The Deformation and Stress Analysis of Na Ba Reservoir Concrete Face Rock-Fill Dam
1
作者 Yin Shaofei Peng Hui +3 位作者 Wu Fan Wen Chen Jin Ke Han Kai 《Journal of Environmental Science and Engineering(B)》 2016年第10期489-494,共6页
Based on the APDL (ANSYS Parametric Design Language) and combined with the actual project related to parameters of filling material, imported Duncan-Chang constitutive model which has been widely applied in soil mas... Based on the APDL (ANSYS Parametric Design Language) and combined with the actual project related to parameters of filling material, imported Duncan-Chang constitutive model which has been widely applied in soil mass and rock-fill in the ANSYS software. With the three-dimensional nonlinear finite element analysis by the mid-point incremental method, what have been computed are the deformation and stress analysis ofNa Ba reservoir CFRD (Concrete Face Rock-fill Dam) in filling period. The calculation results provide practical reference for the dam during construction safety filling stress and deformation analysis and real-time monitoring. 展开更多
关键词 Concrete face rock-fill dam deformation and stress analysis Duncan-Chang constitutive model nonlinear finite element analysis.
下载PDF
Prediction of Concrete Faced Rock Fill Dams Settlements Using Genetic Programming Algorithm 被引量:3
2
作者 Seyed Morteza Marandi Seyed Mahmood VaeziNejad Elyas Khavari 《International Journal of Geosciences》 2012年第3期601-609,共9页
In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries a... In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries across the world is gathered with their reported settlements. The results showed that the GP model is able to estimate the dam settlement properly based on four properties, void ratio of dam’s body (e), height (H), vertical deformation modulus (Ev) and shape factor (Sc) of the dam. For verification of the model applicability, obtained results compared with other research methods such as Clements’s formula and the finite element model. The comparison showed that in all cases the GP model led to be more accurate than those of performed in literature. Also a proper compatibility between the GP model and the finite element model was perceived. 展开更多
关键词 CONCRETE faceD rock-fill damS Settlement Genetic Programming ALGORITHM Finite Element Model
下载PDF
Parameter sensitivity and inversion analysis of a concrete faced rock-fill dam based on HS-BPNN algorithm 被引量:9
3
作者 SUN PengMing BAO TengFei +3 位作者 GU ChongShi JIANG Ming WANG Tian SHI ZhongWen 《Science China(Technological Sciences)》 SCIE EI CAS CSCD 2016年第9期1442-1451,共10页
Considering the complex nonlinear relationship between the material parameters of a concrete faced rock-fill dam(CFRD) and its displacements, the harmony search(HS) algorithm is used to optimize the back propagation n... Considering the complex nonlinear relationship between the material parameters of a concrete faced rock-fill dam(CFRD) and its displacements, the harmony search(HS) algorithm is used to optimize the back propagation neural network(BPNN), and the HS-BPNN algorithm is formed and applied for the inversion analysis of the parameters of rock-fill materials. The sensitivity of the parameters in the Duncan and Chang's E-B model is analyzed using the orthogonal test design. The case study shows that the parameters φ0, K, Rf, and Kb are sensitive to the deformation of the rock-fill dam and the inversion analysis for these parameters is performed by the HS-BPNN algorithm. Compared with the traditional BPNN, the HS-BPNN algorithm exhibits the advantages of high convergence precision, fast convergence rate, and strong stability. 展开更多
关键词 parameter sensitivity analysis harmony search algorithm back propagation neural network parameter inversion concrete faced rock-fill dam
原文传递
Key technical problems of extra-high concrete faced rock-fill dam 被引量:2
4
作者 MA HongQi1? & CAO KeMing2 1Yunnan Huaneng Lancang River Hydropower Co., Ltd., Kunming 650011, China 2East China Investigation, Design & Research Institute, Hangzhou 310014, China 《Science China(Technological Sciences)》 SCIE EI CAS 2007年第z1期20-33,共14页
This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete ... This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000. 展开更多
关键词 CONCRETE faceD rock-fill dam extra-high dam KEY TECHNOLOGY
原文传递
混凝土挤压边墙在双河口面板堆石坝中的应用
5
作者 陈瑞忠 胡敏晖 《长江工程职业技术学院学报》 CAS 2007年第1期1-3,共3页
为了减少坝前填垫层料的超填工程量,简化混凝土面板施工前的削坡处理、斜坡碾压以及护坡砂浆施工等繁琐工序,给混凝土面板施工提供一个相对平整、均质的支托基础面,同时也为施工期间的防洪度汛提供一个防止雨水冲刷的稳固坡面,最大限度... 为了减少坝前填垫层料的超填工程量,简化混凝土面板施工前的削坡处理、斜坡碾压以及护坡砂浆施工等繁琐工序,给混凝土面板施工提供一个相对平整、均质的支托基础面,同时也为施工期间的防洪度汛提供一个防止雨水冲刷的稳固坡面,最大限度地延长筑坝施工时段,减轻高强度筑坝压力,确保大坝安全度汛,采用混凝土挤压边墙这一新技术、新工艺代替上游护坡砂浆施工不失为有效措施。 展开更多
关键词 混凝土挤压边墙 面板堆石坝 双河口