矿石及非金属矿石的粗粒预选抛废,应用不断进步的XRT智能预选抛废技术应是大势所趋。 展开更多
关键词 XRT 智能选矿机 废石混入率 早抛多抛 早收多收 综合利用 降本增效提质 绿色矿山
下载PDF
论网络服务商版权内容过滤义务:羁绊与出路 被引量:2
7
作者 张靖辰 《科技与法律(中英文)》 CSSCI 2024年第1期81-90,共10页
网络服务商信息控制能力提升及技术向善伦理观念发展,导致传统安全港规则正当性受到影响。这为版权内容过滤义务构建提供契机。应用版权内容过滤技术虽在基本权利保障与过滤成本方面存在局限,却并非不可化解。为优先保障高利益位序权利... 网络服务商信息控制能力提升及技术向善伦理观念发展,导致传统安全港规则正当性受到影响。这为版权内容过滤义务构建提供契机。应用版权内容过滤技术虽在基本权利保障与过滤成本方面存在局限,却并非不可化解。为优先保障高利益位序权利,并限制网络服务商恣意过滤,理应法定过滤标准。结合过滤行为的行政执法属性,引入证明标准理论进行义务建构,相较于比例原则与经验法则具有明显优势。对具体过滤标准,可以“接近案件事实清楚,证据确实充分”作为推定侵权、以不满足“优势证据”标准作为推定不侵权的技术过滤标准;而对两者间的“可能侵权内容”则构建预警通知制度。过滤成本问题则可通过限定义务主体范围、降低合格技术标准及作品集体管理予以分解。由此,发挥过滤技术功能以实现版权内容过滤义务的价值追求具有可行性。 展开更多
关键词 版权内容过滤 过滤标准 证明标准 预警通知 过滤成本
下载PDF
Discharging patients home from the intensive care unit:A new trend
8
作者 Esraa M Hassan Abbas B Jama +4 位作者 Ahmed Sharaf Asim Shaikh Mohamad El Labban Salim Surani Syed A Khan 《World Journal of Clinical Cases》 SCIE 2024年第23期5313-5319,共7页
Discharging patients directly to home from the intensive care unit(ICU)is becoming a new trend.This review examines the feasibility,benefits,challenges,and considerations of directly discharging ICU patients.By analyz... Discharging patients directly to home from the intensive care unit(ICU)is becoming a new trend.This review examines the feasibility,benefits,challenges,and considerations of directly discharging ICU patients.By analyzing available evidence and healthcare professionals'experiences,the review explores the potential impacts on patient outcomes and healthcare systems.The practice of direct discharge from the ICU presents both opportunities and complexities.While it can potentially reduce costs,enhance patient comfort,and mitigate complications linked to extended hospitalization,it necessitates meticulous patient selection and robust post-discharge support mechanisms.Implementing this strategy successfully mandates the availability of home-based care services and a careful assessment of the patient's readiness for the transition.Through critical evaluation of existing literature,this review underscores the significance of tailored patient selection criteria and comprehensive post-discharge support systems to ensure patient safety and optimal recovery.The insights provided contribute evidence-based recommendations for refining the direct discharge approach,fostering improved patient outcomes,heightened satisfaction,and streamlined healthcare processes.Ultimately,the review seeks to balance patientcentered care and effective resource utilization within ICU discharge strategies. 展开更多
关键词 Intensive care unit Critical care Early discharge cost effective critical care Patient comfort Early recovery
下载PDF
公路建设前期的造价控制研究 被引量:1
9
作者 史丽娇 《工程建设与设计》 2024年第2期249-251,共3页
为了提升公路造价控制水平,论文分析了公路工程造价的特点和影响因素,分别从投资决策阶段和设计阶段探讨公路建设前期的造价控制,提出了加大工可研究深度、提高投资估算编制水平、价值工程法、限额设计法等造价控制措施,并以某高速公路... 为了提升公路造价控制水平,论文分析了公路工程造价的特点和影响因素,分别从投资决策阶段和设计阶段探讨公路建设前期的造价控制,提出了加大工可研究深度、提高投资估算编制水平、价值工程法、限额设计法等造价控制措施,并以某高速公路项目为研究对象,阐述了价值工程法在控制造价中的具体应用。 展开更多
关键词 公路 建设前期 影响因素 造价控制
下载PDF
基于正交局部保持映射和成本优化的多变量时间序列早期分类模型
10
作者 袁子璇 翁小清 戈宁振 《计算机应用》 CSCD 北大核心 2024年第6期1832-1841,共10页
