Application of FTA based on SDG-HAZOP for production of polypropylene 被引量:1
1
作者 ZHAO Shi-ping CHEN Zheng-cai +1 位作者 XUAN Ai-guo HUANG Ting-ze 《中国安全生产科学技术》 CAS CSCD 2013年第8期152-155,共4页
The SDG-HAZOP(Signed Directed Graph,Hazard and Operability Analysis) is a qualitative safety assessment method,which is comprehensive,systematic and complete.However the result is tedious and large.Fault tree analysis... The SDG-HAZOP(Signed Directed Graph,Hazard and Operability Analysis) is a qualitative safety assessment method,which is comprehensive,systematic and complete.However the result is tedious and large.Fault tree analysis(FTA) is a logical and diagrammatic method,which is proved to be a useful quantitative analysis tool to evaluate the safety and reliability of complex systems.So a FTA based on SDG-HAZOP quantitative method was proposed in this paper.Firstly,the SDG-HAZOP and the FTA were established on the background of polypropylene production devices in the Sinopec Wuhan Branch.Secondly,the probability of top event was calculated by reliable data from the probability of basic events.Finally,the targeted measures were proposed to prevent fatal potential dangerous situations by probability calculation. 展开更多
关键词 SDG-HAZOP fault tree analysis(fta) POLYPROPYLENE PROBABILITY top event
下载PDF
Interval Fault Tree Analysis of Excavator VariableFrequency Speed Control System
2
作者 王晓明 李爱峰 +2 位作者 张永明 米金华 黄洪钟 《Journal of Donghua University(English Edition)》 EI CAS 2014年第6期763-765,769,共4页
In consideration of the uncertainty of basic events failure rate and lack of probability statistical information in fault tree analysis( FTA) of excavator variable-frequency speed control system, the interval theory w... In consideration of the uncertainty of basic events failure rate and lack of probability statistical information in fault tree analysis( FTA) of excavator variable-frequency speed control system, the interval theory was employed and combined with conventional FTA method. The basic events failure probabilities were described by interval numbers,and the interval operators of logical gates in FTA were deduced based on interval theory. Finally,the reliability assessment of excavator variable-frequency speed control system was done by interval FTA method. The result shows that the interval FTA method is suitable for the complex system with insufficient failure data. 展开更多
关键词 fault tree analysis(fta) interval theory interval probability EXCAVATOR electrical sytem
下载PDF
Fault Tree Analysis of CNC Machine Tool Based on BDD Technology
3
作者 于乐 晏晶 +1 位作者 姜梅 李彦锋 《Journal of Donghua University(English Edition)》 EI CAS 2015年第6期1020-1024,共5页
CNC machine tool is a large complex system which contains both mechanical and electrical components.As one of these components,the spindle is crucial for the performance of CNC machine tool.To improve the quality of C... CNC machine tool is a large complex system which contains both mechanical and electrical components.As one of these components,the spindle is crucial for the performance of CNC machine tool.To improve the quality of CNC machine,the reliability of spindle was evaluated in this paper using a fault tree analysis(FTA)method.The FTA method is a set of calculation methods based on Boolean algebra.However,it is difficult to analyze a large and complex fault tree with inaccurate results and low efficiency as well as the complexity of time and space.Both of them will result in the so-called "combinatorial explosion".To overcome this problem,the analysis method based on binary decision diagram(BDD)was introduced in our works,and a sorting method about bottom events was also recommended which can reduce the size of the BDD effectively. 展开更多
关键词 fault tree analysis(fta) binary decision diagram(BDD)sorting system reliability the spindle system
下载PDF
Revised Fault Free Analysis Method for Reliability Evaluation of Smart Grids
4
作者 宋国鹏 雷洪涛 郭波 《Journal of Donghua University(English Edition)》 EI CAS 2014年第6期870-874,共5页
Smart grid was proposed as a practical form of future power distribution system. Evaluating the reliability of smart grids was of great importance and significance. A revised fault tree model was proposed to distingui... Smart grid was proposed as a practical form of future power distribution system. Evaluating the reliability of smart grids was of great importance and significance. A revised fault tree model was proposed to distinguish and separate grid-connected operation mode and islanded operation mode of smart grids,focusing on the perspective of the consumers. A hierarchical Monte Carlo simulation method for reliability evaluation was also proposed based on the proposed fault tree model. A case of reliability evaluation for the future renewable electric energy delivery and management( FREEDM) system was carried out and analyzed. The proposed methods can be applicable to other forms of smart grids. 展开更多
关键词 smart grid fault tree analysis(fta) Monte Carlo simulation future renewable electric energy delivery and management(FREEDM) system
下载PDF
Reliability Analysis of Unmanned Aerial Vehicles Flight Control System Based on Reliability Analysis Technologies
5
作者 蔡爽 姜广君 《Journal of Donghua University(English Edition)》 EI CAS 2018年第3期264-269,共6页
