期刊文献+
共找到20篇文章
< 1 >
每页显示 20 50 100
Application of Anti-seepage Technology in the Construction of Hydraulic Engineering Projects
1
作者 Huanlin YANG 《Meteorological and Environmental Research》 CAS 2023年第5期31-32,35,共3页
With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construc... With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construction quality of hydraulic engineering.In this paper,the significance and problems of the application of anti-seepage technology in the construction of hydraulic engineering projects were mainly analyzed,and specific application strategies were proposed. 展开更多
关键词 Anti-seepage technology Hydraulic engineering projects Application strategy
下载PDF
Comparing the bullwhip effect under different inventory policies in engineering project supply chains 被引量:1
2
作者 张守健 薛小龙 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2010年第6期761-765,共5页
Measuring bullwhip effect is useful for making better controls on production planning and enhancing the supply chain operating efficiency.First,this article establishes the comparative analysis model of bullwhip effec... Measuring bullwhip effect is useful for making better controls on production planning and enhancing the supply chain operating efficiency.First,this article establishes the comparative analysis model of bullwhip effect between(s,S)and Periodic Review(PR)inventory policy based on the quantitative bullwhip effect model under different inventories.Then,the impacts of lead time,inventory review time,autocorrelation coefficient,and the number of samples on the gap of bullwhip effect under(s,S)and PR IP are analyzed.The results show that bullwhip effect in PR is more intense than(s,S)inventory policy.Contractors should pay more attention to control bullwhip effect when adopting PR inventory policy to enhance the total operating efficiency of the engineering project supply chains. 展开更多
关键词 engineering project project efficiency supply chain bullwhip effect inventory policy
下载PDF
Research on Risk Evaluation Method for International Engineering Projects 被引量:1
3
作者 HUANG Yi LI Sui-ke 《International Journal of Plant Engineering and Management》 2013年第3期140-145,共6页
Risk evaluation is one of the important elements of international engineering project management. The risk factors of international engineering projects are systematically analyzed from multiple dimension features of ... Risk evaluation is one of the important elements of international engineering project management. The risk factors of international engineering projects are systematically analyzed from multiple dimension features of the projects. The muhilayer evaluation index system for the international engineering project risk assessment is proposed and constructed, which consists of 8 I-grade indexes and 24 II-grade indexes as policy risk, market risk, resource risk, and technical scheme risk, schedule risk, funding risk, personnel risk and management risk. And then the self-evaluation and benchmarking evaluation methods are applied to evaluate the international engineering project risk, and established the corresponding mathematical models. Finally, a project evaluation example is given to illustrate the applicability and effectiveness of the mathematical models. 展开更多
关键词 international engineering project risk analysis risk evaluation risk management
下载PDF
A Mathematical Model Based on Supply Chain Optimization for International Petrochemical Engineering Projects
4
作者 Gao Ning Sun Wei 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2015年第2期91-100,共10页
Based on the study of supply chain(SC) and SC optimization in engineering projects, a mixed integer nonlinear programming(MINLP) optimization model is developed to minimize the total SC cost for international petroche... Based on the study of supply chain(SC) and SC optimization in engineering projects, a mixed integer nonlinear programming(MINLP) optimization model is developed to minimize the total SC cost for international petrochemical engineering projects. A steam cracking project is selected and analyzed, from which typical SC characteristics in international engineering projects in the area of petrochemical industry are summarized. The MINLP model is therefore developed and applied to projects with detailed data. The optimization results are analyzed and compared by the MINLP model, indicating that they are appropriate to SC management practice in engineering projects, and are consistent with the optimal priceeffective strategy in procurement. As a result, the model could provide useful guidance to SC optimization of international engineering projects in petrochemical industry, and improve SC management by selecting more reliable and qualified partner enterprises in SC for the project. 展开更多
关键词 supply chain OPTIMIZATION MODEL engineering project MINLP
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
5
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
6
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation Installation engineering engineering projects Safety management
下载PDF
The Development and Comparative Analysis of Engineering Project Management Modes 被引量:1
7
作者 Ji-wei Zhu Li-nan Zhou +1 位作者 Ming-yuan Yu Zhao Zhai 《Frontiers of Engineering Management》 2015年第4期351-358,共8页
