期刊文献+
共找到1,899篇文章
< 1 2 95 >
每页显示 20 50 100
Analysis of Existing Problems with Management of Construction Projects Bidding and Solutions to the Problems
1
作者 Meili Wu 《Journal of Architectural Research and Development》 2021年第2期30-33,共4页
Bidding is a key link during the implementation of a construction project.For the same construction project,there are usually multiple construction companies bidding together to obtain the right to contract for the pr... Bidding is a key link during the implementation of a construction project.For the same construction project,there are usually multiple construction companies bidding together to obtain the right to contract for the project.However,there are still various irregularities in the bidding stage.This article analyzed the above problems and proposed a management strategy for the optimization of bidding,looking forward to improving the quality of bidding management of construction projects,solving various illegal bidding problems,and purifying the environment of bidding management. 展开更多
关键词 Construction engineering bidding management PROBLEMS SOLUTIONS
下载PDF
Application Research on Big Data in Material Bidding and Procurement Management
2
作者 Ze Zhou 《Journal of Finance Research》 2018年第2期23-26,共4页
The 21st century is an era of rapid development of informatization.Under the background of the development of this era,people are increasingly researching the application of information technology.The application of b... The 21st century is an era of rapid development of informatization.Under the background of the development of this era,people are increasingly researching the application of information technology.The application of big data technology is the development and application trend of an information technology formed after the rapid development of modem information technology.Big data technology has been applied to the development of many industries,including the material bidding and procurement management as well.With the aid of scientific analysis of big data,it is possible to help material procurement management to analyze the corresponding bidding procurement information,which is an important guarantee for improving its bidding procurement management capabilities.In view of this,this article has conducted special research on the application of big data in material bidding and procurement management,hoping to provide references for the application of big data technology in material bidding and procurement management with the help of the research in this article. 展开更多