时间序列早期分类(ETSC)有两个矛盾的目标:早期性和准确率。分类早期性的实现,总是以牺牲它的准确率为代价。现有基于优化的多变量时间序列(MTS)早期分类方法,虽然在成本函数中考虑了错误分类成本和延迟决策成本,却忽视了MTS数据集样本... 时间序列早期分类(ETSC)有两个矛盾的目标:早期性和准确率。分类早期性的实现,总是以牺牲它的准确率为代价。现有基于优化的多变量时间序列(MTS)早期分类方法,虽然在成本函数中考虑了错误分类成本和延迟决策成本,却忽视了MTS数据集样本之间的局部结构对分类性能的影响。针对这个问题,提出一种基于正交局部保持映射(OLPP)和成本优化的MTS早期分类模型(OLPPMOAE)。首先,使用OLPP将MTS样本前缀映射到低维空间,保持原数据集的局部结构;其次,在低维空间训练一组高斯过程(GP)分类器,生成训练集每个时刻的类概率;最后,使用粒子群优化(PSO)算法从这些类概率中学习停止规则中的最优参数。在6个MTS数据集上的实验结果表明,在早期性基本持平的情况下,OLPPMOAE的准确率显著高于基于成本的R1_C_(lr)(stopping Rule and Cost function with regularization term l_(1)and l_(2))模型,平均准确率能够提升11.33%~15.35%,调和均值(HM)能够提升4.71%~9.01%。因此,所提模型能够以较高的准确率尽早地分类MTS。 展开更多
关键词 多变量时间序列 早期分类 正交局部保持映射 成本优化 高斯过程分类器
下载PDF
Early versus delayed necrosectomy in pancreatic necrosis:A population-based cohort study on readmission,healthcare utilization,and in-hospital mortality
11
作者 Hassam Ali Faisal Inayat +12 位作者 Vinay Jahagirdar Fouad Jaber Arslan Afzal Pratik Patel Hamza Tahir Muhammad Sajeel Anwar Attiq Ur Rehman Muhammad Sarfraz Ahtshamullah Chaudhry Gul Nawaz Dushyant Singh Dahiya Amir H Sohail Muhammad Aziz 《World Journal of Methodology》 2024年第3期55-67,共13页
BACKGROUND Acute necrotizing pancreatitis is a severe and life-threatening condition.It poses a considerable challenge for clinicians due to its complex nature and the high risk of complications.Several minimally inva... BACKGROUND Acute necrotizing pancreatitis is a severe and life-threatening condition.It poses a considerable challenge for clinicians due to its complex nature and the high risk of complications.Several minimally invasive and open necrosectomy procedures have been developed.Despite advancements in treatment modalities,the optimal timing to perform necrosectomy lacks consensus.AIM To evaluate the impact of necrosectomy timing on patients with pancreatic necrosis in the United States.METHODS A national retrospective cohort study was conducted using the 2016-2019 Nationwide Readmissions Database.Patients with non-elective admissions for pancreatic necrosis were identified.The participants were divided into two groups based on the necrosectomy timing:The early group received intervention within 48 hours,whereas the delayed group underwent the procedure after 48 hours.The various intervention techniques included endoscopic,percutaneous,or surgical necrosectomy.The major outcomes of interest were 30-day readmission rates,healthcare utilization,and inpatient mortality.RESULTS A total of 1309 patients with pancreatic necrosis were included.After propensity score matching,349 cases treated with early necrosectomy were matched to 375 controls who received delayed intervention.The early cohort had a 30-day readmission rate of 8.6% compared to 4.8%in the delayed cohort(P=0.040).Early necrosectomy had lower rates of mechanical ventilation(2.9%vs 10.9%,P<0.001),septic shock(8%vs 19.5%,P<0.001),and in-hospital mortality(1.1%vs 4.3%,P=0.01).Patients in the early intervention group incurred lower healthcare costs,with median total charges of $52202 compared to$147418 in the delayed