Engineering project management is the whole process of project construction management activities up to the point of achieving the goals of engineering construction, which adopts the means of planning, organizing,lead... Engineering project management is the whole process of project construction management activities up to the point of achieving the goals of engineering construction, which adopts the means of planning, organizing,leading, and controlling. In addition, engineering project management modes are the works of project management and the technical guarantee of project success. For the quality and efficient transformation demands of the Chinese construction industry in the process of marketization, internationalization and informatization, based on the connotation and development path of engineering project management modes, the 16 main and new kinds of project management modes both domestically and abroad are divided into trading mode, financing mode and management mode. These have led to comparative analysis and brief commentary. Finally, it will be pointed out that the engineering project management modes move throughout the whole management process, the combined model and the expansion development of financing model. This work will provide reference for project participants to choose the appropriate project management modes and better understand building company transformation. 展开更多
关键词 engineering projects management mode comparative analysis development trend
原文传递
Engineering Projects Real-Time Supervision Mechanism Based on Grid Management
8
作者 乌云娜 董鹤云 +1 位作者 张昊渤 张金颖 《Journal of Shanghai Jiaotong university(Science)》 EI 2014年第4期502-507,共6页
This paper proposes an innovative supervision method that can provide project supervisors with realtime supervision of engineering projects and contractor activity. To obtain real-time and comprehensive state of proje... This paper proposes an innovative supervision method that can provide project supervisors with realtime supervision of engineering projects and contractor activity. To obtain real-time and comprehensive state of project, we use grid management to divide the project supervision grid in three levels: stage, objective, and milestone. Then, a detailed supervision mechanism is designed to help supervisors measure the project situation in real time. This mechanism checks that if the project objectives(such as schedule, cost, quality, and safety) in every supervision grid cell are under the healthy limits, any project deviation can be identified as soon as possible.A schedule objective is selected as an example to illustrate the method used to calculate the healthy limit. 展开更多
关键词 real-time supervision grid management healthy limit engineering project management
原文传递
Process-oriented knowledge-sharing platform for chemical engineering design projects
9
作者 Zhang, Lingling Zhang, Yuejin +2 位作者 Li, Jun Zhen, Miao Zheng, Xiuyu 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期136-141,共6页
A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in mult... A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in multi-projects of chemical engineering design are analyzed. Then based on theories of project management, process management, and knowledge management, a process-oriented knowledge-sharing platform is proposed. The platform has three characteristics: knowledge is divided into professional knowledge and project management knowledge; knowledge sharing is integrated with the project process, which makes knowledge sharing a necessary part of the project process and ensures the quantity of knowledge shared; the platform provides quantitative measurements of incentive mechanisms for knowledge providers and users which ensures the quality of knowledge shared. This knowledge-sharing platform uses two knowledge management tools, a knowledge map and a knowledge base, to support the platform. 展开更多
关键词 chemical engineering design project knowledge sharing process-oriented PLATFORM
下载PDF
Project Systems Engineering for Developing Space Robots
10
作者 Li Gengtian, Li ZhibinBeijing Institute of Control Engineering, P.O.Box 2729, Beijing 100080, ChinaLü YingxiangBeijing Institute of Electromechanic System Engineering.P.O.Box 142-206, Beijing 100854, China 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 1991年第1期97-106,共10页
Space robots possess unique distinguishing features unlike general robots on earth, due to the particular environments in space. The developing of various practical space robots promoting the improvement of space scie... Space robots possess unique distinguishing features unlike general robots on earth, due to the particular environments in space. The developing of various practical space robots promoting the improvement of space science and technology is a complex man-machine-environment engineering problem. This paper analyses from the systems engineering viewpoint the space robot system in the scope of the architecture of robotics discipline, space environment characteristics, man-machine-environment system of space robots, the general methodology of project systems engineering and the process of space robot systems engineering. 展开更多
关键词 Space robots Systems engineering project systems engineering.
