In Synergetics, when a complex system evolves from one sate to another, the order parameter plays a dominant role. We can analyze the complex system state by studying the dynamic of order parameter. We developed a syn...In Synergetics, when a complex system evolves from one sate to another, the order parameter plays a dominant role. We can analyze the complex system state by studying the dynamic of order parameter. We developed a synergetic model of electricity market operation system, and studied the dynamic process of the system with empirical example, which revealed the internal mechanism of the system evolution. In order to verify the accuracy of the synergetic model, fourth-order Runge-Kutta algorithm and grey relevance method were used. Finally, we found that the reserve rate of generation was the order parameter of the system. Then we can use the principle of Synergetics to evaluate the efficiency of electricity market operation.展开更多
The Multi Year Tariff Order (MYTO) is the Nigerian Electricity Regulatory Commission (NERC) pricing framework for determining the Nigerian Electricity Supply Industry (NESI) pricing model. One of the objectives of the...The Multi Year Tariff Order (MYTO) is the Nigerian Electricity Regulatory Commission (NERC) pricing framework for determining the Nigerian Electricity Supply Industry (NESI) pricing model. One of the objectives of the NERC’s MYTO pricing model is to ensure regulated electricity end user tariff without compromising return on investment. Achieving this objective is imperative to attract investors in the growing Nigerian electricity market. However, NESI has hitherto been faced with challenges ranging from its inability to provide sufficient power to its customers to not being viable enough to provide return on capital invested. In this paper, sensitivity analysis of power plant operation and performance parameters on the cost of electricity (CoE) generation using MYTO (power generation) pricing model were evaluated. Thermodynamic modeling and simulation of an open cycle gas turbine (OCGT) was carried out to augment scarce data on power plant performance and operation in Nigeria. Sensitivity analysis was carried out using probabilistic method based on Monte Carlo simulation (MCS) implemented in commercial software (@ Risk®). The result highlighted sensitivity of the model input parameters to cost of electricity generation based on technical and financial assumptions of MYTO model. Seven most influential parameters affecting generation cost were identified. These parameters and their correlation coefficients are given as: 1) foreign exchange rate, 0.76;2) cost of fuel, 0.51;3) thermal efficiency, -0.23;4) variable operation and maintenance cost, 0.22;5) fixed operating and maintenance cost, -0.03;6) capacity factor, -0.02;and 7) average capacity degradation, 0.01. Based on the gas turbine engine and input parameter distributions statistics for this study, the generation cost lies between 9.84 to 15.45 N/kWh and the probabilities of CoE within these values were established.展开更多
基于英国克拉克森研究公司和全球主要船级社的网站数据,根据手持订单量和交付与完工情况对全球汽车卡车运输船(Pure Car and Truck Carrier,PCTC)进行市场分析,对全球PCTC平均关键建造周期进行对标分析,查找国内造船企业与国外造船企业...基于英国克拉克森研究公司和全球主要船级社的网站数据,根据手持订单量和交付与完工情况对全球汽车卡车运输船(Pure Car and Truck Carrier,PCTC)进行市场分析,对全球PCTC平均关键建造周期进行对标分析,查找国内造船企业与国外造船企业的差距,为我国造船企业缩短PCTC建造周期提供改进目标。展开更多
文摘In Synergetics, when a complex system evolves from one sate to another, the order parameter plays a dominant role. We can analyze the complex system state by studying the dynamic of order parameter. We developed a synergetic model of electricity market operation system, and studied the dynamic process of the system with empirical example, which revealed the internal mechanism of the system evolution. In order to verify the accuracy of the synergetic model, fourth-order Runge-Kutta algorithm and grey relevance method were used. Finally, we found that the reserve rate of generation was the order parameter of the system. Then we can use the principle of Synergetics to evaluate the efficiency of electricity market operation.
文摘The Multi Year Tariff Order (MYTO) is the Nigerian Electricity Regulatory Commission (NERC) pricing framework for determining the Nigerian Electricity Supply Industry (NESI) pricing model. One of the objectives of the NERC’s MYTO pricing model is to ensure regulated electricity end user tariff without compromising return on investment. Achieving this objective is imperative to attract investors in the growing Nigerian electricity market. However, NESI has hitherto been faced with challenges ranging from its inability to provide sufficient power to its customers to not being viable enough to provide return on capital invested. In this paper, sensitivity analysis of power plant operation and performance parameters on the cost of electricity (CoE) generation using MYTO (power generation) pricing model were evaluated. Thermodynamic modeling and simulation of an open cycle gas turbine (OCGT) was carried out to augment scarce data on power plant performance and operation in Nigeria. Sensitivity analysis was carried out using probabilistic method based on Monte Carlo simulation (MCS) implemented in commercial software (@ Risk®). The result highlighted sensitivity of the model input parameters to cost of electricity generation based on technical and financial assumptions of MYTO model. Seven most influential parameters affecting generation cost were identified. These parameters and their correlation coefficients are given as: 1) foreign exchange rate, 0.76;2) cost of fuel, 0.51;3) thermal efficiency, -0.23;4) variable operation and maintenance cost, 0.22;5) fixed operating and maintenance cost, -0.03;6) capacity factor, -0.02;and 7) average capacity degradation, 0.01. Based on the gas turbine engine and input parameter distributions statistics for this study, the generation cost lies between 9.84 to 15.45 N/kWh and the probabilities of CoE within these values were established.
文摘基于英国克拉克森研究公司和全球主要船级社的网站数据,根据手持订单量和交付与完工情况对全球汽车卡车运输船(Pure Car and Truck Carrier,PCTC)进行市场分析,对全球PCTC平均关键建造周期进行对标分析,查找国内造船企业与国外造船企业的差距,为我国造船企业缩短PCTC建造周期提供改进目标。