期刊文献+
共找到13篇文章
< 1 >
每页显示 20 50 100
The 2019 China Eco-civilization Construction·Guiyang Forum: A survey
1
作者 DENG Xiang 《Ecological Economy》 2019年第3期239-240,共2页
From July 13 to 14,the“2019 China Eco-Civilization Construction Forum”,jointly sponsored by Chinese Ecological Economics Association and the journal of Ecological Economy and hosted by School of Economics,Guizhou Un... From July 13 to 14,the“2019 China Eco-Civilization Construction Forum”,jointly sponsored by Chinese Ecological Economics Association and the journal of Ecological Economy and hosted by School of Economics,Guizhou University was held in Guiyang City,Guizhou Province.The theme of the conference is Ecological Economy and Rural Revitalization.About 150 experts and scholars from more than 100 universities and research institutions attended the forum.Experts and scholars attending the meeting conducted in-depth discussions and exchanges on the system and mechanism of eco-civilization construction in the new era,ecocivilization and social responsibility,ecological economics theory and green development,rural revitalization and ecological poverty alleviation,ecological environment and ecological industry,ecological protection and ecological compensation. 展开更多
关键词 A survey Guiyang FORUM China The 2019 China Eco-civilization construction
下载PDF
Applications of Pre-Geological Prediction in Tunnel Construction 被引量:1
2
作者 YANG Hui-jun WANG Meng-shu LIU Gao 《Journal of China University of Mining and Technology》 EI 2005年第3期203-207,共5页
Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainl... Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainlygeologic survey before and in excavation, to clarify their emphasis on PGP. At the same time, the technique is appliedto an engineering case, the longest highway tunnel in Gansu province. Data of geological survey of outside tunnels,sound wave detection, and geologic sketch for both tunnel face and sidewalls within the tunnel are analyzed. Afteranalyzing these data, long-term pre-geological prediction forecasting basic geological conditions of fault 4 such aslithology, scope, location, etc., and short-term and more accurate pre-geological prediction are reported. 展开更多
关键词 pre-geological prediction geologic survey tunnel construction
下载PDF
Rural Housing Construction Change and Driving Mechanism of Macheng City of Hubei Province in China
3
作者 董桥峰 郑斌 +1 位作者 林育敏 何中华 《Journal of Landscape Research》 2012年第6期20-23,26,共5页
By taking Macheng City as the research area, based on the questionnaire survey of peasants, a deep analysis has been conducted on the change of rural housing construction in the past 30 years. The results show that th... By taking Macheng City as the research area, based on the questionnaire survey of peasants, a deep analysis has been conducted on the change of rural housing construction in the past 30 years. The results show that there are many old houses in villages and it has a higher potential requirement for the improvement of rural housing condition; rural housing construction comes to its climax twice and presents to change in the shape of "N"; and primary factors affecting the size of rural house site by multicolinearity regression model contain annual net income of peasant household, land source of house site, reform of rural taxes and administrative charges, transport condition and comparison psychology. 展开更多
关键词 RURAL HOUSING construction survey Driving MECHANISM Macheng CITY
下载PDF
Using the Balanced Scorecard as a Strategic Management System in the Libyan Construction Industry
4
作者 Abdussalam Shibani Nawal Gherbal 《Management Studies》 2018年第1期1-19,共19页
Libya is a developing country that has a growing construction industry, however, the management of construction projects frequently experiences challenges with time and cost restraints and this affects the overall per... Libya is a developing country that has a growing construction industry, however, the management of construction projects frequently experiences challenges with time and cost restraints and this affects the overall performance of the project as well as the performance of the project managers. The main aim of this paper is to apply BSC in the Libyan construction industry and evaluate the factors that impact project manager performance and their ability to complete and deliver projects successfully in Libya. This study will ascertain the role of project managers, the challenges that project managers in Libya frequently encounter the cause of time and cost overruns within construction projects and the main factors for successful construction projects. This research adopted both quantitative and qualitative research methods. The findings are based upon 300 structured questionnaires distributed to general, project managers working on construction sectors in Libya (Tripoli). Completed questionnaires received were 183. This is a response rate of 61%. A statistical analysis was used to confirm and address the issues of reliability and validity of the questionnaire survey as a measuring instrument. In addition structured interviews with qualified project managers were used to confirm that the data collected were truly reflective. Upon the data analysis from the questionnaire survey and structured interview the project manager is the most important factor affecting the success of the project in construction industries Libya, furthermore project manager skills are important components that influence the performance of project manager. 展开更多
