The assessment and analysis of railway infra structure capacity is an essential task in railway infra structure management carried out to meet the required quality and capacity demand of railway transport. For sustain...The assessment and analysis of railway infra structure capacity is an essential task in railway infra structure management carried out to meet the required quality and capacity demand of railway transport. For sustainable and dependable infrastructure management, it is important to assess railway capacity limitation from the point of view of infrastructure performance. However, the existence of numerous performance indicators often leads to diffused information that is not in a format suitable to support decision making. In this paper, we demonstrated the use of fuzzy inference system for aggregating selected railway infrastructure performance indicators to relate maintenance function to capacity situation. The selected indicators consider the safety, comfort, punctuality and reliability aspects of railway infrastructure performance. The resulting composite indicator gives a reliable quanti fication of the health condition or integrity of railway lines. A case study of the assessment of overall infrastructure performance which is an indication of capacity limitation is presented using indicator data between 2010 and 2012 for five lines on the network of Trafikverket (Swedish Trans port Administration). The results are presented using cus tomised performance dashboard for enhanced visualisation,quick understanding and relevant comparison structure conditions for strategic management. This gives additional information on capacity status and limitation from maintenance management perspective.展开更多
基金financial support of Trafikverket and Lulea Railway Research Centre
文摘The assessment and analysis of railway infra structure capacity is an essential task in railway infra structure management carried out to meet the required quality and capacity demand of railway transport. For sustainable and dependable infrastructure management, it is important to assess railway capacity limitation from the point of view of infrastructure performance. However, the existence of numerous performance indicators often leads to diffused information that is not in a format suitable to support decision making. In this paper, we demonstrated the use of fuzzy inference system for aggregating selected railway infrastructure performance indicators to relate maintenance function to capacity situation. The selected indicators consider the safety, comfort, punctuality and reliability aspects of railway infrastructure performance. The resulting composite indicator gives a reliable quanti fication of the health condition or integrity of railway lines. A case study of the assessment of overall infrastructure performance which is an indication of capacity limitation is presented using indicator data between 2010 and 2012 for five lines on the network of Trafikverket (Swedish Trans port Administration). The results are presented using cus tomised performance dashboard for enhanced visualisation,quick understanding and relevant comparison structure conditions for strategic management. This gives additional information on capacity status and limitation from maintenance management perspective.