期刊文献+
共找到202篇文章
< 1 2 11 >
每页显示 20 50 100
Research on Financial Risk Management in the S Water Conservancy Project and Its Implications for Similar Projects
1
作者 Yunxi Cui Maoyuan Li 《Proceedings of Business and Economic Studies》 2024年第6期213-219,共7页
As a vital infrastructure initiative with significant impacts on national development and public welfare,water conservancy projects play an essential role in advancing agricultural development and mitigating losses ca... As a vital infrastructure initiative with significant impacts on national development and public welfare,water conservancy projects play an essential role in advancing agricultural development and mitigating losses caused by flooding.However,these projects often require substantial investments and extended construction periods,leading to the inevitable emergence of various financial risks during implementation.This paper aims to explore the current challenges in financial risk management of the S water conservancy project,offering practical management strategies and solutions to address these financial difficulties.Through a detailed assessment and analysis of the S water conservancy project,the study seeks to provide valuable references and insights for similar projects to better manage financial risks,ensuring their smooth progression and successful completion.The proposed control measures are designed not only to effectively mitigate the financial risks specific to the S water conservancy project but also to offer actionable lessons for other similar projects.By promoting and applying these measures,the overall financial management capabilities of the industry can be enhanced,providing robust support for the sustainable development of water conservancy projects. 展开更多
关键词 Dual-carbon policy Financial risk management s water conservancy project
下载PDF
Relationships between Potential Risk of Hazardous Material Releases and Socio-Economic Demographic Characteristics Using Geospatial Analysis
2
作者 Seong Nam Hwang Venu Srivastav Kannegalla 《Journal of Geoscience and Environment Protection》 2021年第7期62-85,共24页
The problem investigated in this research is about the potential risk of technological hazards, which poses a perilous threat to humankind and the environment. Rapid urbanization has been increasing the population den... The problem investigated in this research is about the potential risk of technological hazards, which poses a perilous threat to humankind and the environment. Rapid urbanization has been increasing the population density in an area, elevating the risk of exposure to technological disasters. Therefore, it is necessary to detect the areas with higher chemical risk to spread awareness about the potential risk zones and reduce actual damage and casualties resulting from the hazardous substance events. The basic design of the study utilizes geospatial analysis to map the TRI (Toxics Release Inventory) facilities in the communities of Texas to establish a relationship between potential </span><span style="font-family:Verdana;">hazardous material release zones and the human population at risk. The</span><span style="font-family:Verdana;"> study identified the vulnerable counties