In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave th...In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave threat to the power grid security.The cause of the accident and the accident process were studied for the sake of further understanding of the impact of lightning on power grid.As an example,110 kV double circuit transmission line(Xilong-line) was analyzed.At first,the system topology was given.Through the analysis on relay protection actions and the fault recorder data,over voltage on the insulator strings was calculated.Based on the analysis and the calculation,accident cause and the process were presented respectively.Secondly,it comes to the conclusion that the lightning failure was caused by counterattack.The wave of the lightning over voltage would spread to the not grounded neutral point of the transformers,and make the neutral protective gap breakdown,then cause freewheeling with the frequency of 50 Hz.As results of the relay protection,the double circuit transmission line all tripped out.Finally,the causes of the accident were proposed that included terrain features,large corner towers,strong thunderstorm weather and poor grounded contact of the tower.展开更多
More and more high voltage direct current(HVDC) converters are being located in a load area in the Yangtze River Delta Region in China. It's large transmission capacity and intensive placement are hardly seen in o...More and more high voltage direct current(HVDC) converters are being located in a load area in the Yangtze River Delta Region in China. It's large transmission capacity and intensive placement are hardly seen in other countries. Accurate and reliable study tools and methods are extremely needed for power system engineers and researchers to deal with such problems which were never met before and otherwhere. A novel approach on electromagnetic modeling of alternating current / direct current(AC/DC) system is proposed and simulation is carried out to replay a real AC 3-phase to ground fault on a multi-infeed high voltage direct current(MIHVDC) system. AC system is specially simplified. Dynamic models and real parameters are adopted in main AC/DC equipments concerned and retained. Modeling and simulation are based on the power system computer aided design/electro-magnetic transient in direct current(PSCAD/EMTDC) system software package.Comparisons between simulation results and the records from the fault recorders are studied including both AC and DC quantities.展开更多
文摘In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave threat to the power grid security.The cause of the accident and the accident process were studied for the sake of further understanding of the impact of lightning on power grid.As an example,110 kV double circuit transmission line(Xilong-line) was analyzed.At first,the system topology was given.Through the analysis on relay protection actions and the fault recorder data,over voltage on the insulator strings was calculated.Based on the analysis and the calculation,accident cause and the process were presented respectively.Secondly,it comes to the conclusion that the lightning failure was caused by counterattack.The wave of the lightning over voltage would spread to the not grounded neutral point of the transformers,and make the neutral protective gap breakdown,then cause freewheeling with the frequency of 50 Hz.As results of the relay protection,the double circuit transmission line all tripped out.Finally,the causes of the accident were proposed that included terrain features,large corner towers,strong thunderstorm weather and poor grounded contact of the tower.
文摘More and more high voltage direct current(HVDC) converters are being located in a load area in the Yangtze River Delta Region in China. It's large transmission capacity and intensive placement are hardly seen in other countries. Accurate and reliable study tools and methods are extremely needed for power system engineers and researchers to deal with such problems which were never met before and otherwhere. A novel approach on electromagnetic modeling of alternating current / direct current(AC/DC) system is proposed and simulation is carried out to replay a real AC 3-phase to ground fault on a multi-infeed high voltage direct current(MIHVDC) system. AC system is specially simplified. Dynamic models and real parameters are adopted in main AC/DC equipments concerned and retained. Modeling and simulation are based on the power system computer aided design/electro-magnetic transient in direct current(PSCAD/EMTDC) system software package.Comparisons between simulation results and the records from the fault recorders are studied including both AC and DC quantities.