期刊文献+
共找到5,326篇文章
< 1 2 250 >
每页显示 20 50 100
Coordinated Mining Procedures of Open Pit Mines Based on River Management
1
作者 Baoyu CAO Zhiyong ZHANG +2 位作者 Bo WANG Ruirong DONG Hongjian WANG 《Asian Agricultural Research》 2024年第5期11-14,19,共5页
This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify... This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management. 展开更多
关键词 River management Open pit mine mining procedure Coordinated mining
下载PDF
A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems 被引量:2
2
作者 M.Nehring P.F.Knights +1 位作者 M.S.Kizil E.Hay 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2018年第2期205-214,共10页
In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying(IPCC) systems have been advanced as offering a real alternative to co... In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying(IPCC) systems have been advanced as offering a real alternative to conventional truck haulage systems. The implementation of IPCC systems in hard rock operations in open pit mines however requires different and more comprehensive planning approaches in order to adequately reflect the practical aspects associated with these. This paper investigates the impact that these approaches may have on the implementation of IPCC systems on a basic metalliferous deposit amenable to open pit exploitation. A strategic life of mine plan to provide numerous economic indicators for each approach is analyzed and compared to traditional truck haulage systems. The mine planning and evaluation process highlights the increased overall resource recovery that may accompany the use of IPCC systems. This investigation also provides insights into the issues associated with IPCC and the scale and type of operation and orebody that is likely to provide a feasible alternative to truck haulage. 展开更多
关键词 In pit CRUSHER conveyor SYSTEMS Strategic MINE planning Resource recovery Surface metalliferous mining MINE optimization Truck and SHOVEL
下载PDF
Study on Influencing Factors and Planning Model of Mining Quantity about Mineral Resources in Open Pit
3
作者 KE Lihua CHEN Jie 《矿物学报》 CAS CSCD 北大核心 2013年第S1期41-41,共1页
According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its... According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development. 展开更多
关键词 OPEN pit mining quantity LIFE-CYCLE COST PLANNING model
下载PDF
Study on the Application of Real-Time Drone Monitoring in Ordos Open-Pit Coal Mine
4
作者 Junyi Wu Weizheng Wang Xuesong Ni 《Open Journal of Applied Sciences》 CAS 2023年第4期483-495,共13页
In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detecti... In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detection by existing conventional monitoring methods, this paper establishes an open-pit mine monitoring data set, and proposes a real-time intelligent monitoring model based on UAV. The reasoning component with strong computing power and low power consumption is selected, and the lightweight object detection model is selected for the experiment. A quantitative standard of dynamic energy consumption detection by evaluation algorithm is proposed. Through experimental comparison, it is found that YOLOv4-tiny has the highest comprehensive grade in detection accuracy, speed, energy consumption and other aspects, which is suitable for application in the above model. 展开更多
关键词 Open-pit Mine Safety Monitoring UAV Object Detection
下载PDF
基于MineSight软件的米拉多铜矿露天采矿设计及其二次开发
5
作者 田坤 《世界有色金属》 2024年第1期28-30,共3页
露天采场作业面位置、矿石品位和公司管理层制订的生产任务等会直接影响生产计划的编制。本文介绍了米拉多铜矿应用矿业软件MineSight开展三维采矿设计的流程,以及应用Python编程语言,基于露天采场台阶参数关系,二次开发了采矿设计辅助... 露天采场作业面位置、矿石品位和公司管理层制订的生产任务等会直接影响生产计划的编制。本文介绍了米拉多铜矿应用矿业软件MineSight开展三维采矿设计的流程,以及应用Python编程语言,基于露天采场台阶参数关系,二次开发了采矿设计辅助工具。该工具可通过在界面直接输入不同的台阶高度和台阶坡面角,即可计算得到工作帮坡角和台阶宽度,进而将其应用于采矿设计。该软件提高了采矿设计的效率,为动态编制和优化短期生产计划提供了可靠的采场设计方案。 展开更多
关键词 露天采矿设计 MineSight PYTHON 二次开发
下载PDF
SICOMINES铜钴矿含尾砂高大边坡稳定性分析及治理思路
6
作者 李恩旺 鲁明星 《矿业工程》 CAS 2024年第3期22-27,共6页
刚果(金)SICOMINES铜钴矿M坑北部上部局部边坡处于不稳定状态,可能存在滑坡风险。本文采用二维极限平衡分析方法,对北部含尾砂高大边坡稳定性进行了边坡稳定性计算和分析,提出了整体边坡角不应大于31°的优化建议,并为后续边坡治理... 刚果(金)SICOMINES铜钴矿M坑北部上部局部边坡处于不稳定状态,可能存在滑坡风险。本文采用二维极限平衡分析方法,对北部含尾砂高大边坡稳定性进行了边坡稳定性计算和分析,提出了整体边坡角不应大于31°的优化建议,并为后续边坡治理提供了参考。 展开更多
