期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
JSG-8火灾监控系统在煤矿火灾中的应用研究
1
作者 张纯波 《煤炭与化工》 CAS 2014年第5期125-126,129,共3页
介绍JSG-8火灾监控系统的主要功能,说明其与传统方式相比,具有操作简单,方便管理,精确度高,运行稳定等特点,并且可有效提高生产安全性,节省经费,有较好的经济效益和安全效益,为类似情况的矿井提供借鉴经验。
关键词 jsg-8 火灾 监控 煤矿
下载PDF
Integrated Water Resource Assessment of Irrigation System of Haryana
2
作者 Shiv Singh Rawat S. Lahari A. K. Gosain 《Agricultural Sciences》 2018年第4期489-510,共22页
Agriculture is the major activity in the state of Haryana and large volume of water is required to meet the irrigation demands of the crops grown. But, there is limited water availability in the state. Haryana receive... Agriculture is the major activity in the state of Haryana and large volume of water is required to meet the irrigation demands of the crops grown. But, there is limited water availability in the state. Haryana receives water from Yamuna River and Bhakra system. Sowmelt, rainfall and groundwater are main sources of water in the catchment. It is essential to integrate the manmade canal system with hydrological system. This paper focuses on integrated hydrological modeling framework to conceptualize the system and to assess the Water Resources of the state. Snowmelt and Rainfall runoff modeling using GR4JSG model were combined to model the inflows to the irrigation system of Haryana. Irrigator canal model of eWater Source has been used to generate water demands from crops grown. The water balance and water use efficiency have been worked out for each district of Haryana. The hydro climate input data, stream flows, crop data and soil data have been used in the study. The flows modeled at Tuini (P), Yashwant Nagar, Bausan, Haripur, Poanta and HKB sites were compared with the observed flows. The objective function of NSE Daily and log Flow duration was used for model calibration and validation at various locations up to Mathura, the outlet of the study area. The value of the objective function at Mathura was 0.54, a fairly good value. The results of the Irrigator canal model have shown that all the Inflows, Outflows and the Utilizations of water have been properly balanced for each district. The water use efficiency of districts varies from 27% to 59%. The overall water use efficiency for Haryana canal system has been calculated as 39%. This is low value indicating excess water is being extracted to meet the water demands. 展开更多
关键词 HYDROLOGICAL Modeling GR4jsg MODEL GR4J MODEL MODIS Snow Cover IRRIGATOR CANAL MODEL eWater Source WATER Balance and WATER Use Efficiency
下载PDF
潜盾机在到达井外侧地盘中安全弃壳之案例研讨 被引量:1
3
作者 倪至宽 郑文杰 赖旭明 《隧道建设》 2007年第S2期387-396,共10页
捷运潜盾隧道皆位于人口密集之都会区,潜盾机的发进与到达常为潜盾隧道挖掘过程中风险较大的时间点,本研究拟以潜盾机到达弃壳作业为例,探讨其面临之风险,包括点井降水造成地盘地下水位变化和邻近台电345kV高压电塔不均匀沉陷,以及站体... 捷运潜盾隧道皆位于人口密集之都会区,潜盾机的发进与到达常为潜盾隧道挖掘过程中风险较大的时间点,本研究拟以潜盾机到达弃壳作业为例,探讨其面临之风险,包括点井降水造成地盘地下水位变化和邻近台电345kV高压电塔不均匀沉陷,以及站体连续壁因开挖所引致侧向变位使JSG地盘改良区产生缝隙水路,造成潜盾机开舱前渗水的风险。再者,依据工址抽降水期间竖管式水压计、水位观测井和地表、建物沉陷点监测数据分析抽降水引致地表沉陷影响范围,用以回馈将来遭遇类似工况的设计参考依据。潜盾机到达之安全弃壳作业包括以超级点井(SWP)工法尝试降低地下水位,并于松三层(EL.92.42m)和松五层(EL.72.42m)埋设竖管式水压计了解降水期间地下水位变化,同时监测邻近建物如台电高压电塔的倾斜及沉陷;其次,在潜盾机到达处先行进行JSG地盘改良,再以试水试验检核地盘止水性,潜盾机到达后即进行机壳背填灌浆、土压舱分阶排土及漏水确认。然后,潜盾机历经二次拆解,完成到达弃壳作业,最后进行镜面破除及隧道贯通。 展开更多
关键词 潜盾机 超级点井 高压喷射地盘改良 镜面
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部