期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
New Technology of Installing the Attached Self-Climbing Tower Steel Gantry Cranes
1
《International English Education Research》 2013年第12期224-228,共5页
The Liujiaxia Bridge is 536 m span steel truss stiffening Girder Bridge, tower with double-column steel concrete slructure, which is the world's largest diameter, the largest steel plate thickness of concrete pylon. ... The Liujiaxia Bridge is 536 m span steel truss stiffening Girder Bridge, tower with double-column steel concrete slructure, which is the world's largest diameter, the largest steel plate thickness of concrete pylon. Sarasota manufactured using standard pipe segment, group fight scene segment piecewise hoisting tower segment perfusion within the micro-expansion concrete construction technology, tower maximum height of 61.5 meters. This paper describes a piecewise Sarasota steel installation, piecewise perfusion within the micro-expansion concrete tower new construction method - attached to a self-climbing tower bridge ganlry crane mounted pylon construction technology of large steel components. Of the "entity attached to the pylon installation of equipment by section climb" design, composition and construction applications are described in detail. 展开更多
关键词 Self-Climbing Tower Steel Structure Attached to the gantry crane INSTALLATION Technology
下载PDF
Operations Scheduling for Rail Mounted Gantry Cranes in a Container Terminal Yard 被引量:3
2
作者 边展 李娜 +1 位作者 李向军 靳志宏 《Journal of Shanghai Jiaotong university(Science)》 EI 2014年第3期337-345,共9页
Arranging the retrieving sequence and making the operational plans for gantry cranes to enhance port efficiency have become vital issues for the container terminals. In this paper, the problem of retrieving containers... Arranging the retrieving sequence and making the operational plans for gantry cranes to enhance port efficiency have become vital issues for the container terminals. In this paper, the problem of retrieving containers from a yard in a given sequence is discussed as an important part of the ship-loading process. This problem is divided into three categories according to its optimization complexity, i.e., the retrieval problem of a crane with a single spreader(ACSS), the retrieval problem of a crane with multiple spreaders(ACMS), and the retrieval problem of multiple cranes with a single spreader(MCSS). Firstly, heuristic algorithms are proposed to develop a retrieving sequence for ACSS to reduce the operational time. Then, optimizing the assignment to multiple spreaders is conducted by exchanging the movements of the obtained retrieving sequence. Finally, the movements are further assigned to two cranes and integrated with the MCSS retrieval problem mentioned above.The numerical experiments show the effectiveness and practicability of the heuristic algorithms. 展开更多
关键词 rail mounted gantry cranes operations scheduling retrieving sequence heuristic rules
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部