关键词 露天采矿 边坡安全 边坡治理 地下水 尾砂
下载PDF
基于Rhino和3Dmine的露天煤矿边坡三维数值模型构建
7
作者 杜昌华 宋景辉 +2 位作者 张传伟 刘籽钰 吴建圻 《露天采矿技术》 CAS 2024年第1期43-46,共4页
针对露天煤矿边坡人工地表起伏突出和自然地层相对平滑的几何特点,以Rhino和3Dmine软件为过渡平台,以Nurbs和DTM曲面差值处理方法分别对露天煤矿地表和地层进行处理,最终在Rhino中完成露天煤矿边坡三维数值模型网格的划分及输出,实现兼... 针对露天煤矿边坡人工地表起伏突出和自然地层相对平滑的几何特点,以Rhino和3Dmine软件为过渡平台,以Nurbs和DTM曲面差值处理方法分别对露天煤矿地表和地层进行处理,最终在Rhino中完成露天煤矿边坡三维数值模型网格的划分及输出,实现兼顾人工地表特征和自然地层特征的露天煤矿边坡三维数值模型的全程可视化构建。工程案例分析结果表明:此方法所构建的数值模型可充分体现露天煤矿三维边坡的几何特点。 展开更多
关键词 RHINO 3Dmine 露天煤矿边坡 三数值模型 数值分析
下载PDF
关于3Dmine矿业软件在露天矿山短中期采剥规划中的应用实践
8
作者 黄成成 钱旭林 《世界有色金属》 2024年第8期29-32,共4页
在露天矿山开采过程中,往往因无法准确估算计划采剥区域的废石量、矿石量、废石资源量,同时难以直观的看出短中期计划采剥区域在开挖后会形成一个怎样的空间形态以及计划采剥区域范围内矿石量和围岩量,而导致在做短中期采剥计划过程中... 在露天矿山开采过程中,往往因无法准确估算计划采剥区域的废石量、矿石量、废石资源量,同时难以直观的看出短中期计划采剥区域在开挖后会形成一个怎样的空间形态以及计划采剥区域范围内矿石量和围岩量,而导致在做短中期采剥计划过程中无法进行合理的设备配置以及难以直观看到在短中期计划区域竣工后对整个采区下一步采剥规划的影响,主要包括:下一步采剥规划过程中的运输道路预布置、穿爆作业面布置、平台防排水沟道规划、动力管线布置等。本文主要介绍基于在露天矿山已应用3Dmine矿业软件完成对整个采剥区域的地质建模(主要包括采区的围岩、矿体、矿石品位、矿体号、经济类型、矿石种类)及每月计划结束后已完成地形图更新的基础上,应用3Dmine矿业软件对计划采剥区域块进行模拟设计,可解决上述问题。 展开更多
关键词 3Dmine 露天矿山 短中期计划 模型建立 计划区域报量
下载PDF
Reserve estimation of an open pit mine under price uncertainty by real option approach 被引量:8
9
作者 AKBARI Afshin Dehkharghani OSANLOO Morteza SHIRAZI Mohsen Akbarpour 《Mining Science and Technology》 EI CAS 2009年第6期709-717,共9页
Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a hig... Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners. 展开更多
关键词 RESERVE open pit mining metal price uncertainty Real Option Approach (ROA) copper deposit
下载PDF
Numerical simulation study of the influence on stability of slope by underground mining under opencast coal mine slope 被引量:2
10
作者 LIU Ting-ting LU Guo-bin TONG Li-ming 《Journal of Coal Science & Engineering(China)》 2011年第4期397-400,共4页
In view of the study on mining transferred from open-pit to underground, the research on the problem of the stabil- ity of slope is less. This article combined the actual situation of the Gaohai Coal Mine in Fuxin Cit... In view of the study on mining transferred from open-pit to underground, the research on the problem of the stabil- ity of slope is less. This article combined the actual situation of the Gaohai Coal Mine in Fuxin City and set up a three-dimensional model of the part of Huizhou open-pit slope by the finite difference software. Through the three-dimensional numerical simulation study of the influence on the stability of slope by underground mining, the basic characteristics of the open-pit slope deformation and the situation of basic stability were discussed. The simulation results of the mining slope of the displacement and deformation analysis of the state for mining provide a reference to the slope stability research. 展开更多
关键词 numerical simulation slope stability open-pit mine pit mining
下载PDF
Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit 被引量:1
11
作者 Rahimi ESMAEIL Moosavi EHSAN +1 位作者 Shirinabadi REZA Gholinejad MEHRAN 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第6期1475-1488,共14页
An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information a... An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information and the benefits it engenders in the mining economy. Hence, it is important to create optimizing algorithms to reduce the errors of economic calculations. In this work, a logical mathematical algorithm that considers the important designing parameters and the mining economy is proposed. This algorithm creates an optimizing repetitive process among different designing constituents and directs them into the maximum amount of the mine economical parameters. This process will produce the highest amount of ores and the highest degree of safety. The modeling produces a new relation between the concept of the cutoff grade, mine designing, and mine planning, and it provides the maximum benefit by calculating the destination of the ores. The proposed algorithm is evaluated in a real case study. The results show that the net present value of the mine production is increased by 3% compared to previous methods of production design and UPL. 展开更多