as well as investigated how those risk areas are related to race/ethnicity, income and education. The research would contribute to the policymakers acting on the hazard situation and keep them better prepared for</span><span style="color:red;"> </span><span style="font-family:Verdana;">chemical hazards. In addition, it would help the residents and emergency managers to better understand the circumstance to mitigate the consequences as well as increase their awareness to be ready for the uncertainties in the hotspots involved in high risk of the hazards. 展开更多
关键词 Environmental Hazard risk GIs DIsAsTER Hazard Mitigation Emergency management Toxics Release Inventory (TRI) Facilities and socioeconomic Demographic characteristics
下载PDF
PetroChina Opens 18 Fresh Oil and Gas Blocks to Foreign Investors—Interview with CCAD general manager Zeng Xingqiu on PetroChina's foreign risk exploration and development
3
《China Oil & Gas》 CAS 2001年第4期50-52,共3页
关键词 CNPC Interview with CCAD general manager Zeng Xingqiu on PetroChina’s foreign risk exploration and development PetroChina Opens 18 Fresh Oil and Gas Blocks to Foreign Investors
下载PDF
Ibrutinib and atrial fibrillation:An in-depth review of clinical implications and management strategies
4
作者 Moiud Mohyeldin Shitij Shrivastava Sai Vishnu Vardhan Allu 《World Journal of Cardiology》 2024年第5期269-273,共5页
Ibrutinib,a targeted therapy for B-cell malignancies,has shown remarkable efficacy in treating various hematologic cancers.However,its clinical use has raised concerns regarding cardiovascular complications,notably at... Ibrutinib,a targeted therapy for B-cell malignancies,has shown remarkable efficacy in treating various hematologic cancers.However,its clinical use has raised concerns regarding cardiovascular complications,notably atrial fibrillation(AF).This comprehensive review critically evaluates the association between ibrutinib and AF by examining incidence,risk factors,mechanistic links,and management strategies.Through an extensive analysis of original research articles,this review elucidates the complex interplay between ibrutinib’s therapeutic benefits and cardiovascular risks.Moreover,it highlights the need for personalized treatment approaches,vigilant monitoring,and interdisciplinary collaboration to optimize patient outcomes and safety in the context of ibrutinib therapy.The review provides a valuable resource for healthcare professionals aiming to navigate the intricacies of ibrutinib’s therapeutic landscape while prioritizing patient well-being. 展开更多
关键词 Ibrutinib Bruton’s tyrosine kinase inhibitor Atrial fibrillation Cardiovascular risk management strategies
下载PDF
New Basle Capital Agreement and Risk Management of China's Banking Industry 被引量:1
5
作者 Lixin Ye 《Chinese Business Review》 2005年第2期28-33,59,共7页