下载PDF
Prospect and Retrospect of ECEPDI's Participation in Engineering Activities of Nuclear Power Projects
11
《Electricity》 1997年第4期7-10,共4页
关键词 Prospect and Retrospect of ECEPDI’s Participation in engineering Activities of Nuclear Power projects
下载PDF
Water Environmental Impact Assessment and Analysis of Foshan Brewery Project
12
作者 Jianqiao QIN Jierong CHEN +7 位作者 Donghang JIANG Tianxian TANG Xiangxuan WU Huiling WANG Yingli JIE Zemin ZHENG Haojia XU Xiaoxiao LIAO 《Meteorological and Environmental Research》 CAS 2023年第2期66-71,77,共7页
In recent years, the beer industry is a biological food industry that consumes a lot of water, and it has developed rapidly in China. The sewage discharged from the mass production of beer poses a huge threat to the e... In recent years, the beer industry is a biological food industry that consumes a lot of water, and it has developed rapidly in China. The sewage discharged from the mass production of beer poses a huge threat to the environment. In order to evaluate and better solve the possible environmental impacts of beer treatment engineering projects, a brewery project in Foshan City is taken as an example to investigate the water pollution generation links of the engineering process including surface water and groundwater. According to the relevant technical methods and standards, water pollution factors are screened, and concentration and discharge are monitored. Through comprehensive analysis, predictive evaluation is obtained. It is confirmed that the project meets the requirements of national laws and regulations and environmental protection standards. 展开更多
关键词 Brewery project engineering Water environment evaluation and analysis Improved A 2/O process
下载PDF
Application of Earned Value Method in Project Cost Management and Schedule Management
13
作者 Wenjing Xu 《Proceedings of Business and Economic Studies》 2021年第4期146-152,共7页
At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role... At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability. 展开更多
关键词 Earned value method engineering project Cost management
下载PDF
The Evaluation of Risk-Based Resource Allocation Alternatives Based on Fuzzy Information Axiom
14
作者 Jie Yu Yuliang Wang 《Journal of World Architecture》 2023年第6期70-75,共6页
This paper presents an analysis of the challenges in risk-based resource allocation in engineering projects.Sub-sequently,an alternative resource allocation evaluation method based on language information and informat... This paper presents an analysis of the challenges in risk-based resource allocation in engineering projects.Sub-sequently,an alternative resource allocation evaluation method based on language information and information axioms is proposed.Firstly,the evaluation team uses language information to give the evaluation information of the alternatives of risk resource allocation and provides the corresponding expected information for each resource.Secondly,according to the transformation formula of language information and fuzzy numbers,the above information is transformed into the evaluation information and expected information of the alternatives of risk-based resource allocation.Thirdly,according to the transformation formula of language information and fuzzy numbers,the above information is transformed into evalu-ation information and expectation information of alternative risk resource allocation.Finally,according to the information amount of each risk resource and the corresponding weight,the comprehensive information amount of the expected risk-based resource allocation alternatives is determined. 展开更多
关键词 engineering project Risk assessment Language information Fuzzy information axiom
下载PDF
Variations in tidal currents and suspended sediment concentration of the upper part of the North Channel of Changjiang Estuary over the past 10 years 被引量:1
15
作者 刘高伟 程和琴 +3 位作者 计娜 乔远英 胡浩 王冬梅 《Marine Science Bulletin》 CAS 2015年第2期9-24,共16页