关键词 BIG DATA MATERIAL bidding Procurement management APPLIED research
下载PDF
Construction Project Bidding Agency and Cost Management Strategy in Bidding Stage
3
作者 Heyan Fu 《Journal of Architectural Research and Development》 2022年第3期21-26,共6页
In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified cha... In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified characteristic.The cost management of a construction project bidding stage has a dynamic characteristic.The bidding agency can provide bidding related business for the construction enterprises to ensure the quality and the effect of the bidding service,leading to the foundation for the sustainable development of the construction enterprises.This paper analyzes the deficiency in the bidding agency,and cost management in the bidding stage of the construction projects,as well provide some effective countermeasures or recommendation,to improve the value,and the role of the bidding agency in managing and controlling the construction project cost within the scope allowed by the law,and regulations,and also to ensure the comprehensive benefits of construction projects for the construction enterprise. 展开更多
关键词 Architectural engineering bidding agency Cost management
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
4
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF
Construction of the“Micro-Ideological and Political”Model for Ideological and Political Teaching Reform in Bidding and Contract Management Courses
5
作者 Dongchun Xia 《Journal of Contemporary Educational Research》 2024年第11期326-332,共7页
In the context of deepening educational reforms,the significance of ideological and political education has become increasingly prominent,emerging as a crucial aspect of enhancing students’comprehensive qualities.To ... In the context of deepening educational reforms,the significance of ideological and political education has become increasingly prominent,emerging as a crucial aspect of enhancing students’comprehensive qualities.To ensure the orderly progress of ideological and political education in courses,it is essential to actively promote the integration of ideological and political elements within coursework.This integration aims to align professional course education with ideological and political education,fostering a collaborative educational