Adjustment of Basle Capital Agreement will influence the risk management and capital arrangement demand of the banks with different scales, operation level and environment. It will have widespread and profound effect ... Adjustment of Basle Capital Agreement will influence the risk management and capital arrangement demand of the banks with different scales, operation level and environment. It will have widespread and profound effect on the competition strength of every country's banks in the global market. Starting with illustration of the present cond(tion of risk management in China's banks, the paper analyzes the major problems existing in the risk management system of China's banking industry, then puts forward some clues and suggestions to improve and better the risk management system of China's banking industry. 展开更多
关键词 new Basle Capital Agreement risk management system China's banking industry
下载PDF
Production Well Microbial Mitigation and H2S Risk Management
6
作者 Abdulmohsen Al-Humam Hisham Al-Shuwaikhat +2 位作者 Bahkly Thamer Abdullah Al-Nami Salman Al-Ramel 《Journal of Physical Science and Application》 2020年第2期19-29,共11页
One Field has been eternally acknowledged as a sweet arena without the presence of any souring phenomena.On the other hand,the Sulfate Reducing Bacteria(SRB)growth which has been lately observed in the field Water Inj... One Field has been eternally acknowledged as a sweet arena without the presence of any souring phenomena.On the other hand,the Sulfate Reducing Bacteria(SRB)growth which has been lately observed in the field Water Injection System played a major role in increasing the H2S concentrations in particular A fields.The objective of this study is to mitigate the SRB growth in the A Water Injection System and manage the risk of the Hydrogen Sulfide(H2S).In order to reduce the H2S concentrations and the return the Fields back to their original states.Thereafter,Biocide Treatment usage;based on the thorough evaluation performed in both the Lab and Fields by collecting more than 100 samples from designated wellheads and identified sampling points in the field Water Injection System network.Biocide field trial for one year was conducted with a persistent monitoring program.It appealed that the Biocide Treatment is influential,efficient and functional,carving deeper in the SRB mitigation and H2S risk management,the averaged H2S concentrations and trends in the Fields are being controlled and minimized in both the oil and gas phases. 展开更多
关键词 H2s risk management sRB mitigation
下载PDF
Artificial Neural Networks in Risk Management: A Bibliometric Study
7
作者 Breno Gontijo Tavares Carlos Eduardo Sanches da Silva Adler Diniz de Souza 《Journal of Business Administration Research》 2021年第1期29-36,共8页
This study presents a bibliometric analysis of Artificial Neural Networks in Risk Management.The study considered articles from the I.S.I.Web of Knowledge and Scopus databases,Identification of publishers,countries,pe... This study presents a bibliometric analysis of Artificial Neural Networks in Risk Management.The study considered articles from the I.S.I.Web of Knowledge and Scopus databases,Identification of publishers,countries,periodicals and the keywords most frequently cited.We used the CiteSpace® software to analyze this material,which provides a set of features to support bibliometrics,including the reference maps.This study provides data collection on Artificial Neural Networks applied to risk management.The number of works identified in this study is significant,and in the last ten years,the number of citations has increased.We did not identify the increase in paper count within the same period. 展开更多