关键词 BSC Libya questionnaires survey construction industry qualitative research
下载PDF
Logistics Management in the Ghanaian Construction Industry
5
作者 Boateng Leslie Appiah 《World Journal of Engineering and Technology》 2021年第3期423-443,共21页
In the field of the construction industry, logistics management has become an issue of concern which needs to be focused on in order to ensure effective, successful and timely execution of projects in the construction... In the field of the construction industry, logistics management has become an issue of concern which needs to be focused on in order to ensure effective, successful and timely execution of projects in the construction industry. Logistics management in construction is a multidisciplinary process which makes sure things are done at the right time, cost and quality as well as material supply and handling, schedule control, site infrastructure and equipment location, site physical flow management, traffic arrangements on and around the construction site, and information management related to all physical and services flow. This paper seeks to identify and evaluate the possible factors that affect logistics management in the construction industry and also to ascertain the current practices of inventory management and the effect on logistics management envisage by construction personnel’s and stake holders. A descriptive survey research was conducted with both structured and unstructured questionnaire and administered both via e-mail and by sending questionnaire link onto a WhatsApp platform groups of the respondents, and out of the 187 respondents that took part in the survey, 22 respondents feedback were incomplete so 165 member respondents results were analyzed representing 88.2% response rate. The survey results were analyzed, displayed and interpreted in the form of tables, bar charts, column chart and pie chart with the use of SPSS software. The research survey respondents </span><span style="font-family:Verdana;">were </span><span style="font-family:Verdana;">comprised of Project Managers, Project Coordinators, Foremen, Site Managers/</span><span style="font-family:Verdana;"> </span><span style="font-family:Verdana;">Officers, Logistics Managers, Inventory Managers and Laborers. The survey results revealed that majority of the total respondents are in the capacity or position as Logistics Managers and also have from 5 to 10 years working experience, and as well majority of the respondents have also attained Master’s degree qualification. It was also revealed that logistics management is greatly affected by the inability or the failure to embrace, adopt and integrate new and emerging technology and its approach into the logistics management system. Majority of the respondents also indicated that in general the adequacy of inventory management system was dissatisfied representing 63.8% of the total respondents. The construction industry not only needed to improve its inventory management systems but also to ensure appropriate inventory management techniques for enhancing high degree of accuracy, reduced cycle times and replenishment of stock. This usually accounts for the poor delivery and quality of work, accompanied with delays and other associated losses in project construction. For effective Logistics management to be achieved in the construction industry, the introduction of modern technology to carry out logistics functions in the construction industry should be paramount to the industry players. 展开更多
关键词 Logistics Management construction Industry LOGISTICS Inventory Management survey Results
下载PDF
Survey and Countermeasures on Current Situation of Life Education for College Students in Local Normal Colleges and Universities
6
作者 Minzhang YU Fengqiu WANG Yunrong PU 《Asian Agricultural Research》 2023年第2期59-63,67,共6页
Life education is the precondition of all education.This paper explored the current situation of life education for college students in local normal colleges and universities through questionnaire survey,and traced th... Life education is the precondition of all education.This paper explored the current situation of life education for college students in local normal colleges and universities through questionnaire survey,and traced the history of life education in the world and China.Combined with history and reality,it analyzed the current problems of life education for college students mainly in three aspects,namely,the lack of connectivity in the educational process,the excessive productization of education,and the fragmentation of life education.Finally,it came up with pertinent recommendations in line with these problems. 展开更多
关键词 Life education College students Normal colleges and universities Course construction survey
下载PDF
Deformation,structure and potential hazard of a landslide based on InSAR in Banbar county,Xizang(Tibet)
7
作者 Guan-hua Zhao Heng-xing Lan +4 位作者 Hui-yong Yin Lang-ping Li Alexander Strom Wei-feng Sun Chao-yang Tian 《China Geology》 CAS CSCD 2024年第2期203-221,共19页