model.Therefore,in the teaching of bidding and contract management courses,constructing a“micro-ideological and political”teaching model has emerged as a critical component.The implementation of this model facilitates the seamless integration of bidding and contract management coursework with ideological and political education,thereby elevating the teaching quality of these courses.Additionally,it leverages the synergistic role of coursework and ideology in educating students,ultimately enhancing the quality and level of talent cultivation.Hence,this paper proposes strategies for constructing a“microideological and political”model within the context of ideological and political teaching reforms in bidding and contract management courses,inviting discussion and exchange on this topic. 展开更多
关键词 bidding and contract management courses Ideological and political elements “Micro-ideological and political”model
下载PDF
China Won the Bidding for Managing the Second Giant Oilfield of Kazakhstan
6
《China Oil & Gas》 CAS 1997年第3期174-174,共1页
关键词 China Won the bidding for Managing the Second Giant Oilfield of Kazakhstan
下载PDF
Distributed trusted demand response bidding mechanism empowered by blockchain
7
作者 Lei Wang Tong Li +3 位作者 Chao Yang Jiang Chen Yang Liu Shuai Ren 《Intelligent and Converged Networks》 EI 2024年第3期181-191,共11页
In the demand response process involving multi-agent participation,multiple parties’interests are involved and response execution status supervision is required.Traditional centralized demand response systems lack tr... In the demand response process involving multi-agent participation,multiple parties’interests are involved and response execution status supervision is required.Traditional centralized demand response systems lack trust attributes.At the same time,traditional centralized cloud management can no longer support massive terminal services,resulting in delays in demand response services.We build a distributed trusted demand response architecture based on blockchain,illustrating the information interaction process in the demand bidding process and container-based edge-side heterogeneous resource management.We also propose a demand bidding algorithm that takes into account both the day-ahead market and the intraday market,aiming to maximize the aggregator’s benefits.In addition,a virtual resource management algorithm to support demand response tasks is also proposed to optimize computing resource allocation and meet business latency requirements.Simulation results demonstrate that compared with only cloud computing or edge computing,the solution we proposed can reduce response delay by more than 39% for the sample system.Energy cost is saved by about 10.25%during container scheduling. 展开更多
