The Zipingpu Concrete Faced Rockfill Dam (CFRD) was subjected to significant local damage in the "5.12" Wenchuan earthquake. It is the first rockfill dam of more than one hundred meters high to encounter a strong ...The Zipingpu Concrete Faced Rockfill Dam (CFRD) was subjected to significant local damage in the "5.12" Wenchuan earthquake. It is the first rockfill dam of more than one hundred meters high to encounter a strong earthquake anywhere in the world. Based on the finite element smoothing method, the residual strains at a typical cross-section and a downstream slope of the dam were obtained by processing the dam monitored displacement data. The position of and reason for the dam settlement and deformation ofrockfill dilatancy in the earthquake were analyzed according to the section residual strain. The results show that the maximum settlement ratio on the dam body approximately occurs at 2/3 of the dam height; dilatancy occurs from the dam crest to 25-30 m in the upstream and downstream slope; the immediate cause of the face slabs horizontal construction joint dislocation is excessive residual shear strain. Meanwhile, the position of and reason for the dam fissure in the earthquake were analyzed according to the dam slope residual strain.展开更多
基金National Natural Science Foundation of China under Grant No. 50979014, 51179024China Higher School Specialized Research Funds for Doctors under Grant No. 20090041110016
文摘The Zipingpu Concrete Faced Rockfill Dam (CFRD) was subjected to significant local damage in the "5.12" Wenchuan earthquake. It is the first rockfill dam of more than one hundred meters high to encounter a strong earthquake anywhere in the world. Based on the finite element smoothing method, the residual strains at a typical cross-section and a downstream slope of the dam were obtained by processing the dam monitored displacement data. The position of and reason for the dam settlement and deformation ofrockfill dilatancy in the earthquake were analyzed according to the section residual strain. The results show that the maximum settlement ratio on the dam body approximately occurs at 2/3 of the dam height; dilatancy occurs from the dam crest to 25-30 m in the upstream and downstream slope; the immediate cause of the face slabs horizontal construction joint dislocation is excessive residual shear strain. Meanwhile, the position of and reason for the dam fissure in the earthquake were analyzed according to the dam slope residual strain.