group.Participants in the early cohort also had a relatively shorter median length of stay(6 vs 16 days,P<0.001).The timing of necrosectomy did not significantly influence the risk of 30-day readmission,with a hazard ratio of 0.56(95%confidence interval:0.31-1.02,P=0.06).CONCLUSION Our findings show that early necrosectomy is associated with better clinical outcomes and lower healthcare costs.Delayed intervention does not significantly alter the risk of 30-day readmission. 展开更多
关键词 Acute necrotizing pancreatitis Pancreatic necrosis Early necrosectomy Delayed necrosectomy Readmission Healthcare costs MORTALITY
下载PDF
建筑工程全过程造价管理与控制措施分析 被引量:2
12
作者 王琼 《工程技术研究》 2024年第5期144-146,共3页
文章围绕全过程造价管理进行研究,分析了全过程造价管理的管理阶段划分标准和组织协调要求。从前期决策、工程设计、招投标、现场施工四个环节入手,阐述了全过程造价管理模式在建筑工程中的应用路径,并提出多项行之有效的控制措施,旨在... 文章围绕全过程造价管理进行研究,分析了全过程造价管理的管理阶段划分标准和组织协调要求。从前期决策、工程设计、招投标、现场施工四个环节入手,阐述了全过程造价管理模式在建筑工程中的应用路径,并提出多项行之有效的控制措施,旨在增强造价控制效果,将全过程造价管理与控制措施全面落到实处。 展开更多
关键词 建筑工程 全过程造价管理 前期决策 工程设计 招投标 现场施工
下载PDF
基于第三方B2B平台的供应链金融风险预警系统设计
13
作者 周静 高志琨 +1 位作者 马彦 刘硕 《自动化技术与应用》 2024年第8期136-139,共4页
由于现阶段预警系统未考虑供应链金融风险产生的原因,导致系统的虚警率和运行成本增加。为此提出一种基于第三方B2B平台的供应链金融风险预警系统。对系统初设的指标体系进行问卷信效度分析,组建研究对象的操作风险指标体系,分析风险发... 由于现阶段预警系统未考虑供应链金融风险产生的原因,导致系统的虚警率和运行成本增加。为此提出一种基于第三方B2B平台的供应链金融风险预警系统。对系统初设的指标体系进行问卷信效度分析,组建研究对象的操作风险指标体系,分析风险发生的可能性以及后果,以达到第三方B2B平台下供应链金融风险预警的目的。仿真实验结果表明,供应链金融风险预警系统能够有效降低系统的虚警率,同时节省运行成本。 展开更多
关键词 系统设计 第三方B2B平台 供应链金融 风险预警系统 运行成本
下载PDF
Scatter Search Based Particle Swarm Optimization Algorithm for Earliness/Tardiness Flowshop Scheduling with Uncertainty 被引量:2
14
作者 Jia-Can Geng Zhe Cui Xing-Sheng Gu 《International Journal of Automation and computing》 EI CSCD 2016年第3期285-295,共11页
Considering the imprecise nature of the data in real-world problems, the earliness/tardiness (E/T) fiowshop scheduling problem with uncertain processing time and distinct due windows is concerned in this paper. A fu... Considering the imprecise nature of the data in real-world problems, the earliness/tardiness (E/T) fiowshop scheduling problem with uncertain processing time and distinct due windows is concerned in this paper. A fuzzy scheduling model is established and then transformed into a deterministic one by employing the method of maximizing the membership function of middle value. Moreover, an effective scatter search based particle swarm optimization (SSPSO) algorithm is proposed to minimize the sum of total earliness and tardiness penalties. The proposed SSPSO algorithm incorporates the scatter search (SS) algorithm into the frame of particle swarm optimization (PSO) algorithm and gives full play to their characteristics of fast convergence and high diversity. Besides, a differential evolution (DE) scheme is used to generate solutions in the SS. In addition, the dynamic update strategy and critical conditions are adopted to improve the performance of SSPSO. The simulation results indicate the superiority of SSPSO in terms of effectiveness and efficiency. 展开更多
关键词 earliness/tardiness (E/T) SCHEDULING fuzzy modeling scatter search (SS) particle swarm optimization (PSO).
