期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Risk evaluation for the task transfer of an aircraft maintenance program based on a multielement connection number
1
作者 Tao LIU Zhibo SHI +2 位作者 Huifen DONG Jie BAI Yu YAN 《Frontiers of Engineering Management》 CSCD 2024年第1期16-31,共16页
This paper proposes a framework for evaluating the efficacy and suitability of maintenance programs with a focus on quantitative risk assessment in the domain of aircraft maintenance task transfer. The analysis is anc... This paper proposes a framework for evaluating the efficacy and suitability of maintenance programs with a focus on quantitative risk assessment in the domain of aircraft maintenance task transfer. The analysis is anchored in the principles of Maintenance Steering Group-3 (MSG-3) logic decision paradigms. The paper advances a holistic risk assessment index architecture tailored for the task transfer of maintenance programs. Utilizing the analytic network process (ANP), the study quantifies the weight interrelationships among diverse variables, incorporating expert-elicited subjective weighting. A multielement connection number-based evaluative model is employed to characterize decision-specific data, thereby facilitating the quantification of task transfer-associated risk through the appraisal of set-pair potentials. Moreover, the paper conducts a temporal risk trend analysis founded on partial connection numbers of varying orders. This analytical construct serves to streamline the process of risk assessment pertinent to maintenance program task transfer. The empirical component of this research, exemplified through a case study of the Boeing 737NG aircraft maintenance program, corroborates the methodological robustness and pragmatic applicability of the proposed framework in the quantification and analysis of mission transfer risk. 展开更多
关键词 risk evaluation maintenance steering group analytic network process task transfer maintenance program
原文传递
Dedicated Services Guarantee Owner Satisfaction-Lexus launches Summer Refreshing vehicle maintenance program
2
《Beijing Review》 2011年第28期42-42,共1页
Lexus’After-sales Services upgrade:From July 1 to August 31,Lexus introduces the Summer Refreshing vehicle maintenance program to owners across China.
关键词 Dedicated Services Guarantee Owner Satisfaction-Lexus launches Summer Refreshing vehicle maintenance program VIP
原文传递
Development and Application of Maintenance Template in Pressurized Water Reactor Nuclear Power Plant 被引量:2
3
作者 张圣 陈宇 +1 位作者 曹智鹏 莫春铌 《Journal of Donghua University(English Edition)》 EI CAS 2015年第1期162-165,共4页
Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and econom... Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and economic operation for nuclear power plants( NPPs) especially for a large number of nuclear powers under construction. Based on the development and application of maintenance template in developed countries,and combining with reliability-centered maintenance( RCM) analysis results and maintenance experience data over the past ten years in domestic NPPs, the development process of maintenance template was presented for Chinese pressurized water reactor( PWR) NPP,and the application of maintenance template to maintenance program development and maintenance optimization combined with cases were demonstrated. A shortcut was provided for improving the efficiency of maintenance optimization in domestic PWR NPP,and help to realize a safe,reliable,and economic operation for domestic NPPs. 展开更多
关键词 pressurized water reactor(PWR) nuclear power plant maintenance template maintenance program maintenance optimization
下载PDF
Reliability-Centered Maintenance-Based Maintenance Decision in New Nuclear Power Plants
4
作者 黄立军 陈宇 +1 位作者 马沂荩 吴进 《Journal of Donghua University(English Edition)》 EI CAS 2016年第2期248-251,共4页
Taking the project of introducing reliability-centered maintenance( RCM) into maintenance decision in an AP1000 nuclear power plant( NPP) under construction as the research object,an improved RCM methodology was propo... Taking the project of introducing reliability-centered maintenance( RCM) into maintenance decision in an AP1000 nuclear power plant( NPP) under construction as the research object,an improved RCM methodology was proposed, and the application software and an RCM-based maintenance strategies management system were designed. In the pilot project,the RCMbased maintenance decision methodology had been applied to determining the maintenance strategies for two systems. Both the decision process and the results were described in this paper. The achievements of this project promoted the introduction and routinization of an advanced and effective maintenance decision mode in nuclear power field,which could provide valuable reference for new NPPs in China. 展开更多
关键词 reliability-centered maintenance(RCM) maintenance strategy maintenance decision maintenance program nuclear power plant(NPP)
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部