The Tibetan Plateau is characterized by complex geological conditions and a relatively fragile ecological environment.In recent years,there has been continuous development and increased human activity in the Tibetan P... The Tibetan Plateau is characterized by complex geological conditions and a relatively fragile ecological environment.In recent years,there has been continuous development and increased human activity in the Tibetan Plateau region,leading to a rising risk of landslides.The landslide in Banbar County,Xizang(Tibet),have been perturbed by ongoing disturbances from human engineering activities,making it susceptible to instability and displaying distinct features.In this study,small baseline subset synthetic aperture radar interferometry(SBAS-InSAR)technology is used to obtain the Line of Sight(LOS)deformation velocity field in the study area,and then the slope-orientation deformation field of the landslide is obtained according to the spatial geometric relationship between the satellite’s LOS direction and the landslide.Subsequently,the landslide thickness is inverted by applying the mass conservation criterion.The results show that the movement area of the landslide is about 6.57×10^(4)m^(2),and the landslide volume is about 1.45×10^(6)m^(3).The maximum estimated thickness and average thickness of the landslide are 39 m and 22 m,respectively.The thickness estimation results align with the findings from on-site investigation,indicating the applicability of this method to large-scale earth slides.The deformation rate of the landslide exhibits a notable correlation with temperature variations,with rainfall playing a supportive role in the deformation process and displaying a certain lag.Human activities exert the most substantial influence on the spatial heterogeneity of landslide deformation,leading to the direct impact of several prominent deformation areas due to human interventions.Simultaneously,utilizing the long short-term memory(LSTM)model to predict landslide displacement,and the forecast results demonstrate the effectiveness of the LSTM model in predicting landslides that are in a continuous development and movement phase.The landslide is still active,and based on the spatial heterogeneity of landslide deformation,new recommendations have been proposed for the future management of the landslide in order to mitigate potential hazards associated with landslide instability. 展开更多
关键词 LANDSLIDE INSAR Human activity DEFORMATION STRUCTURE LSTM model Engineering construction Thickness Neural network Machine learning Prediction and prevention Tibetan Plateau Geological hazards survey engineering
下载PDF
A Survey of Steel Arch Bridges in China 被引量:4
8
作者 Baochun Chen Kangming Chen +1 位作者 Shozo Nakamura Qiu Zhao 《Journal of Civil Engineering and Architecture》 2011年第9期799-808,共10页
A review of the current status and progress of steel arch bridges in China is presented in this paper. The existing steel arch bridges in China were analyzed in terms of steel material, span, structure type, main arch... A review of the current status and progress of steel arch bridges in China is presented in this paper. The existing steel arch bridges in China were analyzed in terms of steel material, span, structure type, main arch rib form and construction method. The comparison with CFST arch bridges and RC arch bridges is also conducted. It is shown that steel arch bridge has gain rapid development in China since 2000, characterized by long main spans. As for the span, most of the steel arch bridges have a span less than 250 m, while when the span exceeds 350 m, steel arch bridges are strongly competitive against CFST or RC arch bridges. Over 80% of the bridges are through and half-through bridge types, and the arch ribs are hingeless structures. The rise-to-span ratios of the arches are mainly between 1:4 and 1: 5. Most of the arches use solid box ribs, and a small portion of arches use truss ribs in which box sections are mostly adopted for the truss members. The cantilever method and scaffolding method are the two main construction methods used, but some other construction methods have also been developed. 展开更多
关键词 Steel arch bridge survey bridge type RIB construction method China
下载PDF
Image Instrument Construct Validation of University Institutions
9
作者 Omar A. Flores Laguna Karla S. Basurto Gutierrez Karla L. Haro-Zea 《Journal of Modern Accounting and Auditing》 2017年第11期483-492,共10页
The main purpose of this study was to determine the validation of construct and reliability of the image instrument in educational institutions. A non-random sample selection of 314 high school students from Montemore... The main purpose of this study was to determine the validation of construct and reliability of the image instrument in educational institutions. A non-random sample selection of 314 high school students from Montemorelos, Nuevo Leon was made. An instrument with 25 statements was created to measure the image of The University of Montemorelos (reliability a = 0.956). The methodologies that were utilized in the validation were factorial analysis and confirmatory analysis, with the latter made with structural equations. In the factorial analysis, it was observed that the statements were grouped into four dimensions, as it was initially planned. With the exception of one item, all the other statements were grouped in the proposed dimension. In the confirmatory validation utilizing structural equations, all the selected criteria were fulfilled. 展开更多
