We develop an interconnect crosstalk estimation model on the assumption of linearity for CMOS device. First, we analyze the terminal response of RC model on the worst condition from theS field to the time domain. The ...We develop an interconnect crosstalk estimation model on the assumption of linearity for CMOS device. First, we analyze the terminal response of RC model on the worst condition from theS field to the time domain. The exact 3 order coefficients inS field are obtained due to the interconnect tree model. Based on this, a crosstalk peak estimation formula is presented. Unlike other crosstalk equations in the literature, this formula is only used coupled capacitance and grand capacitance as parameter. Experimental results show that, compared with the SPICE results, the estimation formulae are simple and accurate. So the model is expected to be used in such fields as layout-driven logic and high level synthesis, performance-driven floorplanning and interconnect planning.展开更多
In order to reduce the complexity of neural network connectivity,a dy-namical model for unfully interconnected neural network,including its energy func-tion,local area field and learning rule,is presented.The basic id...In order to reduce the complexity of neural network connectivity,a dy-namical model for unfully interconnected neural network,including its energy func-tion,local area field and learning rule,is presented.The basic idea is to decompose aHopfield network into several subnetworks and set up some interconnections betweenthem.The statistical analysis of the associative memory process shows that the num-ber of interconnections after the first decomposition is reduced by 25% comparedwith that of the Hopfield network,but the storage capacity and the associative abilityof the network remain unchanged.With the decomposition continued,the number ofinterconnections is considerably reduced.Despite the reduction in storage capacityand associative ability with continuous decomposition,the average information capac-ity per interconnection has increased nearly by 100%.Finally the relationship be-tween high-order interconnection and multilayer network architecture is discussed.展开更多
The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These...The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These projects may be influenced by a few factors that are neither technological nor economic,such as political,social,and international factors.This paper thus presents a multi-level model for recognizing which factor from a compiled list of 14 would impact a particular intercontinental interconnection project and for assessing the degree of the factor’s influence.In the first part of the model,the Analytic Hierarchy Process(AHP)method is used to recognize the project’s most significant impact factors.Using the recognition results,the second part of the model can assess the degree of the factor’s influence on the project based on ratings provided by experts.A comprehensive evaluation can thus be provided.As a case study,the proposed Saudi Arabia-Ethiopia power grid interconnection project connecting Asia and Africa was analyzed.Derived from a combination of multiple opinions from experts,evaluations from the model will be of direct benefit to decision-makers,investors,project implementers,and engineers,providing them with a deeper insight into the project.展开更多
通信网络是输电线路在线监测系统的重要组成部分,关系到监测数据的完整性和安全性。由于现行通信网络在实际监测中的数据通信效果并不理想,吞吐量较低且丢包率较高,通信网络性能存在一定缺陷。为解决这一问题,文章提出基于5G的输电线路...通信网络是输电线路在线监测系统的重要组成部分,关系到监测数据的完整性和安全性。由于现行通信网络在实际监测中的数据通信效果并不理想,吞吐量较低且丢包率较高,通信网络性能存在一定缺陷。为解决这一问题,文章提出基于5G的输电线路在线监测通信网络设计。利用5G技术来设计输电线路在线监测的通信网络模型和信道,同时基于开放式系统互连(Open System Interconnect,OSI)参考模型来设计通信网络协议,从而完成基于5G的输电线路在线监测通信网络的整体设计。经实验验证,所设计的通信网络吞吐性能良好,丢包率在1%以下,输电线路在线监测通信效果良好。展开更多
为了减弱极端事件对综合能源系统的影响,尽早恢复各类负荷,提高系统弹性。文中提出了一种考虑交通网与配电网级别的区域电-气互联系统(Interconnection Electric and Gas System, IEGS)协同运行的灾后故障抢修策略。首先,通过元胞传输...为了减弱极端事件对综合能源系统的影响,尽早恢复各类负荷,提高系统弹性。文中提出了一种考虑交通网与配电网级别的区域电-气互联系统(Interconnection Electric and Gas System, IEGS)协同运行的灾后故障抢修策略。首先,通过元胞传输模型建立了考虑系统实时恢复指标修正的交通流量分配模型,对交通网的交通流量进行预测;其次,在故障预分配的前提下建立了区域IEGS的故障恢复模型,协调优化维修队、分布式电源、配电网网架等资源,减少停电损失;然后以维修队的最小通行时间矩阵以及由系统实时恢复指标得到的交通网道路修正参数作为传递变量,在维修队开始移动的时间点,重新计算后续的修复计划以及交通网的运行情况,进行多时间断面优化;最后,通过算例仿真进行对比,验证了所提策略的有效性,并分析移动储能装置对故障恢复的影响。展开更多
基金SupportedbytheNationalHighTechnologyResearchandDevelopmentProgramofChina (863Plan) (863 SOC Y 3 3 2 )
文摘We develop an interconnect crosstalk estimation model on the assumption of linearity for CMOS device. First, we analyze the terminal response of RC model on the worst condition from theS field to the time domain. The exact 3 order coefficients inS field are obtained due to the interconnect tree model. Based on this, a crosstalk peak estimation formula is presented. Unlike other crosstalk equations in the literature, this formula is only used coupled capacitance and grand capacitance as parameter. Experimental results show that, compared with the SPICE results, the estimation formulae are simple and accurate. So the model is expected to be used in such fields as layout-driven logic and high level synthesis, performance-driven floorplanning and interconnect planning.