原文传递
Simulated Annealing for Earliness/Tardiness Production Planning Model 被引量:1
15
作者 LI Ying\|juan\+1,\ WANG Ding\|wei\+2 1. Department of Industry and Business Administration, Shenyang University Shenyang 110013,China 2. Department of Systems Engineering, College of Information Science and Engineering,Northeastern University,Shenyan 《Systems Science and Systems Engineering》 CSCD 2000年第1期93-98,共6页
To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constrai... To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constraints, the model is difficult to be solved by traditional methods. In this paper, simulated annealing method combined with a heuristic is developed. Numerical results shows that the present approach is very efficient. Theoretically, the developed method is an attempt to solve a continuous domain problem by using simulated annealing. 展开更多
关键词 earliness/tardiness schedule semi\|infinite programming HEURISTIC simulated annealing
原文传递
Landslide Monitoring Using Low Cost GNSS Equipment - Experiences from Two Alpine Testing Sites 被引量:2
16
作者 Otto Heunecke Jessica Glabsch Stefan Schuhback 《Journal of Civil Engineering and Architecture》 2011年第8期661-669,共9页
Simple GNSS navigation receivers, developed for the mass market, can be used for positioning with sub centimeter accuracy in a wireless sensor network if the read-out of the carrier phase data is possible and all data... Simple GNSS navigation receivers, developed for the mass market, can be used for positioning with sub centimeter accuracy in a wireless sensor network if the read-out of the carrier phase data is possible and all data is permanently broadcast to a central computer for near real time processing of the respective base lines. Experiences gained in two research projects related to landslide monitoring are depicted in terms of quality and reliability of the results by the developed approach. As far as possible a modular system set up with commercial off-the-shelf components, e.g., standard WLAN fur commtmication, solar batteries with solar panels for autarkic power supply and in cooperation of existing proofed program tools is chosen. The challenge of the still ongoing development is to have a flexible and robust GNSS based sensor network available - concerned not only for landslide monitoring in future. 展开更多
关键词 Early warning systems geo sensor networks low cost precise differential GNSS near real time processing.
下载PDF
2017-2019年广东省农村适龄妇女宫颈癌和乳腺癌筛查结果和成本效果分析 被引量:7
17
作者 缪华章 吴云涛 朱颖贤 《实用医学杂志》 CAS 北大核心 2023年第13期1709-1713,共5页
