●AIM:To introduce the macular hole(MH)hydromassage technique as a potentially beneficial approach for the treatment of large or persistent MH.●METHODS:This retrospective observational case series comprised 16 consec...●AIM:To introduce the macular hole(MH)hydromassage technique as a potentially beneficial approach for the treatment of large or persistent MH.●METHODS:This retrospective observational case series comprised 16 consecutive patients(17 eyes)diagnosed with MH.Inclusion criteria involved a hole aperture diameter larger than 600μm or the presence of an unclosed MH larger than 600μm following the previous vitrectomy.Standard MH repair procedures were administered in all cases,involving the manipulation and aspiration of the hole margin through the application of water flow with a soft-tip flute needle.A comprehensive assessment was conducted for each case before and after surgery,and optical coherence tomography(OCT)images were captured at every follow-up point.●RESULTS:The mean preoperative aperture diameter was 747±156μm(range 611-1180μm),with a mean base diameter of 1390±435μm(range 578-2220μm).Following surgery,all cases achieved complete anatomical closure of MH,with 13 cases(76.5%)exhibiting type 1 closure and 4 cases(23.5%)demonstrating type 2 closure.No significant differences were observed in the preoperative OCT variables between the two closure types.Eyes with type 1 closure showed a significantly improved visual acuity(0.70±0.10,range 0.50-0.80)compared to those with type 2 closure(0.90±0.12,range 0.80-1.00,P=0.014).●CONCLUSION:The MH hydromassage technique demonstrates promising results,achieving acceptable closure rates in cases of large or persistent MH.This technique may serve as an effective adjunctive maneuver during challenging MH surgery.展开更多
Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr...Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.展开更多
For plane singly-connected domains with insulating boundary and four point-sized contacts, C<sub>0</sub> …C<sub>3</sub>, van der Pauw derived a famous equation relating the two trans-...For plane singly-connected domains with insulating boundary and four point-sized contacts, C<sub>0</sub> …C<sub>3</sub>, van der Pauw derived a famous equation relating the two trans-resistances R<sub>01,23</sub>, R<sub>12,30</sub> with the sheet resistance without any other parameters. If the domain has one hole van der Pauw’s equation becomes an inequality with upper and lower bounds, the envelopes. This was conjectured by Szymański et al. in 2013, and only recently it was proven by Miyoshi et al. with elaborate mathematical tools. The present article gives new proofs closer to physical intuition and partly with simpler mathematics. It relies heavily on conformal transformation and it expresses for the first time the trans-resistances and the lower envelope in terms of Jacobi functions, elliptic integrals, and the modular lambda elliptic function. New simple formulae for the asymptotic limit of a very large hole are also given.展开更多
Background:Inverted internal limiting membrane (ILM) flap technique has recently been reported in a limited number of studies as an effective surgical technique for the management of large macular holes (MHs) wit...Background:Inverted internal limiting membrane (ILM) flap technique has recently been reported in a limited number of studies as an effective surgical technique for the management of large macular holes (MHs) with fair MH closure rates as well as gains in visual acuity.In the current study,longitudinal changes in multi-focal electroretinogram (mfERG) responses,best-corrected visual acuity (BCVA) and spectral-domain optical coherence tomography (SD-OCT) were evaluated in eyes with large MHs managed by this technique.Methods:A prospective noncontrolled interventional study of eight patients (eight eyes) with large MHs (minimum diameter 〉400 μm) was conducted.All MHs were treated with pars plana vitrectomy and indocyanine green-assisted inverted ILM flap technique.SD-OCT images were used to assess the anatomical outcomes of surgery while BCVA and mfERG were used to evaluate the functional outcomes during a 3-month follow-up.Results:All patients underwent successful intended manipulation and translocation of the ILM flap without flap dislocation and achieved complete anatomical closure.Partial microstructural reconstruction,demonstrated on SD-OCT as restoration of the external limiting membrane and the ellipsoid zone,was observed in all cases as early as 1 month after surgery.Functionally,as compared to baseline,all patients showed improvements in BCVA and all but one in mfERG response during follow-up.However,Pearson's test revealed no significant correlations between BCVA and mfERG responses of the fovea and of the macular area at each evaluation time point.Conclusions:Inverted ILM flap technique appeares to be a safe and effective approach for the management of large idiopathic MHs with favorable short-term anatomical and functional results.Postoperative reconstruction of the microstructure generally shows good consistency with improvements in both BCVA and mfERG response,of which the latter might be a supplement for the former in postoperative functional follow-up.展开更多
Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and gro...Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and ground is 5 ~ 8 m.In order to insure the safety of the upper buildings,technologies of parallel cut with large diameter empty hole,one-time initiation and delay by parts,and multiple shallow holes were adopted in the project.The results showed that the maximum value of vertical vibration was limited in the criterion allowance,and the upper buildings were not damaged.Besides,problems were solved that the number of nonel detonator was difficult to meet the requirements of excavating a large cross-section tunnel by blasting,multiple cross-section could’t be initiated simultaneously,and construction efficiency was low,which ensure the construction safety and schedule.展开更多
基金Supported by National Natural Science Foundation of China(NSFC)fund(No.81970815).