关键词 mined material destination ultimate pit limit net present value production planning
下载PDF
Mining production information management system in an open pit based on GIS/GPS/GPRS/RFID 被引量:1
12
作者 GU Qing-hua LU Cai-wu +1 位作者 LI Fa-ben JING Shi-gun 《Journal of Coal Science & Engineering(China)》 2010年第2期176-181,共6页
Using GIS, GPS, GPRS and RFID, a dynamic information management system of digital mining in an open pit was designed and developed.A linear programming model was set up in a practical application.By the model, the sys... Using GIS, GPS, GPRS and RFID, a dynamic information management system of digital mining in an open pit was designed and developed.A linear programming model was set up in a practical application.By the model, the system can automatically draw up production plan of ore blending well every day.The system can monitor and dispatch open-pit trucks and shovels well, and can play back their historical paths.It can monitor and control the process of mining production in real time.By RFID, the system can also count the number of trucks'delivery and shovels'loading automatically.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards of mining in open pits. 展开更多
关键词 GIS GPS GPRS RFID linear programming mining open pit
下载PDF
Application of open-pit and underground mining technology for residual coal of end slopes 被引量:9
13
作者 CHE, Zhaoxue YANG, Hong 《Mining Science and Technology》 EI CAS 2010年第2期266-270,共5页
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech... Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized. 展开更多
关键词 integrated open-pit and underground mining end-slope resource recovery economic benefit surface coal mine
下载PDF
Optimization of transport passage with dragline system in thick overburden open pit mine 被引量:3
14
作者 Zhang Weishi Cai Qingxiang Chen Shuzhao 《International Journal of Mining Science and Technology》 SCIE EI 2013年第6期901-906,共6页
According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport p... According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure. 展开更多
关键词 Open pit mine DRAGLINE Transport passage Middle passage Internal dump
下载PDF
Cut slope reinforcement technique in open-pit mines 被引量:3
15
作者 YongtaoGao JianboSun +1 位作者 ShunchuanWu AibingJin 《Journal of University of Science and Technology Beijing》 CSCD 2004年第4期289-292,共4页
The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geologica... The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carriedout, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria wasemployed. A patent technology, named 'Technology of high pressure and multiple grouting in differentlevels within a single hole', was employed in the construction. Anchor bars were also installed asgrouting proceeds. This method combines anchoring and grouting comprehensively and was foundsuccessful in practice. 展开更多
关键词 mining engineering open-pit slope weak formation SUPPORTING high pressuregrouting
下载PDF
Optimization model of truck flow at open-pit mines and standards for feasibility test 被引量:2
16
作者 YingZhang YongZhao QiweiLu WenliXu 《Journal of University of Science and Technology Beijing》 CSCD 2004年第5期389-393,共5页
In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual sched... In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual schedule method. The model has advantages from linearprogramming and objective programming, makes most handling points working at full capacity and keepsan optimized ratio between trucks and excavators. For ensuring feasibility of the model inpractical production, four standards for feasibility test were proposed. The model satisfied all thestandards. The application in a large scale open-pit iron mine indicated that the model reduced thenumber of required trucks by 10 percent compared with the fixed manual schedule method. 展开更多
关键词 open-pit mine truck flow linear programming mathematical model FEASIBILITY
下载PDF
A new framework for evaluation of rock fragmentation in open pit mines 被引量:4
17