关键词 demand response blockchain edge and cloud computing demand bidding virtual resource management
原文传递
基于零库存目标的体外诊断试剂供应链质量评价与改进研究 被引量:1
8
作者 吴函 徐智勇 +4 位作者 高小坤 葛文俊 马宪礼 丁蔚 李伟政 《中国医学装备》 2024年第2期127-131,161,共6页
目的:制定体外诊断试剂供应链的零库存管理目标,评价供应链质量,改进试剂供应中存在的问题。方法:从体外诊断试剂的库存量、供应效率和产品质量方面分析体外诊断试剂管理中存在的问题,制定医院运营、管理质量和患者利益最优化的管理体系... 目的:制定体外诊断试剂供应链的零库存管理目标,评价供应链质量,改进试剂供应中存在的问题。方法:从体外诊断试剂的库存量、供应效率和产品质量方面分析体外诊断试剂管理中存在的问题,制定医院运营、管理质量和患者利益最优化的管理体系,构建零库存管理路径和质量评价模型。选取2020年1月至2023年3月江苏省苏北人民医院采购的21种类型85个型号的体外诊断试剂,根据供应链质量管理方式不同,分别采用按需库存管理模式(模式1)和零库存管理模式(模式2),对比两种管理模式的需求采购、库存管理和临床使用效果。结果:采用模式2管理方式的体外诊断试剂的采购需求达标率、供应能力优质率和临床使用匹配度分别为(93.35±3.62)%、(94.87±2.63)%和(96.08±2.31)%,均高于模式1,其差异有统计学意义(Z=2.489、2.836、2.838,P<0.05),存产品长期积压、环境不达标和信息不及时的例数分别为(2.92±2.54)例、(2.83±1.59)例和(5.58±3.12)例,均低于模式1,其差异有统计学意义(Z=2.959、3.037、3.703,P<0.05);临床科室、医技科室及采购中心对模式2的体外诊断试剂的供应配送和信息沟通的满意度分别为97.8%和93.3%、97.0%和87.9%、100%和84.6%,均高于模式1,其差异有统计学意义(χ^(2)_(临床科室)=5.428、6.133,χ^(2)_(医技科室)=3.958、3.937,χ^(2)_(采购中心)=5.159、4.996,P<0.05)。结论:零库存管理模式能够提高体外诊断试剂需求采购的规范性,降低库存管理中积压失效问题的发生率,提升临床供应服务质量。 展开更多
关键词 零库存管理 体外诊断试剂 供应链 招标采购 库房管理
下载PDF
融合行业信息案例的“建设工程招投标与合同管理实务”课程改革探究
9
作者 王冠 《吉林省教育学院学报》 2024年第8期14-18,共5页
作为工程管理类专业中必修的专业课程,“建设工程招投标与合同管理实务”知识在各大工程项目中都有所应用。但由于此课程天然存在知识驳杂、文本量大、理论多、政策更新快等特征,因此在实践教学中该课程的教学难度很大,学生的学习兴趣... 作为工程管理类专业中必修的专业课程,“建设工程招投标与合同管理实务”知识在各大工程项目中都有所应用。但由于此课程天然存在知识驳杂、文本量大、理论多、政策更新快等特征,因此在实践教学中该课程的教学难度很大,学生的学习兴趣也相对较差。本文围绕将行业信息案例融合“建设工程招投标与合同管理实务”课程的具体方法进行探讨分析,意在借用职业资格考试的教学内容,解决传统教材更新较慢的问题,并拓展教师的知识储备,借助行业真实工作案例,利用信息技术创建工程招投标案例数据库,为教学过程提供更多实践机会,研究表明,该方法对于学生的课堂表现和最终成绩都有着良好的效果,具备大范围推广的条件。 展开更多
关键词 行业信息案例 建设工程招投标与合同管理实务 课程改革
下载PDF
基于闭环双向对标管理模式的医疗设备临床配置路径优化研究 被引量:1
10
作者 张梦圆 邓迎敏 +4 位作者 张妍妍 程丽 谷中慧 贾利民 伍洪 《中国医学装备》 2024年第4期145-150,共6页
目的:基于双闭环工作路径构建闭环双向对标管理模式,提高医疗设备临床配置水平。方法:构建招标采购和临床使用的闭环双向对标管理指标体系,采用奇异值分解算法选取标杆,形成双向对标管理模式。选取2018年6月至2022年5月解放军总医院采购... 目的:基于双闭环工作路径构建闭环双向对标管理模式,提高医疗设备临床配置水平。方法:构建招标采购和临床使用的闭环双向对标管理指标体系,采用奇异值分解算法选取标杆,形成双向对标管理模式。选取2018年6月至2022年5月解放军总医院采购的357台医疗设备,包括医用电子仪器、手术室设备、医学检验仪器、生命支持设备、医学影像设备及其他医疗设备,分别采用专家论证管理模式(165台)和闭环双向对标管理模式(192台)进行设备临床配置管理,对比两种配置管理模式的医疗设备临床配置管理效果。