文摘●AIM:To introduce the macular hole(MH)hydromassage technique as a potentially beneficial approach for the treatment of large or persistent MH.●METHODS:This retrospective observational case series comprised 16 consecutive patients(17 eyes)diagnosed with MH.Inclusion criteria involved a hole aperture diameter larger than 600μm or the presence of an unclosed MH larger than 600μm following the previous vitrectomy.Standard MH repair procedures were administered in all cases,involving the manipulation and aspiration of the hole margin through the application of water flow with a soft-tip flute needle.A comprehensive assessment was conducted for each case before and after surgery,and optical coherence tomography(OCT)images were captured at every follow-up point.●RESULTS:The mean preoperative aperture diameter was 747±156μm(range 611-1180μm),with a mean base diameter of 1390±435μm(range 578-2220μm).Following surgery,all cases achieved complete anatomical closure of MH,with 13 cases(76.5%)exhibiting type 1 closure and 4 cases(23.5%)demonstrating type 2 closure.No significant differences were observed in the preoperative OCT variables between the two closure types.Eyes with type 1 closure showed a significantly improved visual acuity(0.70±0.10,range 0.50-0.80)compared to those with type 2 closure(0.90±0.12,range 0.80-1.00,P=0.014).●CONCLUSION:The MH hydromassage technique demonstrates promising results,achieving acceptable closure rates in cases of large or persistent MH.This technique may serve as an effective adjunctive maneuver during challenging MH surgery.
基金Financial supports are from the National Natural Science Foundation of China (No. 50874104)the Scientific Research Industrialization Project of Jiangsu Universities (No. JH07-023)
文摘Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.
文摘For plane singly-connected domains with insulating boundary and four point-sized contacts, C<sub>0</sub> …C<sub>3</sub>, van der Pauw derived a famous equation relating the two trans-resistances R<sub>01,23</sub>, R<sub>12,30</sub> with the sheet resistance without any other parameters. If the domain has one hole van der Pauw’s equation becomes an inequality with upper and lower bounds, the envelopes. This was conjectured by Szymański et al. in 2013, and only recently it was proven by Miyoshi et al. with elaborate mathematical tools. The present article gives new proofs closer to physical intuition and partly with simpler mathematics. It relies heavily on conformal transformation and it expresses for the first time the trans-resistances and the lower envelope in terms of Jacobi functions, elliptic integrals, and the modular lambda elliptic function. New simple formulae for the asymptotic limit of a very large hole are also given.
文摘Background:Inverted internal limiting membrane (ILM) flap technique has recently been reported in a limited number of studies as an effective surgical technique for the management of large macular holes (MHs) with fair MH closure rates as well as gains in visual acuity.In the current study,longitudinal changes in multi-focal electroretinogram (mfERG) responses,best-corrected visual acuity (BCVA) and spectral-domain optical coherence tomography (SD-OCT) were evaluated in eyes with large MHs managed by this technique.Methods:A prospective noncontrolled interventional study of eight patients (eight eyes) with large MHs (minimum diameter 〉400 μm) was conducted.All MHs were treated with pars plana vitrectomy and indocyanine green-assisted inverted ILM flap technique.SD-OCT images were used to assess the anatomical outcomes of surgery while BCVA and mfERG were used to evaluate the functional outcomes during a 3-month follow-up.Results:All patients underwent successful intended manipulation and translocation of the ILM flap without flap dislocation and achieved complete anatomical closure.Partial microstructural reconstruction,demonstrated on SD-OCT as restoration of the external limiting membrane and the ellipsoid zone,was observed in all cases as early as 1 month after surgery.Functionally,as compared to baseline,all patients showed improvements in BCVA and all but one in mfERG response during follow-up.However,Pearson's test revealed no significant correlations between BCVA and mfERG responses of the fovea and of the macular area at each evaluation time point.Conclusions:Inverted ILM flap technique appeares to be a safe and effective approach for the management of large idiopathic MHs with favorable short-term anatomical and functional results.Postoperative reconstruction of the microstructure generally shows good consistency with improvements in both BCVA and mfERG response,of which the latter might be a supplement for the former in postoperative functional follow-up.
文摘Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and ground is 5 ~ 8 m.In order to insure the safety of the upper buildings,technologies of parallel cut with large diameter empty hole,one-time initiation and delay by parts,and multiple shallow holes were adopted in the project.The results showed that the maximum value of vertical vibration was limited in the criterion allowance,and the upper buildings were not damaged.Besides,problems were solved that the number of nonel detonator was difficult to meet the requirements of excavating a large cross-section tunnel by blasting,multiple cross-section could’t be initiated simultaneously,and construction efficiency was low,which ensure the construction safety and schedule.