Application of Earned Value Method in Project Cost Management and Schedule Management
1
作者 Wenjing Xu 《Proceedings of Business and Economic Studies》 2021年第4期146-152,共7页
At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role... At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability. 展开更多
关键词 earned value method Engineering project Cost management
下载PDF
Complete fuzzy scheduling and fuzzy earned value management in construction projects 被引量:9
2
作者 José Luís PONZ-TIENDA Eugenio PELLICER Víctor YEPES 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2012年第1期56-68,共13页
This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we... This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project. 展开更多
关键词 CONSTRUCTION earned value method(EVM) Fuzzy logic Fuzzy set Project management SCHEDULING