文摘In order to reduce the complexity of neural network connectivity,a dy-namical model for unfully interconnected neural network,including its energy func-tion,local area field and learning rule,is presented.The basic idea is to decompose aHopfield network into several subnetworks and set up some interconnections betweenthem.The statistical analysis of the associative memory process shows that the num-ber of interconnections after the first decomposition is reduced by 25% comparedwith that of the Hopfield network,but the storage capacity and the associative abilityof the network remain unchanged.With the decomposition continued,the number ofinterconnections is considerably reduced.Despite the reduction in storage capacityand associative ability with continuous decomposition,the average information capac-ity per interconnection has increased nearly by 100%.Finally the relationship be-tween high-order interconnection and multilayer network architecture is discussed.
基金supported by the State Grid Science and Technology Project“Research on Method and Evaluation Principle for the Cross-Continent Power Transmission Planning Scheme”(SGTYHT/16-JS-198)。
文摘The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These projects may be influenced by a few factors that are neither technological nor economic,such as political,social,and international factors.This paper thus presents a multi-level model for recognizing which factor from a compiled list of 14 would impact a particular intercontinental interconnection project and for assessing the degree of the factor’s influence.In the first part of the model,the Analytic Hierarchy Process(AHP)method is used to recognize the project’s most significant impact factors.Using the recognition results,the second part of the model can assess the degree of the factor’s influence on the project based on ratings provided by experts.A comprehensive evaluation can thus be provided.As a case study,the proposed Saudi Arabia-Ethiopia power grid interconnection project connecting Asia and Africa was analyzed.Derived from a combination of multiple opinions from experts,evaluations from the model will be of direct benefit to decision-makers,investors,project implementers,and engineers,providing them with a deeper insight into the project.
文摘通信网络是输电线路在线监测系统的重要组成部分,关系到监测数据的完整性和安全性。由于现行通信网络在实际监测中的数据通信效果并不理想,吞吐量较低且丢包率较高,通信网络性能存在一定缺陷。为解决这一问题,文章提出基于5G的输电线路在线监测通信网络设计。利用5G技术来设计输电线路在线监测的通信网络模型和信道,同时基于开放式系统互连(Open System Interconnect,OSI)参考模型来设计通信网络协议,从而完成基于5G的输电线路在线监测通信网络的整体设计。经实验验证,所设计的通信网络吞吐性能良好,丢包率在1%以下,输电线路在线监测通信效果良好。
文摘为了减弱极端事件对综合能源系统的影响,尽早恢复各类负荷,提高系统弹性。文中提出了一种考虑交通网与配电网级别的区域电-气互联系统(Interconnection Electric and Gas System, IEGS)协同运行的灾后故障抢修策略。首先,通过元胞传输模型建立了考虑系统实时恢复指标修正的交通流量分配模型,对交通网的交通流量进行预测;其次,在故障预分配的前提下建立了区域IEGS的故障恢复模型,协调优化维修队、分布式电源、配电网网架等资源,减少停电损失;然后以维修队的最小通行时间矩阵以及由系统实时恢复指标得到的交通网道路修正参数作为传递变量,在维修队开始移动的时间点,重新计算后续的修复计划以及交通网的运行情况,进行多时间断面优化;最后,通过算例仿真进行对比,验证了所提策略的有效性,并分析移动储能装置对故障恢复的影响。