作者 Mohammad Babaeian Mohammad Ataei +2 位作者 Farhang Sereshki Farzad Sotoudeh Sadjad Mohammadi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第2期325-336,共12页
The main purpose of blasting in open pit mines is to produce the feed for crushing stage with the optimum dimensions from in situ rocks. The size distribution of muck pile indicates the efficiency of blasting pattern ... The main purpose of blasting in open pit mines is to produce the feed for crushing stage with the optimum dimensions from in situ rocks. The size distribution of muck pile indicates the efficiency of blasting pattern to reach the required optimum sizes. Nevertheless, there is no mature model to predict fragmentation distribution to date that can be used in various open pit mines. Therefore, a new framework to evaluate and predict fragmentation distribution is presented based on the image analysis approach. For this purpose, the data collected from Jajarm bauxite mine in Iran were used as the sources in this study. The image analysis process was performed by Split-Desktop software to find out fragmentation distribution, uniformity index and average size of the fragmented rocks. Then, two different approaches including the multivariate regression method and the decision-making trial and evaluation laboratory(DEMATEL) technique were incorporated to develop new models of the uniformity index and the average size to improve the Rosin-Rammler function. The performances of the proposed models were evaluated in four blasting operation sites. The results obtained indicate that the regression model possesses a better performance in prediction of the uniformity index and the average size and subsequently the fragmentation distribution in comparison with DEMATEL and conventional Rosin-Rammler models. 展开更多
关键词 Rock FRAGMENTATION Image analysis Open pit mine Split-desktop software package Decision-making TRIAL and EVALUATION laboratory(DEMATEL)technique
下载PDF
Thermal recovery process of a backfilled open-pit in permafrost area at the Gulian strip coal mine in Northeast China 被引量:1
18
作者 GAO Shu-hui HE Rui-xia +3 位作者 JIN Hui-jun HUANG Ya-dong ZHANG Jian-ming LUO Dong-liang 《Journal of Mountain Science》 SCIE CSCD 2017年第11期2212-2229,共18页
Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical ... Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions. 展开更多
关键词 Coal-mine open-pit BACKFILL Numericalsimulation THERMAL recovery process SENSITIVITYANALYSIS Gulian STRIP coal mine
下载PDF
Stability analysis of the sliding process of the west slope in Buzhaoba Open-Pit Mine 被引量:1
19
作者 Ning Fang Ji Changsheng Garmondyu E.Crusoe Jr. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期869-875,共7页
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th... To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P. 展开更多
关键词 Open-pit mine Side slope Sliding process Aging stability Crack zone
下载PDF
Optimization of Dump Bench Configuration to Improve Waste Dump Capacity of Narynsukhait Open Pit Coal Mine 被引量:1
20
作者 Tsedendorj Amarsaikhan Hideki Shimada +2 位作者 Sugeng Wahyudi Takashi Sasaoka Akihiro Hamanaka 《International Journal of Geosciences》 2018年第6期379-396,共18页
In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase ... In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase capacity of the dump in future. This paper describes current condition of waste dump of Narynsukhait coal mine and then discusses the optimization of waste dump geometry by analyzing the effect of different waste dump’s bench configuration on slope performance. Optimization of the geometry is carried out by investigating and comparing the performance of geometrical combinations of bench height, bench angles and number of safety berm by means of numerical modeling. The model shows that increasing height of bench is able to induce shear stress in the bench and may initiate bench instable. However, the shear stress can be limited by having safety berm and/or reducing bench angle to satisfy the stability criteria. 展开更多
关键词 WASTE DUMP BENCH Stability BENCH CONFIGURATION Open pit Coal Mine
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部