结果:采用闭环双向对标管理模式的医用电子仪器、手术室设备、医学检验仪器、生命支持设备、医学影像设备及其他医疗设备的临床配置管理评估值分别为(0.86±0.07)、(0.87±0.05)、(0.88±0.05)、(0.84±0.07)、(0.87±0.04)和(0.85±0.05),均高于专家论证管理模式,其差异有统计学意义(t=2.564、3.228、4.641、2.719、2.774、3.490,P<0.05);医疗设备采购失败率和管理成本增幅分别为(2.78±1.97)%和(0.98±0.70)%,低于专家论证管理模式,其差异有统计学意义(t=3.322、2.538,P<0.05);医疗设备验收通过率和开机运转率分别为(98.10±2.68)%和(91.54±4.76)%,均高于专家论证管理模式,其差异有统计学意义(t=3.470、2.125,P<0.05)。医院设备采购及使用相关工作人员对采用闭环双向对标管理模式的医疗设备配置流程合理性、制度规范性和质量有效性满意度分别为98.75%、93.75%和100%,均高于专家论证管理模式,其差异有统计学意义(x^(2)=5.769、4.006、6.234,P<0.05)。结论:闭环双向对标管理模式能够使配置的医疗设备更好地满足临床科室需求,最大化地应用于疾病诊疗和科研教学,提高招标采购和运行管理的规范性。 展开更多
关键词 闭环路径 对标管理 临床配置 招标采购 运行效益
下载PDF
基于“虚拟碳储存”的需求侧电-碳耦合交易机制
11
作者 华昊辰 辛世禹 +4 位作者 陈星莺 余昆 刘迪 丁一 沈俊 《中国电机工程学报》 EI CSCD 北大核心 2024年第6期2131-2143,I0004,共14页
“双碳”目标指引下,电力系统低碳转型势在必行。结合时变价格信号的低碳需求响应可以引导用户调整用电行为降低碳排放。然而,不同用户灵活性差异较大,仅通过价格信号的变化难以引导低灵活性用户实现碳减排;同时,部分高灵活性用户的调... “双碳”目标指引下,电力系统低碳转型势在必行。结合时变价格信号的低碳需求响应可以引导用户调整用电行为降低碳排放。然而,不同用户灵活性差异较大,仅通过价格信号的变化难以引导低灵活性用户实现碳减排;同时,部分高灵活性用户的调节潜力并未被完全释放。为了通过用户间碳排放责任的交易进一步释放需求侧的碳减排潜力,该文提出需求侧电-碳耦合交易机制,旨在通过碳排放责任的再分配进一步释放高灵活性用户的碳减排潜力。但根据比例共享定理,碳排放责任与用电量成固定比例,限制其在用户间的灵活转移,提出“虚拟碳储存”,使储能中电的碳排放强度成为可控变量,实现碳排放责任在用户间的自由转移。以地区电力系统为研究场景,综合考虑电费成本、碳排放成本以及负荷调节成本,引入近端策略优化算法求解用户的最佳用电策略。仿真结果显示,相比用户仅参与传统电力市场,参与电-碳耦合市场并考虑“虚拟碳储存”,可减少31.9%的碳排放,同时显著降低了用户用电成本。 展开更多
关键词 电-碳耦合交易 投标/报价策略 需求侧管理 虚拟碳储存
下载PDF
工程招投标存在的问题及对策 被引量:1
12
作者 徐国产 高菁 《工程技术研究》 2024年第3期158-160,共3页
在建设项目管理中,招投标管理工作是一项十分重要的内容,如果在招投标过程中出现了问题,势必影响工程建设质量。文章通过分析工程招投标的意义及存在的问题,探讨了工程招投标问题的对策,如完善招投标管理相关法律法规、严格规范招投标... 在建设项目管理中,招投标管理工作是一项十分重要的内容,如果在招投标过程中出现了问题,势必影响工程建设质量。文章通过分析工程招投标的意义及存在的问题,探讨了工程招投标问题的对策,如完善招投标管理相关法律法规、严格规范招投标工作程序、夯实建设单位招投标管理工作基础等,以推进建设项目招投标工作的规范化和科学化开展,更好地服务于建设单位。 展开更多
关键词 工程招投标 招投标管理 招投标制度 建设项目
下载PDF
安徽省公共资源交易开评标现场管理标准化研究与应用
13
作者 侯晓丽 张靖 +1 位作者 舒方玲 吴倩 《中国标准化》 2024年第3期102-105,共4页
开标、评标环节是公共资源交易活动的核心,也是体现公共资源交易效率和公平性的重要内容,一直备受社会关注。本文在深入分析安徽省公共资源交易标准化服务现状的基础上,探讨了公共资源交易开评标现场管理过程中,运用标准化的形式对实践... 开标、评标环节是公共资源交易活动的核心,也是体现公共资源交易效率和公平性的重要内容,一直备受社会关注。本文在深入分析安徽省公共资源交易标准化服务现状的基础上,探讨了公共资源交易开评标现场管理过程中,运用标准化的形式对实践工作的先进经验进行提炼固化的问题。提出对开评标现场管理的规范化、标准化建设的基本要求,明确现场管理内容,促进公共资源交易现场管理的标准化水平提升,为公共资源交易服务提质增效起到重要支撑作用。 展开更多
关键词 公共资源交易 开评标现场管理 标准化
下载PDF
大数据背景下建筑工程招投标管理信息化思考 被引量:1
14
作者 徐冬梅 《智能建筑与智慧城市》 2024年第5期93-95,共3页
文章从大数据背景下建筑工程招投标管理信息化的角度出发,分析了其存在的问题和对策建议。在数据质量问题方面,建议加强数据清洗和规范数据采集流程;在数据分析技能不足方面,建议增加数据分析人员和提供专业培训;在难以集成不同系统方面... 文章从大数据背景下建筑工程招投标管理信息化的角度出发,分析了其存在的问题和对策建议。在数据质量问题方面,建议加强数据清洗和规范数据采集流程;在数据分析技能不足方面,建议增加数据分析人员和提供专业培训;在难以集成不同系统方面,建议使用API进行系统集成和建立统一的数据交换平台;在数据安全风险方面,建议加强数据保护和规范数据访问权限。 展开更多
关键词 建筑工程 招投标 信息化管理 大数据
下载PDF
基于工程总承包计价规范的招标投标管理探讨 被引量:2