关键词 Bibliometric study Artificial neural networks risk management I.s.I.Web of knowledge sCOPUs
下载PDF
基于B/S架构的防汛防旱抢险数字化管理系统研究
8
作者 邓清锋 《黄河水利职业技术学院学报》 2025年第1期16-20,共5页
针对传统的防汛防旱抢险管理方式难以实现高效、精准、及时响应的问题,研究了一种基于B/S架构的防汛防旱抢险数字化管理系统。分析了该系统的技术特性,探讨了系统的框架体系、通用业务组件、应用管理平台和开发功能结构等。
关键词 防汛防旱抢险 数字化管理系统 B/s架构 技术特性 系统性能
下载PDF
Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation
9
作者 宋洋 钟炜 《Transactions of Tianjin University》 EI CAS 2007年第2期131-136,共6页
The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the cons... The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper. 展开更多
关键词 visual simulation resource optimization risk analysis real time management s curve
下载PDF
Risk signal, financial derivatives transactions and the Indonesian GAAP
10
作者 Hilda Rossieta 《Journal of Modern Accounting and Auditing》 2010年第2期16-25,37,共11页
Motivated by the accounting events of firm's default related to derivatives and other financial instruments transactions, this study is aimed to investigate the capability of accounting information to signal the risk... Motivated by the accounting events of firm's default related to derivatives and other financial instruments transactions, this study is aimed to investigate the capability of accounting information to signal the risks associated with the use of financial derivatives for hedging. Hypothesis are developed based on the theory and empirical evidences of manager's motive to use derivatives for hedging (Berkman & Bradbury, 1968; Dune, et al., 2003) as well as signaling theory of accounting information (Ball & Brown, 1968; Beaver & Dukes, 1972; Jensen & Meckling, 1976; Megginson, 1997). The hypotheses are formulated in the Ordinary Least Square model. The study uses Statistical Product and Service Solutions (SPSS) version 14 as software to conduct the statistical tests. Non-bank and non-financial institutions firms with financial derivatives transactions listed in Indonesian Stock Exchange during 2001 to 2006 are chosen as the sample. Determinations of the time frame has considered the timing of introduction of revisions of accounting standard on derivatives and other financial instruments in Indonesia PSAK 50 Financial Instruments: Presentations and Disclosures which was published in July, 1998, as well as PSAK 55 Financial Instruments: Recognition and Measurements which was published in 1998. Based on the sample selections procedure and the completeness of the data required by the model, 24 firms listed during 2001-2006 or equal to 66 firm-years observations were identified as the data to be tested. Empirical evidences suggests that Indonesian GAAP is capable of providing signal associated with: (1) Fair value exposures related to manager's motive to reduce the cost of financial distress; (2) Cash flow exposures related to manager's motive to practice tax arbitrage as well as to overcome underinvestment problems; (3) Interest rate risks related to manager's motive to avoid the risk default due to limitations of debt covenants; (4) Forex risk related to manager's motive to control forex exposures caused by foreign operations as well as foreign sales. 展开更多
