期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Fuzzy Comprehensive Judgment on the Mechanical Equipment Bid Sheet 被引量:1
1
作者 LIN Xiao-tang, WANG Ning-sheng,BAO Zheng-qiangDepartment of Mechanical and Electrical Engineering, Nanjing Universityof Aeronautics and Astronautics, Nanjing 210016, P. R. China2Department of Mechanical Engineering, Southeast University,Nanjing 210096, P. 《International Journal of Plant Engineering and Management》 2002年第2期99-104,共6页
The reasonable model of fuzzy comprehensive judgment is found by means of the theory and method of multi-level fuzzy judgment on the basis of the judging index system of mechanical equipment bid sheets. The scientific... The reasonable model of fuzzy comprehensive judgment is found by means of the theory and method of multi-level fuzzy judgment on the basis of the judging index system of mechanical equipment bid sheets. The scientific method is supplied for the judging bids, the key chain of the judging process of the mechanical equipment bid sheet. All factors are considered, especially quantitative factors or qualitative factors in the process of judgment. 展开更多
关键词 mechanical equipment judging bid fuzzy comprehensive judgment
下载PDF
Tank Fire Control Systems Accuracy Assignment Based on Fuzzy Comprehensive Judgment Method
2
作者 刘文果 陈杰 窦丽华 《Journal of Beijing Institute of Technology》 EI CAS 2003年第4期347-351,共5页
A method of accuracy assignment based on fuzzy comprehensive judgment method (FCJM) in tank fire control system is proposed. From the flowing route of the error sources and their respective correlative signals, the tr... A method of accuracy assignment based on fuzzy comprehensive judgment method (FCJM) in tank fire control system is proposed. From the flowing route of the error sources and their respective correlative signals, the transfer functions of several sources are analysed by means of mathematic simulation, and FCJM is applied to obtain the cost comprehensive factor for each part of system, combining its error sensitivity factor the mathematical model is built to solve the accuracy assignment problem. Simulation result shows the proposed method can help designer of tank fire control system work out an optimal system more efficiently and more economically. 展开更多
关键词 fire control system accuracy assignment error sources fuzzy comprehensive judgment
下载PDF
A Comprehensive Appraisal on the Characteristics of Coal-Bed Methane Reservoir in Turpan-Hami Basin 被引量:10
3
作者 TANG Shu-heng WANG Yan-bin ZHANG Dai-sheng 《Journal of China University of Mining and Technology》 EI 2007年第4期521-525,545,共6页
The rich coal-bed methane resources in the Turpan-Hami Basin are mainly located in the Shisanjianfang,Hami,Shanshan,Sha'erhu,Kekeya,Kerjian,Aidinghu inclines and the Dananhu coal-bed methane reservoirs. The big-ge... The rich coal-bed methane resources in the Turpan-Hami Basin are mainly located in the Shisanjianfang,Hami,Shanshan,Sha'erhu,Kekeya,Kerjian,Aidinghu inclines and the Dananhu coal-bed methane reservoirs. The big-ger coal-bed reservoirs are sitting at a depth of less than 1500 m. The coalbed methane generation,storage and confin-ing conditions of the Turpan-Hami basin can be indicated by eight key parameters. They are coal-bed thickness,coal rank,missing period,permeability,Langmuir volume,rock covering ability,structural confinement and hydrodynamic sealing environment. These parameters constitute a comprehensive appraisal index system of the coal-bed methane res-ervoir characteristics of the Turpan-Hami basin. In these parameters,the missing period of coal-bed methane is indi-cated by a stratum missing intensity factor. It reflects the relative exposure period of coal series. The results of a fuzzy comprehensive judgment showed that the Shisanjianfang coal-bed methane reservoir has the best prospects for exploita-tion and the Sha'erhu,Shanshan,Hami coal-bed methane reservoirs are next in line. 展开更多
关键词 coal-bed methane reservoir-forming characteristics key index fuzzy comprehensive judgment Turpan-Hami basin
下载PDF
Automatic Fixture Design for Non-rotational Parts Using Fuzzy Comprehensive Judgment Method
4
作者 吴丹 王先逵 蒲建 《Tsinghua Science and Technology》 SCIE EI CAS 1997年第4期77-81,共5页
Automatic fixture design is a key link in computer aided process planning. The uncertainty in the selection of fixture design schemes necessitates the use of the fuzzy comprehensive judgment method to automatically se... Automatic fixture design is a key link in computer aided process planning. The uncertainty in the selection of fixture design schemes necessitates the use of the fuzzy comprehensive judgment method to automatically select an optimal fixture design. This paper reports on the development of a computer aided fixture design system for non rotational parts using the fuzzy comprehensive judgment method running in an integrated process planning environment. Several typical non rotational parts with complicated configurations are used to demonstrate the automatic fixture design system. 展开更多
关键词 computer aided process planning fixture design fuzzy comprehensive judgment
原文传递
Dike Breach Risks of Different Flood Conditions in the Lower Yellow River 被引量:1
5
作者 Xia Fuqiang Wu Shaohong +2 位作者 Yang Qinye Kang Xiangwu Ma Xin 《Chinese Journal of Population,Resources and Environment》 2010年第1期18-27,共10页
Based on the analysis of hanging rivers' actuality in the lower Yellow River and researches related to the evaluation of dike breach risks,it is put forward that the influencing factors of dike beach risks in the ... Based on the analysis of hanging rivers' actuality in the lower Yellow River and researches related to the evaluation of dike breach risks,it is put forward that the influencing factors of dike beach risks in the lower Yellow River should involve four aspects,the flow and sediment movement,the regional crustal stability,the variation of river regime and the stability of river dikes.With this,the evaluation indexes system of dike breach risks is established,and with the support of geographic information systems technology,the model of multi-hierarchical fuzzy comprehensive judgment is applied to estimate the dike beach risks of the hanging rivers in the lower Yellow River under different flood conditions.The evaluation results of dike breach risks show the following distributing regularities of dike breach risks in the lower Yellow River:(1) Dike breach risks increase with the increase of the flood.(2) Dike breach risks decrease with the changes of river patterns along the channel.(3) There are great risks of dike breach in the wandering reaches,and it is relatively higher in the south bank than in the north in wandering reaches.(4) There is a higher dike breach risk in the north bank than in the south in winding reaches.Simultaneously,the evaluation results manifest that the evaluation indexes system established from the flow and sediment movement,the regional crustal stability,the variation of river regime and the stability of river dikes can represent the actual situation of the lower Yellow River more comprehensively.The application of multihierarchical fuzzy comprehensive judgment can preferably resolve the problem of hanging river dike breach,which has numerous influencing factors and complicated functionary mechanisms.The applications of geographic information systems technology with powerful spatial analysis functions make dike beach risks quantificationally displayed in different spatial positions,and reflect the differences of dike beach risks in different spatial positions of the channel in the lower Yellow River. 展开更多
关键词 the lower Yellow River influencing factors dike breach risk evaluation indexes system multi-hierarchical fuzzy comprehensive judgment
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部