The tidal current duration (TCD) and velocity (TCV) and suspended sediment concentration (SSC) were measured in the dry season in December, 2011 and in the flood season in June, 2012 at the upper part of the Nor... The tidal current duration (TCD) and velocity (TCV) and suspended sediment concentration (SSC) were measured in the dry season in December, 2011 and in the flood season in June, 2012 at the upper part of the North Channel of Changjiang Estuary. They were assimilated with the measured data in 2003, 2004, 2006 and 2007, using the tidal range's proportion conversion. Variations in TCD and TCV, preferential flow and SSC have been calculated. Influences of typical engineering projects such as Qingcaosha fresh water reservoir, Yangtze River Bridge, and land reclamation on the ebb and flood TCD, TCV and SSC in the North Channel for the last 10 years are discussed. The results show that: (1) currently, in the upper part of North Channel, the ebb tide dominates; after the construction of the typical projects, ebb TCD and TCV tends to be larger and the vertical average ebb and flood SSC decrease during the flood season while SSC increases during the dry season; (2) changes in the vertical average TCV are mainly contributed by seasonal runoff variation during the flood season, which is larger in the flood season than that in the dry season; the controlling parameters of increasing ebb TCD and TCV are those large-scale engineering projects in the North Channel; variation in SSC may result mainly from the reduction of basin annual sediment loads, large-scale nearshore projects and so on. 展开更多
关键词 changes in tidal currents and suspended sediment concentration preferential flow data assimilation large-scale engineering projects Changjiang Estuary
下载PDF
Study on Ways to Improve Economic Benefits by Strengthening Cost Management
16
作者 Zhu Hongchang 《China's Foreign Trade》 2011年第7期68-70,共3页
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T... Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget. 展开更多
关键词 cost management engineering project management cost control risk control ways tocontrol
下载PDF
Early filiform needle acupuncture for poststroke depression: a meta-analysis of 17 randomized controlled clinical trials 被引量:12
17
作者 Jiping Zhang Jing Chen +4 位作者 Junqi Chen Xiaohui Li Xueyan Lai Shaoqun Zhang Shengxu Wang 《Neural Regeneration Research》 SCIE CAS CSCD 2014年第7期773-784,共12页
OBJECTIVE: To evaluate the effectiveness and safety of filiform needle acupuncture for poststroke depression, and to compare acupuncture with the therapeutic efficacy of antidepressant drugs. DATA RETRIEVAL: We retr... OBJECTIVE: To evaluate the effectiveness and safety of filiform needle acupuncture for poststroke depression, and to compare acupuncture with the therapeutic efficacy of antidepressant drugs. DATA RETRIEVAL: We retrieved data from the Chinese National Knowledge Infrastructure (1979-2012), Wanfang (1980-2012), VIP (1989-2012), Chinese Biomedical Literature (1975- 2012), PubMed (1966-2012), Ovid Lww (-2012), and Cochrane Library (-2012) Database using the internet. SELECTION CRITERIA: Randomized controlled trials on filiform needle acupuncture versus antidepressant drugs for treatment of poststroke depression were included. Moreover, the in- cluded articles scored at least 4 points on the Jadad scale. Exclusion criteria: other acupuncture therapies as treatment group, not stroke-induced depression patients, score 〈 4 points, non-ran- domized controlled trials, or animal trials. MAIN OUTCOME MEASURES: These were the Hamilton Depression Scale scores, clinical ef- fective rate, Self-Rating Depression Scale scores, Side Effect Rating Scale scores, and incidence of adverse reaction and events. RESULTS: A total of 17 randomized controlled clinical trials were included. Meta-analysis results displayed that after 4 weeks of treatment, clinical effective rate was better in patients treated with fill- form needle acupuncture than those treated with simple antidepressant drugs [relative risk = 1.11, 95% confidence interval (C/): 1.03-1.21, P = 0.01]. At 6 weeks, clinical effective rate was similar between filiform needle acupuncture and antidepressant drug groups. At 2 weeks after filiform needle acupuncture, Hamilton Depression Scale (17 items) scores were lower than in the antide- pressant drug group (mean difference = -2.34, 95%CI: -3.46 to -1.22, P 〈 0.000,1). At 4 weeks, Hamilton Depression Scale (24 items) scores were similar between filiform needle acupuncture and antidepressant drug groups. Self-Rating Depression Scale scores were lower in filiform needle acupuncture group than in the antidepressant drug group. Side Effect Rating Scale was used in only two articles, and no meta-analysis was conducted. Safety evaluation of the 17 arti- cles showed that gastrointestinal tract reactions such as nausea and vomiting were very common in the antidepressant drug group. Incidence of adverse reaction and events was very low in the filiform needle acupuncture group. CONCLUSION: Early filiform needle acupuncture for poststroke depression can perfectly con- trol depression. Filiform needle acupuncture is safe and reliable. Therapeutic effects of filiform needle acupuncture were better than those of antidepressant drugs. 展开更多