关键词 risk signal financial derivatives accounting manager's hedging motive Indonesian GAAP
下载PDF
S Zorb装置转剂线腐蚀风险评估与磨损特性分析
11
作者 李松泰 《石油化工腐蚀与防护》 CAS 2024年第2期30-34,共5页
催化裂化汽油吸附脱硫技术(S Zorb)是一种清洁汽油生产的核心技术,近年来,S Zorb装置中出现的转剂线磨损和泄漏等问题已成为石油化工行业内的共性难点问题。某公司2号S Zorb装置自2013年投用以来,转剂线频繁出现磨损和泄漏问题,以该案... 催化裂化汽油吸附脱硫技术(S Zorb)是一种清洁汽油生产的核心技术,近年来,S Zorb装置中出现的转剂线磨损和泄漏等问题已成为石油化工行业内的共性难点问题。某公司2号S Zorb装置自2013年投用以来,转剂线频繁出现磨损和泄漏问题,以该案例为研究对象,对转剂线开展腐蚀风险评估以及气固两相流流态和磨损机理等综合特性分析,同时对弯管弯径比和气速对磨损的影响进行了讨论,为转剂线的设计优化以及运行可靠性的提升提供了参考。 展开更多
关键词 s Zorb装置 转剂线 腐蚀风险 气固两相流 磨损特性
下载PDF
Altman’s Z-Score模型在企业风险管理中的应用研究 被引量:24
12
作者 徐秀渠 《经济经纬》 CSSCI 北大核心 2010年第4期103-106,共4页
随着市场竞争的加剧,信息化、高科技化进程的加快,企业决策难度、经营成本和收益的波动增大,企业风险管理彰显出重要性。笔者通过对沪、深证券交易所2007年~2009年暂停上市或终止上市的32家公司的Z值分析,认为用Altman’s Z-Score模型... 随着市场竞争的加剧,信息化、高科技化进程的加快,企业决策难度、经营成本和收益的波动增大,企业风险管理彰显出重要性。笔者通过对沪、深证券交易所2007年~2009年暂停上市或终止上市的32家公司的Z值分析,认为用Altman’s Z-Score模型预测企业风险是有效的。根据对Altman’s Z-Score模型组成变量的比较分析,笔者提出了企业防范风险的有关措施。 展开更多
关键词 Altman's Z-sCORE模型 暂停上市 终止上市 风险管理
下载PDF
化工园区建立OHSMS的研究与应用 被引量:1
13
作者 许丹枫 张礼敬 +1 位作者 陶刚 李冬 《工业安全与环保》 北大核心 2011年第8期4-6,共3页
在深入分析化工园区的风险特性与安全管理现状的基础上,探索新的化工园区安全管理模式;以系统的思想,探讨建立以化工园区为对象、各园区企业为相关方的职业健康安全管理体系(OHSMS),对化工园区实施系统化管理。实践表明,通过推行OHSMS,... 在深入分析化工园区的风险特性与安全管理现状的基础上,探索新的化工园区安全管理模式;以系统的思想,探讨建立以化工园区为对象、各园区企业为相关方的职业健康安全管理体系(OHSMS),对化工园区实施系统化管理。实践表明,通过推行OHSMS,可以实现化工园区科学化、系统化、规范化、文件化的职业健康安全管理,切实提高了园区整体的安全生产管理水平。 展开更多
关键词 化工园区 风险特性 职业健康安全管理体系(OHsMs) 安全管理模式 相关方
下载PDF
基于B/S结构的高分子材料特色文献数据库管理系统的研究 被引量:1
14
作者 姜敏 《现代情报》 北大核心 2005年第3期178-179,201,共3页
在网络化时代,图书馆自建高分子材料特色数据库具有创新意义。本文介绍了基于B/S结构的高分子材料特色数据库管理系统,详细阐述了系统的结构、管理功能及开发过程。应用实践证明,该系统运行效果良好。
关键词 特色数据库 高分子材料 B/s结构 管理系统
下载PDF
WHID Defense:USB HID攻击检测防护技术 被引量:1
15
作者 吕志强 薛亚楠 +2 位作者 张宁 冯朝雯 金忠峰 《信息安全学报》 CSCD 2021年第2期110-128,共19页
USB(universal serial bus)接口的出现为用户带来了便利,但也正由于它的便利性、使用广泛性使得其成为攻击者的攻击目标之一。常见的USB攻击主要有USB摆渡攻击和USB HID攻击,本文通过对USB协议漏洞以及恶意USB HID攻击工具的攻击特点的... USB(universal serial bus)接口的出现为用户带来了便利,但也正由于它的便利性、使用广泛性使得其成为攻击者的攻击目标之一。常见的USB攻击主要有USB摆渡攻击和USB HID攻击,本文通过对USB协议漏洞以及恶意USB HID攻击工具的攻击特点的分析,提出了USB HID(human interface device)攻击模型并生成了相应的攻击数据流。基于以上研究构建了一个集按键注入攻击预警、捕获恶意USB HID攻击设备数据、干扰恶意USB HID攻击设备通信、风险等级分类与显示、用户身份管理与访问控制等功能于一体的恶意USB HID攻击检测防护平台——WHID Defense。经实验验证,WHID Defense按键注入攻击的拦截率为99.98%,目标数据捕获率为100%,干扰目标设备正常通信成功率为97.7%,功能完善,性能突出。相比现有检测技术,WHID Defense平台形成了多级防护体系,可以部署在个人电脑上进行实时防御,抵御了包括BadUSB等多种恶意USB HID工具的攻击。 展开更多
关键词 恶意UsB设备 HID攻击 UsB组合设备 攻击检测 特征分析 身份管理与访问控制 风险分类
下载PDF
从风险管理视角看B-S模型及其发展
16
作者 闫丽瑞 《经济问题》 CSSCI 北大核心 2008年第4期112-114,共3页
金融风险是指由于金融资产价值的不利变动而使金融机构遭受损失的可能性。现实的经济和金融市场并非完美,因此,通过风险管理可以提升公司价值。论述了金融风险管理的理论和技术基础——Black-Scholes期权定价模型以及其演变发展,进一步... 金融风险是指由于金融资产价值的不利变动而使金融机构遭受损失的可能性。现实的经济和金融市场并非完美,因此,通过风险管理可以提升公司价值。论述了金融风险管理的理论和技术基础——Black-Scholes期权定价模型以及其演变发展,进一步分析了这一演进给对我国金融业发展的启示,从而对防范金融风险提出有益的建议。 展开更多
关键词 风险管理 B-s模型 期权定价
下载PDF
四溴双酚A/S及其8种衍生物在清远土壤样品中的污染特征及生态风险评估 被引量:3
17
作者 杨慧 罗孝俊 +2 位作者 何家卓 曾艳红 麦碧娴 《地球化学》 CAS CSCD 北大核心 2023年第1期1-8,共8页