The unmanned aerial vehicles( UAV) has been becoming more and more important in the aviation industry.Despite the superior performance and advanced technology,major accident of UAV happens frequently due to the impact... The unmanned aerial vehicles( UAV) has been becoming more and more important in the aviation industry.Despite the superior performance and advanced technology,major accident of UAV happens frequently due to the impact of their systems,long distance of remote control and skill of manipulator technology.According to the application of engineering application,failure mode effects and criticality analysis( FMECA),failure reporting analysis and corrective action comprehensive analysis systems( FRACAS)and fault tree analysis( FTA)( 3 F) were combined.And also a set of user-friendly,more time,more efficient and accurate reliability analysis system were explored. 展开更多
关键词 failure mode effect and criticality analysis(FMECA) failure reporting analysis and corrective action comprehensive analysis systems(FRACAS) fault tree analysis(fta) 3F integrated system analysis
下载PDF
基于可靠性屋的维修配置方法 被引量:4
6
作者 喻明让 何乾坤 +2 位作者 张英杰 陈琨 赵博选 《机械设计与制造工程》 2014年第1期15-19,共5页
将故障树分析(FTA)、失效模式影响分析(FMEA)整合到质量功能配置(QFD)中,建立了维修配置流程。首先对维修影响因素进行了重要度分析;然后建立了以维修性能目标函数最大和配置成本最低为目标的模型,将维修指标配置到具体的工程技术特征上... 将故障树分析(FTA)、失效模式影响分析(FMEA)整合到质量功能配置(QFD)中,建立了维修配置流程。首先对维修影响因素进行了重要度分析;然后建立了以维修性能目标函数最大和配置成本最低为目标的模型,将维修指标配置到具体的工程技术特征上;最后,以数控车床电主轴为例,验证了配置方法的有效性。 展开更多
关键词 维修配置 FAULT Tree analysis(fta) Quality Function Deployment(QFD) FAULT MODES and Effects Analy-sis(FMEA)
下载PDF
Optimal Allocation of Fleet's Spare Parts for System Reliability 被引量:2
7
作者 王鸿东 李丹 易宏 《Journal of Shanghai Jiaotong university(Science)》 EI 2017年第6期664-671,共8页
Allocation of fleet's spare parts is rarely studied due to its complexity. However, this task is extremely important because the warship's service level highly relies on the maintenance logistics' level. I... Allocation of fleet's spare parts is rarely studied due to its complexity. However, this task is extremely important because the warship's service level highly relies on the maintenance logistics' level. In this study, the readiness ratio is proposed as a critical index in measuring the system's reliability. A well-established mathematical model adopting the optimization method of spare part allocation is also introduced. The objective is to minimize the number of each spare part while satisfying the fleet's system reliability. The fault tree analysis(FTA) is applied to analyze the system's failure logic and stratify the units on ship. As a result, the strategy of spare part sharing can be introduced in detail. The solution algorithm is developed, and the simulation experiments to obtain the key parameters are conducted. The proposed model and algorithm are applied to an actual fleet of two warships, and results show that the method above is feasible and can be directly applied into practice. 展开更多
关键词 FLEET spare parts fault tree analysis(fta) system reliability
原文传递
Reliability evaluation of future photovoltaic systems with smart operation strategy 被引量:1
8
作者 Amir AHADI Hosein HAYATI +1 位作者 SeyedMohsen MIRYOUSEFI AVAL 《Frontiers in Energy》 SCIE CSCD 2016年第2期125-135,共11页
This paper investigates a new operation strategy for photovoltaic (PV) systems, which improves the overall reliability of the system as a result of the improvement in the reliability of the critical components. Firs... This paper investigates a new operation strategy for photovoltaic (PV) systems, which improves the overall reliability of the system as a result of the improvement in the reliability of the critical components. First, a mathematical model is proposed using the fault tree analysis (FTA) to estimate the reliability of the PV systems in order to find the suitable maintenance strategies. The implementations demonstrate that it is essential to employ smart maintenance plans and monitor the identified most critical components of PV systems. Then, an innovative analytical method based on the Markov process is presented to model smart operation plans in PV systems. The impact of smart operation strategy on the PV systems is then evaluated. The objective of this paper is to develop plans for improving the reliability of PV systems. A series of case studies have been conducted to demonstrate the importance of smart operation well as the applicability and method. strategies for PV systems as feasibility of the proposed 展开更多
关键词 smart operation strategy renewable energy fault tree analysis fta Markov model
原文传递
Influence of DC Supply Systems on Unplanned Reactor Trips in Nuclear Power Plants
9
作者 李君利 童节娟 茆定远 《Tsinghua Science and Technology》 SCIE EI CAS 2001年第1期84-88,共5页
Operational experience has shown that some components in nuclear power plants are so important that their failures, which would be a single failure, may cause the entire plant to shutdown. Such shutdowns have often oc... Operational experience has shown that some components in nuclear power plants are so important that their failures, which would be a single failure, may cause the entire plant to shutdown. Such shutdowns have often occurred in the past in commercial nuclear power plants. Nuclear power plant authorities try to avoid such unplanned plant shutdowns because of the large economic loss. Unfortunately, it is difficult to identify all the important components from the numerous components in each complex nuclear power plant system. FMEA and FTA methods, which are often applied to probabilistic risk assessments, are used in this paper to identify the key components that may cause unplanned reactor trips. As an example, the 48V DC power supply system in a typical Chinese nuclear power plant, which is a major cause of many unplanned reactor trips, was analyzed to show how to identify these key components and the causes for nuclear power plant trips. 展开更多
关键词 Nuclear Power Plant (NPP) Probabilistic Risk Assessment (PRA) Failure Mode Effect analysis (FMEA) Fault Tree analysis (fta)