期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Ice accumulation and thickness distribution before inverted siphon 被引量:9
1
作者 付辉 郭新蕾 +2 位作者 杨开林 王涛 郭永鑫 《Journal of Hydrodynamics》 SCIE EI CSCD 2017年第1期61-67,共7页
In winter, the safe operation and the water transfer efficiency of an inverted siphon are big concerns for water diversion projects in a high latitude area. This paper takes the Tanghe inverted siphon of the Middle Ro... In winter, the safe operation and the water transfer efficiency of an inverted siphon are big concerns for water diversion projects in a high latitude area. This paper takes the Tanghe inverted siphon of the Middle Route of the South-to-North Water Diversion Project in China as an example, and carries out experimental studies under the real ice condition with different water levels, flow discharges and submerged depths. The ice accumulation process and the ice jam thickness distribution before the inverted siphon are tested and measured. The characteristics of the ice jam distribution and the relationship between ti /H (ratio of ice jam thickness tt to total water level H ) and Fr, (Froude number under ice jam) are analyzed. An equation for the ice jam thickness calculation before the inverted siphon is put forward. Analysis results might help the thickness prediction and the ice jam prevention of similar water diversion projects during ice period. 展开更多
关键词 inverted siphon ice jam water diversion ice thickness real ice experiment
原文传递
Safe operation of inverted siphon during ice period 被引量:2
2
作者 付辉 杨开林 +2 位作者 郭新蕾 郭永鑫 王涛 《Journal of Hydrodynamics》 SCIE EI CSCD 2015年第2期204-209,共6页
Sixteen inverted siphons are in operation at the Beijing-Shijiazhuang section in the Middle Route of the South-to-North Water Diversion Project. Their safe operation is closely related to the safety and the water dive... Sixteen inverted siphons are in operation at the Beijing-Shijiazhuang section in the Middle Route of the South-to-North Water Diversion Project. Their safe operation is closely related to the safety and the water diversion efficiency of the whole project during an ice period. The ice accumulation process at the inlet of the inverted siphon is modeled under a real ice condition, and then the hydraulic conditions of the ice jam prevention are confirmed. According to the experimental results and the design sizes of the inverted siphons, the detailed safe water diversion discharge and the operational water level are studied. Analysis results of these inverted siphons provide references for the safe operation and the reasonable regulations during the ice period. 展开更多
关键词 inverted siphon ice period safe operation real ice experiment water diversion project
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部