关键词 nerve regeneration poststroke depression filiform needle acupuncture antidepressantdrugs randomized controlled trials clinical effective rate SAFETY META-ANALYSIS the GuangdongProvincial "211 engineering Stage-III Key Disciplines Construction project neural regeneration
下载PDF
Microscale tissue-engineered models:overcoming barriers to adoption for neural regeneration research 被引量:1
18
作者 Michael J.Moore 《Neural Regeneration Research》 SCIE CAS CSCD 2016年第3期386-387,共2页
The last decade has seen a steady proliferation in the use of tissue-engineered cell culture systems(Deforest and Anseth,2012),and these have been put to good use for studying neural axon growth and guidance(Li and... The last decade has seen a steady proliferation in the use of tissue-engineered cell culture systems(Deforest and Anseth,2012),and these have been put to good use for studying neural axon growth and guidance(Li and Hoffman-Kim,2008;Roy et al.,2013).These systems have been designed to more closely mimic the natural microenvironment of the developing or repairing nervous system and to enable spatiotemporal control over certain aspects of the microenvironment. 展开更多
关键词 engineered regeneration adoption barriers mimic enable guidance projection friendly overcome
下载PDF
eHealth Management Platform for Screening and Prediction of Down’s Syndrome in the Republic of Panama
19
作者 Juan Saldana Miguel Vargas-Lombardo 《E-Health Telecommunication Systems and Networks》 2014年第3期33-42,共10页
Through engineering projects, we have integrated software engineering, geographical information systems and HL7 standard to propose a model of an eHealth management platform for Down’s syndrome screening, replicable ... Through engineering projects, we have integrated software engineering, geographical information systems and HL7 standard to propose a model of an eHealth management platform for Down’s syndrome screening, replicable in all the country. It will use real time sample information acquired from the local population and will geographically reference this information in the territory of Panama for future research. 展开更多
关键词 project engineering Software engineering GIS EHEALTH Management Platform HL7 Trisomy 21 SAMPLE SCREENING Detection
下载PDF
Managing Coordination Complexity in the Remanufacturing of Aircraft Engines
20
作者 Qing Yang Lu Zheng 《Frontiers of Engineering Management》 2016年第2期158-164,共7页
The complexity of communication and coordination stemming from teams responsible for adjusting interdependent parameters of components is a fundamental feature in the aircraft engine remanufacturing engineering projec... The complexity of communication and coordination stemming from teams responsible for adjusting interdependent parameters of components is a fundamental feature in the aircraft engine remanufacturing engineering project. To manage coordination complexity, the features of the remanufacturing process of aircraft engine are analyzed and a systematic method is presented to measure and optimize the dependency between coupled components.Furthermore, quantitative models are built based on Design Structure Matrix(DSM) models to measure dependency strengths related to the parameter features of the components. Also, a two-stage DSM clustering criteria is used to reduce the complexity of an organization. An industrial example is provided to illustrate the proposed models. The results showed that the proposed approach can reduce total coordination complexity. 展开更多
关键词 remanufacturing engineering project aircraft engine coordination complexity organization optimization design structure matrix(DSM)
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部