High Slope Stability of Diversion Power System Intake of Jinchuan Hydropower Station 被引量:1
1
作者 TANG Liang-qin TANG Kui +2 位作者 NIE De-xin WANG Jun-jie LIU Dong-yan 《Journal of Mountain Science》 SCIE CSCD 2013年第6期1109-1117,共9页
The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization b... The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization become one of the most important geological engineering problems. At the same time, it is also crucial to select a safe and economic excavation gradient for the construction. We studied the problem of how to select a safe and economic slope ratio by analyzing the geological condition of the high slope, including the lithology, slope structure, structural surface and their combinations, rock weathering and unloading, hydrology, and the natural gradient. The study results showed that the use of an excavation gradient larger than the gradient observed during site investigation and the gradient recommended in standards and field practice manuals is feasible. Then, we used the finite element method and rigid limit equilibrium method to evaluate the stability of the excavation slope under natural, rainstorm and earthquake conditions. The calculated results showed that the excavated slope only has limited failure, but its stability is greatly satisfactory. The research findings can be useful in excavation and slope stabilization projects. 展开更多
关键词 jinchuan hydropower station Highslope Excavation slope ratio STABILITY
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部