The high resolution 3D nonlinear integrated inversion method is based on nonlinear theory. Under layer control, the log data from several wells (or all wells) in the study area and seismic trace data adjacent to the...The high resolution 3D nonlinear integrated inversion method is based on nonlinear theory. Under layer control, the log data from several wells (or all wells) in the study area and seismic trace data adjacent to the wells are input to a network with multiple inputs and outputs and are integratedly trained to obtain an adaptive weight function of the entire study area. Integrated nonlinear mapping relationships are built and updated by the lateral and vertical geologic variations of the reservoirs. Therefore, the inversion process and its inversion results can be constrained and controlled and a stable seismic inversion section with high resolution with velocity inversion, impedance inversion, and density inversion sections, can be gained. Good geologic effects have been obtained in model computation tests and real data processing, which verified that this method has high precision, good practicality, and can be used for quantitative reservoir analysis.展开更多
In reality, processing times are often imprecise and this imprecision is critical for the scheduling procedure. This research deals with flow-shop scheduling in rough environment. In this type of scheduling problem, ...In reality, processing times are often imprecise and this imprecision is critical for the scheduling procedure. This research deals with flow-shop scheduling in rough environment. In this type of scheduling problem, we employ the rough sets to represent the job parameters. The job processing times are assumed to be rough variables, and the problem is to minimize the makespan. Three novel types of rough scheduling models are presented. A rough simulation-based genetic algorithm is designed to solve these models and its effectiveness is well illustrated by numerical experiments.展开更多
This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained ...This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First,how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second,in order to satisfy the different requirements of decision-making,two novel fuzzy project scheduling models,expected cost model and credibility maximization model,are suggested. Third,a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.展开更多
A fuzzy optimization model of storage space allocation is proposed,and a rolling-planning method is derived. The model takes the uncertainty of departure time of import containers and arrival time of export containers...A fuzzy optimization model of storage space allocation is proposed,and a rolling-planning method is derived. The model takes the uncertainty of departure time of import containers and arrival time of export containers into account. For each planning horizon,the problem is decomposed into two levels: the first level minimizes the unbalanced workloads among blocks using hybrid intelligence algorithm;based on block workloads allocated in the above level,the second level minimizes the number of blocks to which the same group of import containers are split. Numerical results show that the model reduces workload imbalance,and speeds up the vessel loading and discharging process.展开更多
基金supported by the Key Project of the National Natural Scientific Foundation(Grant No.40839909)
文摘The high resolution 3D nonlinear integrated inversion method is based on nonlinear theory. Under layer control, the log data from several wells (or all wells) in the study area and seismic trace data adjacent to the wells are input to a network with multiple inputs and outputs and are integratedly trained to obtain an adaptive weight function of the entire study area. Integrated nonlinear mapping relationships are built and updated by the lateral and vertical geologic variations of the reservoirs. Therefore, the inversion process and its inversion results can be constrained and controlled and a stable seismic inversion section with high resolution with velocity inversion, impedance inversion, and density inversion sections, can be gained. Good geologic effects have been obtained in model computation tests and real data processing, which verified that this method has high precision, good practicality, and can be used for quantitative reservoir analysis.
基金Supported by the National Natural Science Foundationof China ( No. 6 0 1740 49),the Sino- French JoinL aboratory for Research in Com puter Science,Controland Applied Mathematics ( L IAMA ),and the KeyProject ( No.2 0 0 1A430 0 7) of Education D
文摘In reality, processing times are often imprecise and this imprecision is critical for the scheduling procedure. This research deals with flow-shop scheduling in rough environment. In this type of scheduling problem, we employ the rough sets to represent the job parameters. The job processing times are assumed to be rough variables, and the problem is to minimize the makespan. Three novel types of rough scheduling models are presented. A rough simulation-based genetic algorithm is designed to solve these models and its effectiveness is well illustrated by numerical experiments.
基金Supported by the National Natural Science Foundation of China (60975050)the Specialized Research Fund for the Doctoral Program of Higher Education of China (20070486081)
文摘This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First,how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second,in order to satisfy the different requirements of decision-making,two novel fuzzy project scheduling models,expected cost model and credibility maximization model,are suggested. Third,a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.
基金the Specialized Research Fund for the Doctoral Program of Higher Education (No. 200801411105)
文摘A fuzzy optimization model of storage space allocation is proposed,and a rolling-planning method is derived. The model takes the uncertainty of departure time of import containers and arrival time of export containers into account. For each planning horizon,the problem is decomposed into two levels: the first level minimizes the unbalanced workloads among blocks using hybrid intelligence algorithm;based on block workloads allocated in the above level,the second level minimizes the number of blocks to which the same group of import containers are split. Numerical results show that the model reduces workload imbalance,and speeds up the vessel loading and discharging process.