15
作者 郑志 戴冬爱 《工程造价管理》 2024年第1期74-80,共7页
《建设项目工程总承包计价规范》(T/CCEAS 001-2022,以下简称《计价规范》)的发布实施,进一步完善了工程总承包模式计价计量规则,编制了适应工程总承包模式的计价与计量规则。文章从《计价规范》提出区别于施工总承包的多项管理规则入手... 《建设项目工程总承包计价规范》(T/CCEAS 001-2022,以下简称《计价规范》)的发布实施,进一步完善了工程总承包模式计价计量规则,编制了适应工程总承包模式的计价与计量规则。文章从《计价规范》提出区别于施工总承包的多项管理规则入手,研究如何在招标投标阶段将工程总承包模式的选择、招标范围的选择、合同形式的选择、发包人需求的编写、投资控制目标的确定及费用的组成等落实在招标策划、招标文件编制及合同专用条件设置等招标投标管理的重要工作中,思考如何从发承包源头开始,运用《计价规范》去规范工程总承包模式的计价行为,在招标投标阶段将主要计价规则与既有招标文件及合同的示范文本进行适配,对发承包双方的合同履约风险进行预控,减少合同纠纷,以推动工程总承包模式健康有序发展。 展开更多
关键词 工程总承包 计价规范 招标投标管理 EPC模式 DB模式
下载PDF
建筑工程招投标管理的风险及预防策略分析 被引量:1
16
作者 杨中平 《市场周刊》 2024年第18期65-68,共4页
随着建筑工程招投标手段的多样化,滋生如串标、弄虚作假等工程招标乱象,需要市场对其进行引导和规范,以防范招投标管理的风险,维护建筑市场的秩序。文章从建筑工程企业招投标风险管理的基本概念出发,引入全生命周期管理理念,从事前的预... 随着建筑工程招投标手段的多样化,滋生如串标、弄虚作假等工程招标乱象,需要市场对其进行引导和规范,以防范招投标管理的风险,维护建筑市场的秩序。文章从建筑工程企业招投标风险管理的基本概念出发,引入全生命周期管理理念,从事前的预备阶段到事中的实施阶段,再到后期的定标阶段,逐环节分析其中的风险表现;并根据实践调查简单介绍招投标管理风险发生的原因,同时提出针对性的风险预防手段,促进建筑工程的招投标规范化发展。 展开更多
关键词 建筑工程 招投标管理 风险管理
下载PDF
国有企业招投标合规管理研究
17
作者 孙若萱 江哲 +1 位作者 赵倩 顾向一 《市场周刊》 2024年第2期24-27,共4页
招投标作为国有企业重要的经营活动之一,也是违规行为多发的领域,有必要重点加强合规管理。国有企业招投标常见的违规情形包括规避招标、相互串通、违规组建或调整评标委员会等。因此,国有企业需要健全招投标规定,加强人员培训;政府要... 招投标作为国有企业重要的经营活动之一,也是违规行为多发的领域,有必要重点加强合规管理。国有企业招投标常见的违规情形包括规避招标、相互串通、违规组建或调整评标委员会等。因此,国有企业需要健全招投标规定,加强人员培训;政府要加大指导和监管力度,以提高国有企业招投标合规管理水平,助力国有企业规范经营。 展开更多
关键词 国有企业 招投标 合规管理
下载PDF
房屋建筑工程招投标管理提升对策研究 被引量:1
18
作者 杨洁 《建筑与装饰》 2024年第2期87-89,共3页
随着我国经济的飞速发展,各行各业都进入高速发展时期,房屋建筑领域也不例外。而招投标作为建筑工程的前期环节,至关重要,尤其是对于国有资金投资项目,招投标制度能维护公平公正的建筑市场竞争环境,合理有效地选择参建单位,保证国有资... 随着我国经济的飞速发展,各行各业都进入高速发展时期,房屋建筑领域也不例外。而招投标作为建筑工程的前期环节,至关重要,尤其是对于国有资金投资项目,招投标制度能维护公平公正的建筑市场竞争环境,合理有效地选择参建单位,保证国有资金的使用效果。基于此,本文站在国有资金建设项目的立场上,深入研究安置楼、保障房等房屋建筑工程招投标现状及存在问题,就招投标管理工作提出新的改进策略,以供参考。 展开更多
关键词 房屋建筑工程 国有资金项目 招投标管理
下载PDF
建筑工程全过程造价管理与控制措施分析 被引量:1
19
作者 王琼 《工程技术研究》 2024年第5期144-146,共3页
文章围绕全过程造价管理进行研究,分析了全过程造价管理的管理阶段划分标准和组织协调要求。从前期决策、工程设计、招投标、现场施工四个环节入手,阐述了全过程造价管理模式在建筑工程中的应用路径,并提出多项行之有效的控制措施,旨在... 文章围绕全过程造价管理进行研究,分析了全过程造价管理的管理阶段划分标准和组织协调要求。从前期决策、工程设计、招投标、现场施工四个环节入手,阐述了全过程造价管理模式在建筑工程中的应用路径,并提出多项行之有效的控制措施,旨在增强造价控制效果,将全过程造价管理与控制措施全面落到实处。 展开更多
关键词 建筑工程 全过程造价管理 前期决策 工程设计 招投标 现场施工
下载PDF
建筑施工企业完善投标管理工作的研究
20
作者 曹君 《建筑施工》 2024年第4期608-610,共3页
为了完善建筑施工企业的经营投标工作,确保企业稳步发展,对目前建筑施工企业投标管理的现状和普遍存在的问题进行了分析。在对经营投标的相关经验和教训进行总结的基础上,对完善经营投标管理工作进行探讨并提供了一些措施、建议和设想,... 为了完善建筑施工企业的经营投标工作,确保企业稳步发展,对目前建筑施工企业投标管理的现状和普遍存在的问题进行了分析。在对经营投标的相关经验和教训进行总结的基础上,对完善经营投标管理工作进行探讨并提供了一些措施、建议和设想,以期在后续的经营投标工作中为施工企业稳固发展奠定坚实的基础。 展开更多
关键词 建筑施工企业 经营投标 风险管理 标书编制
下载PDF
上一页 1 2 95 下一页 到第
使用帮助 返回顶部