四溴双酚A(tetrabromobisphenol-A, TBBPA)、四溴双酚S(tetrabromobisphenol-S, TBBPS)和它们的衍生物作为阻燃剂被广泛应用于日常用品,以致在多种环境介质中都能检测出它们的存在。本研究分析了清远市龙塘镇的44个土壤样品中的TBBPA、T... 四溴双酚A(tetrabromobisphenol-A, TBBPA)、四溴双酚S(tetrabromobisphenol-S, TBBPS)和它们的衍生物作为阻燃剂被广泛应用于日常用品,以致在多种环境介质中都能检测出它们的存在。本研究分析了清远市龙塘镇的44个土壤样品中的TBBPA、TBBPS及其8种衍生物的含量,并评估了这10种目标物的环境风险。在所有检测的目标化合物中, TBBPA、四溴双酚A双缩水甘油醚(TBBPA-BGE)和四溴双酚A双(2,3-二溴丙基醚)(TBBPA-BDBPE)是样品中的主要污染物,对目标物总浓度的贡献率分别为30%、26%和40%。TBBPA、TBBPA-BGE和TBBPA-BDBPE的浓度平均值分别为1114、1890和853ng/g(干重),浓度范围分别为ND~13098、ND~15980和ND~6088 ng/g。TBBPA、TBBPA-BGE和TBBPA-BDBPE的风险商值大于1,表明这3类化合物对清远土壤存在一定生态环境风险,应当引起重视。本研究为进一步了解常用溴系阻燃剂TBBPA、TBBPS及其衍生物的环境归趋和风险暴露提供了数据支撑。 展开更多
关键词 四溴双酚A 四溴双酚s 衍生物 土壤 污染特征 生态风险
下载PDF
基于T-S模糊故障树和贝叶斯网络的建筑施工风险评估模型建立及应用 被引量:6
18
作者 杜敏维 于德湖 邵志国 《青岛理工大学学报》 CAS 2023年第1期21-29,共9页
作为国民经济发展的支柱产业,建筑业安全事故频发,施工安全形势严峻。为有效评估和降低建筑施工安全风险,将T-S模糊故障树和贝叶斯网络进行结合,建立一种建筑施工风险评估模型。利用T-S门规则和贝叶斯网络的条件概率,建立T-S模糊故障树... 作为国民经济发展的支柱产业,建筑业安全事故频发,施工安全形势严峻。为有效评估和降低建筑施工安全风险,将T-S模糊故障树和贝叶斯网络进行结合,建立一种建筑施工风险评估模型。利用T-S门规则和贝叶斯网络的条件概率,建立T-S模糊故障树的贝叶斯网络转化模型,引入模糊理论对事件风险概率进行模糊化,最终借助贝叶斯网络双向推理算法计算故障概率、重要度及后验概率。结果表明,该模型能够根据基本事件风险概率进行量化计算,以正向推理方式计算体系事故发生概率;能够量化根节点的模糊重要度,确定事件重点管控顺序;且可以通过反向推理计算根节点后验概率,确定故障排查顺序。该计算模型最大限度贴近实际施工情形,更加科学合理地进行建筑施工风险评估,可为建筑施工的安全风险评估和精准化管理提供理论支持。 展开更多
关键词 建筑施工 风险评估 T-s模糊故障树 贝叶斯网络 安全管理
下载PDF
一个B/S结构的软件项目管理平台的分析和设计 被引量:1
19
作者 付友 《计算机技术与发展》 2006年第5期170-172,176,共4页
阐述了一个软件项目的管理平台分析和设计过程。该平台采用B/S结构构建,在Intranet/Internet环境下使用。以项目集中管理、共享资源、协同服务为宗旨,提供了一个完整的软件项目管理理念和流程,实现了项目立项登记、项目预算维护、项目... 阐述了一个软件项目的管理平台分析和设计过程。该平台采用B/S结构构建,在Intranet/Internet环境下使用。以项目集中管理、共享资源、协同服务为宗旨,提供了一个完整的软件项目管理理念和流程,实现了项目立项登记、项目预算维护、项目实施计划制定、项目收款计划和实收、团队成员选取、实施方法论选取、项目文档上传、项目风险预警、项目费用维护、项目文档检索、专家资源检索等功能。 展开更多
关键词 项目管理 实施方法论 风险预警 项目损益表 B/s结构
下载PDF
Acceptance Sampling Plans with Truncated Life Tests for the Length-Biased Weighted Lomax Distribution 被引量:1
20
作者 Amer Ibrahim Al-Omari Ibrahim M.Almanjahie Olena Kravchuk 《Computers, Materials & Continua》 SCIE EI 2021年第4期285-301,共17页
In this paper,we considered the Length-biased weighted Lomax distribution and constructed new acceptance sampling plans(ASPs)where the life test is assumed to be truncated at a pre-assigned time.For the new suggested ... In this paper,we considered the Length-biased weighted Lomax distribution and constructed new acceptance sampling plans(ASPs)where the life test is assumed to be truncated at a pre-assigned time.For the new suggested ASPs,the tables of the minimum samples sizes needed to assert a specific mean life of the test units are obtained.In addition,the values of the corresponding operating characteristic function and the associated producer’s risks are calculated.Analyses of two real data sets are presented to investigate the applicability of the proposed acceptance sampling plans;one data set contains the first failure of 20 small electric carts,and the other data set contains the failure times of the air conditioning system of an airplane.Comparisons are made between the proposed acceptance sampling plans and some existing acceptance sampling plans considered in this study based on the minimum sample sizes.It is observed that the samples sizes based on the proposed acceptance sampling plans are less than their competitors considered in this study.The suggested acceptance sampling plans are recommended for practitioners in the field. 展开更多
关键词 Acceptance sampling plan producer’s risk truncated life tests operating characteristic function length-biased weighted lomax distribution consumer’s risk
下载PDF
上一页 1 2 11 下一页 到第
使用帮助 返回顶部