关键词 IMAGE survey validation educational institutions STUDENTS construct validation confirmatory validation factorial analysis
下载PDF
A Case Study for End of Life Reuse and Recycling Survey Methodologies: The Hollentalanger Cottage
10
作者 Annette Hafner Stephan Ott +1 位作者 Eva Bodemer Stefan Winter 《Journal of Civil Engineering and Architecture》 2014年第10期1211-1220,共10页
Up to now, reuse and recycling of existing buildings have not been examined widely. This paper discusses the theories, methods and practicalities of buildings' end of life with a main focus on planning and managing r... Up to now, reuse and recycling of existing buildings have not been examined widely. This paper discusses the theories, methods and practicalities of buildings' end of life with a main focus on planning and managing reuse and recycling of existing buildings. Our aim is the realistic modelling of theoretical scenarios for end of life based on a case study. The methods of building survey, material classification and documentation for reuse, recycling and disposal of existing constructions are presented. Investigations and calculations were done on an existing cottage in the Alps. The ecologically most beneficial disposal phase of the old wooden hut is our main objective. Critical questions arise from the quality of the material and how it can be extracted, separated and balanced in an appropriate way. A systematic survey of the building by inspection of constructions and materials in iterative steps allows a detailed material balance with condition and property information. This information is crucial for scenarios and material flow analysis of demolished and rebuilt building in environmental system analysis. For future planning, the reuse and recycling of existing buildings should be integrated quite early in the planning process so that we can use the materials in the best way. 展开更多
关键词 Life cycle end of life REUSE RECYCLING material flow building survey construction inspection material analysis.
下载PDF
The Human Role in Constructing Settlement Patterns and Landscapes:A Caution Based on Systematic Archaeological Survey in Coastal Shandong Province,China
11
作者 Gary M.Feinman Linda M.Nicholas Fang Hui 《东方考古》 2016年第1期1-15,共15页
Introduction The recent advances in archaeobotany that have fostered our understanding of agricultural origins and variable crop regimes across Neolithic and Bronze Age Eastern Asia represent major contributions for w... Introduction The recent advances in archaeobotany that have fostered our understanding of agricultural origins and variable crop regimes across Neolithic and Bronze Age Eastern Asia represent major contributions for which we applaud our colleagues who have presented their discoveries and results at this conference.These findings help us see how early villagers in this part of the world constructed diverse niches that they inhabited thousands of years ago. 展开更多
关键词 constructING SETTLEMENT PATTERNS Landscapes survey
原文传递
Reliability and validity of the public innovation Hexagon(PIH)as applied to the Spanish social services
12
作者 Jaime Minguijon Cecilia Serrano-Martínez Esther Raya-Diez 《International Journal of Innovation Studies》 2024年第3期237-248,共12页
Social services are a protection system that seeks to assist people throughout their lives.Innovation is essential for enabling us to respond to the problems that society is currently facing and to adapt to our changi... Social services are a protection system that seeks to assist people throughout their lives.Innovation is essential for enabling us to respond to the problems that society is currently facing and to adapt to our changing world.This paper validates an instrument based on the Public Innovation Hexagon(PIH),for measuring the degree to which an innovation culture is being implemented in the Spanish social services system.A sample group of social services professionals were asked to complete a questionnaire based on the variables that make up the PIH model.After our initial validation of the PIH model,we reduced the 42 initial items to 32,while maintaining the initial six dimensions.The objective was to eliminate redundant items and ensure that the resulting end model was more solid and reliable.The new improved model(PIHn)that we created achieved greater consistency with a smaller number of items while maintaining the initial six dimensions. 展开更多
关键词 Organizational innovation INNOVATION Intra-organizational relations Organizational culture survey construction and analysis
原文传递
HEAVY ION RESEARCH FACILITY AT LANZHOU (HIRFL)
13
作者 魏宝文 叶峰 +3 位作者 张恩厚 马受武 白国良 乔庆文 《Chinese Science Bulletin》 SCIE EI CAS 1989年第13期1057-1060,共4页
As the further development of heavy ion physics requires much modern facilities, the possibility of building a new heavy ion research facility in Lanzhou (HIRFL) was therefore surveyed. The idea of using the existing ... As the further development of heavy ion physics requires much modern facilities, the possibility of building a new heavy ion research facility in Lanzhou (HIRFL) was therefore surveyed. The idea of using the existing cyclotron converted to 1.7m sector focusing cyclotron (SFC) as the injector and constructing a new separated sec- 展开更多
关键词 facilities sector FACILITY LANZHOU surveyed constructing POSSIBILITY focusing converted SEPARATED
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部