The exergy analysis and finite time thermodynamic methods had been employed to analyze the compound condensation process (CCP). It was based on the air-cooling heat pump unit. The cooling capacity of the chiller unit ...The exergy analysis and finite time thermodynamic methods had been employed to analyze the compound condensation process (CCP). It was based on the air-cooling heat pump unit. The cooling capacity of the chiller unit is about 1 kW, and the work refrigerant is R22/R407C/R410A/CO2. The MATLAB/SIMULINK software was employed to build the simulation model. The thermodynamic simulation model is significant for the optimization of parameters of the unit, such as condensation and evaporation temperature and mass flow of the sanitary hot water and size of hot water storage tank. The COP of the CCP of R410A system is about 3% - 5% higher than the CCP of the R22 system, while CCP of the R407C system is a little lower than the CCP of R22 system. And the CCP of CO2 trans-critical system has advantage in the hot supply mode. The simulation method provided a theoretical reference for developing the production of CCP with substitute refrigerant R407C/R410A/CO2.展开更多
Decarbonisation of district heating and cooling(DHC)system in Helsinki metropolitan area requires investments in new energy technologies and approaches to replace fossil fuel fired district heating(DH)production.Inves...Decarbonisation of district heating and cooling(DHC)system in Helsinki metropolitan area requires investments in new energy technologies and approaches to replace fossil fuel fired district heating(DH)production.Invest-ment paths involving(a)DH heat pumps(HPs)from low quality heat sources and(b)small modular nuclear reactors(SMR)are compared by utilising investment analysis based on optimisation model depicting the as-sumed 2030 situation.Several scenarios,with varying assumptions concerning existing DHC system,investment costs and electricity prices,are analysed in terms of new capacity and total annualised costs.The results indicate that the SMR option is more cost-efficient than the HP option with 4-8€/MWh difference in operation costs including annualised investments.Biomass fired boiler investments,enabled in both options,are preferred to HP investments in most scenarios.The cost-efficiency of HP investments is sensitive to investment cost,whereas SMR investments are relatively stable to investment cost variations.Varying electricity market prices affect cost-efficiency of large-scale HPs,and investments in SMR cogeneration units take place only with high electricity prices.展开更多
文摘The exergy analysis and finite time thermodynamic methods had been employed to analyze the compound condensation process (CCP). It was based on the air-cooling heat pump unit. The cooling capacity of the chiller unit is about 1 kW, and the work refrigerant is R22/R407C/R410A/CO2. The MATLAB/SIMULINK software was employed to build the simulation model. The thermodynamic simulation model is significant for the optimization of parameters of the unit, such as condensation and evaporation temperature and mass flow of the sanitary hot water and size of hot water storage tank. The COP of the CCP of R410A system is about 3% - 5% higher than the CCP of the R22 system, while CCP of the R407C system is a little lower than the CCP of R22 system. And the CCP of CO2 trans-critical system has advantage in the hot supply mode. The simulation method provided a theoretical reference for developing the production of CCP with substitute refrigerant R407C/R410A/CO2.
基金The authors of this paper gratefully acknowledge the public fi-nancing of Business Finland for the“EcoSMR”project(Grant No.:9277/31/2019).
文摘Decarbonisation of district heating and cooling(DHC)system in Helsinki metropolitan area requires investments in new energy technologies and approaches to replace fossil fuel fired district heating(DH)production.Invest-ment paths involving(a)DH heat pumps(HPs)from low quality heat sources and(b)small modular nuclear reactors(SMR)are compared by utilising investment analysis based on optimisation model depicting the as-sumed 2030 situation.Several scenarios,with varying assumptions concerning existing DHC system,investment costs and electricity prices,are analysed in terms of new capacity and total annualised costs.The results indicate that the SMR option is more cost-efficient than the HP option with 4-8€/MWh difference in operation costs including annualised investments.Biomass fired boiler investments,enabled in both options,are preferred to HP investments in most scenarios.The cost-efficiency of HP investments is sensitive to investment cost,whereas SMR investments are relatively stable to investment cost variations.Varying electricity market prices affect cost-efficiency of large-scale HPs,and investments in SMR cogeneration units take place only with high electricity prices.