期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Study of High Efficiency Membrane Pilot Test for Membrane Design Optimisation in Order to Reduce the Electrical Consumption
1
作者 Federico Antonio Leon Alejandro Ramos 《Journal of Energy and Power Engineering》 2016年第10期628-633,共6页
Regarding the studies of other authors about energy performance of a reverse osmosis desalination plant operating with variable pressure; about desalination efficiency in their different recent articles, we continued ... Regarding the studies of other authors about energy performance of a reverse osmosis desalination plant operating with variable pressure; about desalination efficiency in their different recent articles, we continued working in this way researching in a real seawater reverse osmosis plant following the items below. The objectives of this test are to get the minimum electrical consumption and energy costs for the operation of a sea water desalination plant using membranes. We need to compare the performance of the different membranes manufacturer's and to determine, under this new thermal scenario, the optimal configuration to get the water quality and quantity needs with the minimum energy consumption. 展开更多
关键词 minimum energy consumption energetic efficiency high efficiency membrane energy costs.
下载PDF
Analysis of minimum specific energy consumption and optimal transport concentration of slurry pipeline transport systems 被引量:1
2
作者 Mingzhi Li Yanping He +4 位作者 Ruhong Jiang Ji Zhang Hongsheng Zhang Weihuang Liu Yadong Liu 《Particuology》 SCIE EI CAS CSCD 2022年第7期38-47,共10页
Slurry pipeline transport is widely used in several industrial processes.Calculating the specific power consumption(SPC)and determining the best working conditions are important for the design and operation of transpo... Slurry pipeline transport is widely used in several industrial processes.Calculating the specific power consumption(SPC)and determining the best working conditions are important for the design and operation of transportation systems.Based on the Shanghai Jiao Tong University high-concentration multi-sized slurry pressure drop(SJTU-HMSPD)pipeline-resistance-calculation model,the SJTU-SPC model for calculating the power required to transport a unit volume of solid materials over a unit pipeline length is established for a slurry transport system.The said system demonstrates a uniformity coefficient in the 1.26–7.98 range,median particle size of 0.075–4 mm,particle volume concentration of 10–60%,and pipeline diameter of 0.203–0.8 m.The results obtained were successfully verified against existing experimental data.The influence of parameters,such as particle-gradation uniformity coefficient,median particle size,pipe diameter,and particle volume concentration,on the SPC were analysed.The results revealed that the greater is the uniformity coefficient,the smaller is the minimum specific energy consumption and the larger the optimal transport concentration for a constant,median particle size slurry.As observed,the optimal transport concentration for broad-graded sand equalled approximately 48%.These results supplement the conclusions of existing research,indicating that the optimal transport concentration is approximately 30%and provides theoretical support for high concentration transportation of broad graded slurry. 展开更多
关键词 Slurry pipeline transport system Specific power consumption minimum specific energy consumption Optimal transport concentration
原文传递
Iron ores matching analysis and optimization for iron-making system by taking energy consumption,CO2 emission or cost minimization as the objective 被引量:8
3
作者 SHEN Xun CHEN LinGen +2 位作者 XIA ShaoJun QIN XiaoYong XIE ZhiHui 《Science China(Technological Sciences)》 SCIE EI CAS CSCD 2017年第11期1625-1637,共13页
An optimization model for iron-making system covering sinter matching process to blast furnace process is established, in which the energy consumption, CO_2 emission and cost minimizations are taken as optimization ob... An optimization model for iron-making system covering sinter matching process to blast furnace process is established, in which the energy consumption, CO_2 emission and cost minimizations are taken as optimization objectives. Some key constraints are considered according to practical production experience in the modelling. The combination of linear programming(LP)and nonlinear programming(NLP) methods is applied. The optimal sinter matching scheme under given conditions and the optimization results for different objectives are obtained. Effects of sinter grade and basicity on all the optimal objectives and coke ratio in blast furnace process are analyzed, respectively. The results obtained indicate that compared with the initial values,the energy consumption/CO_2 emission of iron-making system decreases by 2.03% for objectives of energy consumption/CO_2 emission minimizations and 1.89% for the objective of cost minimization, the cost decreases by 17.88% and 18.13%, respectively.All the three criteria decrease with the increasing lump usage, coal powder injection, blast temperature, and decreasing coke ratio for the iron-making system. 展开更多
关键词 iron ore matching iron-making system minimum energy consumption minimum CO2 emission minimum cost performance optimization
原文传递
Specific Energy Consumption Analysis Model and Its Application in Typical Steel Manufacturing Process 被引量:5
4
作者 SUN Wen-qiang CAI Jiu-ju DU Tao ZHANG Da-wei 《Journal of Iron and Steel Research International》 SCIE EI CAS CSCD 2010年第10期33-37,共5页
Theoretical minimum and actual specific energy consumptions (SEC) of typical manufacturing process (SMP) were studied. Firstly, a process division of a typical SMP in question was conducted with the theory of SEC ... Theoretical minimum and actual specific energy consumptions (SEC) of typical manufacturing process (SMP) were studied. Firstly, a process division of a typical SMP in question was conducted with the theory of SEC analysis. Secondly, an exergy analysis model of a subsystem consisting of several parallel processes and a SEC analysis model of SMP were developed. And finally, based on the analysis models, the SEC of SMP was analyzed by means of the statistical significance. The results show that the SEC of typical SMP comprises the theoretical minimum SEC and the additional SEC derived from the irreversibility~ and the SMP has a theoretical minimum SEC of 6.74 GJ/t and an additional SEC of 19.32 GJ/t, which account for 25.88% and 74.12% of the actual SEC, respectively. 展开更多
关键词 steel manufacturing process theoretical minimum specific energy consumption additional specific energy consumption actual specific energy consumption specific energy consumption analysis exergy analysis
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部