目的深入分析2017-2019年广东省农村妇女宫颈癌和乳腺癌(简称两癌)筛查情况和成本效果,为卫生健康行政部门制定下一阶段方案提供科学依据。方法利用广东省两癌检查项目的个案和季报表进行分析,分析两癌检出率、早期诊断率、发现早期病... 目的深入分析2017-2019年广东省农村妇女宫颈癌和乳腺癌(简称两癌)筛查情况和成本效果,为卫生健康行政部门制定下一阶段方案提供科学依据。方法利用广东省两癌检查项目的个案和季报表进行分析,分析两癌检出率、早期诊断率、发现早期病例平均费用和早期发现成本系数。结果2017-2019年广东省为130余万名农村妇女提供两癌免费检查,平均年龄(48.04±7.94)岁。宫颈癌检出率56.50/10万,宫颈癌早期诊断率94.15%,发现早期病例的平均费用为29598元,早期发现成本系数EDCI为0.71,非常具有成本效果价值。乳腺癌检出率40.91/10万,乳腺癌早期诊断率60.16%,发现早期病例的平均费用为304200元,早期发现成本系数EDCI为7.31,成本效果价值合算。结论2017-2019年广东省农村妇女两癌筛查项目取得较好的效果,具有成本效果价值,值得卫生健康、财政和妇联等行政部门继续延续开展广东省适龄妇女两癌筛查项目,进一步扩大筛查覆盖范围和推广到城乡人群。 展开更多
关键词 农村妇女 宫颈癌 乳腺癌 筛查 早期发现成本系数
下载PDF
考虑交货期的双资源柔性作业车间节能调度 被引量:4
18
作者 张洪亮 徐静茹 +1 位作者 谈波 徐公杰 《系统仿真学报》 CAS CSCD 北大核心 2023年第4期734-746,共13页
为解决含有机器和工人双资源约束的柔性作业车间节能调度问题,在考虑交货期的基础上,建立了以总提前和拖期惩罚值及总能耗最小为目标的双资源柔性作业车间节能调度模型。提出了一种改进的非支配排序遗传算法(improved non-dominated sor... 为解决含有机器和工人双资源约束的柔性作业车间节能调度问题,在考虑交货期的基础上,建立了以总提前和拖期惩罚值及总能耗最小为目标的双资源柔性作业车间节能调度模型。提出了一种改进的非支配排序遗传算法(improved non-dominated sorting genetic algorithmⅡ,INSGA-Ⅱ)进行求解。针对所优化的目标,设计了一种三阶段解码方法以获得高质量的可行解;利用动态自适应交叉和变异算子以获得更多优良个体;改进拥挤距离以获得收敛性和分布性更优的种群。将INSGA-Ⅱ与多种多目标优化算法进行对比分析,实验结果表明所提算法可行且有效。 展开更多
关键词 双资源约束 柔性作业车间 提前/拖期惩罚 能耗 INSGA-Ⅱ(improved non-dominated sorting genetic algorithmⅡ)
下载PDF
基于多维分配的多普勒盲区目标点迹航迹关联方法
19
作者 韩伟 王国师 +1 位作者 晏凯 宋亚伟 《系统工程与电子技术》 EI CSCD 北大核心 2023年第10期3091-3097,共7页
机载预警雷达固有的多普勒盲区(Doppler blind zone,DBZ)会造成目标航迹的中断,而多目标杂波环境使航迹中断更为严重。在引入多普勒盲区信息的二维分配算法基础上,提出了一种基于多维分配算法的多目标点迹航迹关联方法。该方法充分利用... 机载预警雷达固有的多普勒盲区(Doppler blind zone,DBZ)会造成目标航迹的中断,而多目标杂波环境使航迹中断更为严重。在引入多普勒盲区信息的二维分配算法基础上,提出了一种基于多维分配算法的多目标点迹航迹关联方法。该方法充分利用目标航迹演变信息,对雷达的连续多帧量测数据进行滑窗处理,构建出多维分配的代价函数,最后求得最小代价条件下函数的解,该解即为目标点迹航迹的分配结果。仿真结果表明,在多目标杂波环境且存在多普勒盲区的条件下,该方法的航迹中断率较二维分配算法有了进一步的降低。 展开更多
关键词 机载预警雷达 多普勒盲区 点迹航迹关联 多维分配 代价函数 航迹中断率
下载PDF
早期心房颤动筛查的成本效果分析研究进展 被引量:5
20
作者 汤志杰 孙国珍 +4 位作者 王洁 刘沈馨雨 鲍志鹏 杨刚 王琳 《中国全科医学》 CAS 北大核心 2023年第1期104-112,117,共10页
心房颤动(简称房颤)是临床上较为常见的心律失常之一,无症状房颤发作隐匿,居民知晓率低,易导致不良结局,带来沉重负担,疾病筛查应先行于并发症的预防,无症状房颤的筛查和科学管理至关重要。当前国内外房颤筛查的焦点问题包括最适筛查人... 心房颤动(简称房颤)是临床上较为常见的心律失常之一,无症状房颤发作隐匿,居民知晓率低,易导致不良结局,带来沉重负担,疾病筛查应先行于并发症的预防,无症状房颤的筛查和科学管理至关重要。当前国内外房颤筛查的焦点问题包括最适筛查人群的探讨、筛查设备与方式的优选、筛查参与度的提升、确诊者抗凝治疗的规范及最佳经济性筛查方案的评估。本研究纳入25篇房颤筛查相关文献,系统梳理近5年患者管理指南中的房颤筛查部分,综合专家意见,从常规筛查的筛查策略、筛查设备、筛查参与度、抗凝参与度及卒中后筛查的监测时长、监测方式方面,分析目前房颤筛查的研究进展,并从卫生经济学的角度,剖析房颤筛查的策略对成本效果的影响,明晰筛查和抗凝治疗参与率的经济性作用,以期指导临床实践。目前国际上房颤筛查与管理的公认指南为《欧洲心律学会指南》及《北美心律学会指南》,房颤筛查成本效果的相关研究多采用马尔可夫(Markov)模型进行终生模拟,卫生经济学评价指标包括卒中事件、出血事件、质量调整寿命年(QALY)、增量成本效果比(ICER)等。多数指南/共识建议选取65~75岁的高风险人群应用便携单导联心电仪等新型设备进行常规筛查,以利于连续监测,提升房颤检出率;对于卒中后筛查,国内外指南均强调在隐源性短暂性脑缺血发作(TIA)/卒中患者中进行房颤筛查,筛查手段主要聚焦到长程心电图和植入式心电记录设备(ICM)上。综上,虽然目前对房颤筛查成本效果的认识已经取得一定进展,但仍存在许多分歧有待弥合,同时我国相关研究不充分,对房颤筛查的卫生经济学研究更为欠缺,未来需要基于国内的环境,构建更加准确、具体的筛查模型,通过大量实践完善我国的房颤管理指南,为提升居民寿命和生活质量、减轻医疗经济负担提供循证依据。 展开更多
关键词 心房颤动 疾病早期检查 诊断筛查项目 全科医学 成本效果分析
下载PDF
上一页 1 2 16 下一页 到第
使用帮助 返回顶部