Digital networked communications are the key to all Internet-of-things applications, but especially to smart metering systems and the smart grid. In order to ensure a safe operation of systems and the privacy of users...Digital networked communications are the key to all Internet-of-things applications, but especially to smart metering systems and the smart grid. In order to ensure a safe operation of systems and the privacy of users, the transport layer security (TLS) protocol, a mature and well standardized solution for secure communications, may be used. We implemented the TLS protocol in its latest version in a way suitable for embedded and resource-constrained systems. This paper outlines the challenges and opportunities of deploying TLS in smart metering and smart grid applications and presents performance results of our TLS implementation. Our analysis shows that given an appropriate implementation and configuration, deploying TLS in constrained smart metering systems is possible with acceptable overhead.展开更多
Using current Embedded Discrete Fracture Models(EDFM) to predict the productivity of fractured wells has some drawbacks, such as not supporting corner grid, low precision in the near wellbore zone, and disregarding th...Using current Embedded Discrete Fracture Models(EDFM) to predict the productivity of fractured wells has some drawbacks, such as not supporting corner grid, low precision in the near wellbore zone, and disregarding the heterogeneity of conductivity brought by non-uniform sand concentration. An EDFM is developed based on the corner grid, which enables high efficient calculation of the transmissibility between the embedded fractures and matrix grids, and calculation of the permeability of each polygon in the embedded fractures by the lattice data of the artificial fracture aperture. On this basis, a coupling method of local grid refinement(LGR) and embedded discrete fracture model is designed, which is verified by comparing the calculation results with the Discrete Fracture Network(DFN) method and fitting the actual production data of the first hydraulically fractured well in Iraq. By using this method and orthogonal experimental design, the optimization of the parameters of the first multi-stage fractured horizontal well in the same block is completed. The results show the proposed method has theoretical and practical significance for improving the adaptability of EDFM and the accuracy of productivity prediction of fractured wells, and enables the coupling of fracture modeling and numerical productivity simulation at reservoir scale.展开更多
The interconnection of Solar PV to the Tarkwa Bulk Supply Point (BSP) has become necessary in order to provide additional capacity to meet the ever-increasing demand of Tarkwa and its environs during the day. The Sola...The interconnection of Solar PV to the Tarkwa Bulk Supply Point (BSP) has become necessary in order to provide additional capacity to meet the ever-increasing demand of Tarkwa and its environs during the day. The Solar PV Plant will support the Tarkwa BSP during the day. In this study, a grid impact analysis for the integration of Solar PV plant at three points of common coupling (PCC) at Tarkwa Bulk Supply Point’s (BSP) 33 kV network of the Electricity Company of Ghana was carried out. The three PCCs were Tarkwa BSP, Ghana Australia Gold (GAG) Substation and Darmang Substation. Simulations and detailed analysis were carried out with the use of CYME Software (Cyme 8.0 Rev 05). The Solar PV was integrated at varying penetration levels of 9 MWp, 11 MWp, 14 MWp, 16 MWp, 18 MWp, 20 MWp and 23 MWp (representing penetration levels of 40%, 50%, 60%, 70%, 80%, 90% and 100%, respectively) of the 2020 projected light demand of Tarkwa BSP 25.15 MVA network at an average power factor of 0.903. From the study, the optimum capacity of Solar PV power that could be connected is 9 MWp at an optimum inverter power factor of 0.94 lagging, and the GAG Substation was identified as the optimal location. The stiffness ratio at the optimal location was determined as 41.9, a figure which is far greater than the minimum standard value of 5, and gives an indication of very little voltage control problems in the operation of the proposed Solar PV interconnection. The integration of the optimum 9 MW Solar PV Plant to the Tarkwa network represents an additional 12.77% capacity, decreased the technical losses by 7.76%, and increased the voltage profile by 1.97%.展开更多
A scheduling scheme is proposed to reduce execution time by means of both checkpoint sharing and task duplication under a peer-to-peer(P2P) architecture. In the scheme, the checkpoint executed by each peer(i.e., a res...A scheduling scheme is proposed to reduce execution time by means of both checkpoint sharing and task duplication under a peer-to-peer(P2P) architecture. In the scheme, the checkpoint executed by each peer(i.e., a resource) is used as an intermediate result and executed in other peers via its duplication and transmission. As the checkpoint is close to a final result, the reduction of execution time for each task becomes higher, leading to reducing turnaround time. To evaluate the performance of our scheduling scheme in terms of transmission cost and execution time, an analytical model with an embedded Markov chain is presented. We also conduct simulations with a failure rate of tasks and compare the performance of our scheduling scheme with that of the existing scheme based on client-server architecture. Performance results show that our scheduling scheme is superior to the existing scheme with respect to the reduction of execution time and turnaround time.展开更多
基金supported in part by the Federal Ministry of Economics and Energy as a cooperative ZIM-KF project under Grant No.KF2471305ED2the good cooperation with the project partner SSV Software Systems GmbH
文摘Digital networked communications are the key to all Internet-of-things applications, but especially to smart metering systems and the smart grid. In order to ensure a safe operation of systems and the privacy of users, the transport layer security (TLS) protocol, a mature and well standardized solution for secure communications, may be used. We implemented the TLS protocol in its latest version in a way suitable for embedded and resource-constrained systems. This paper outlines the challenges and opportunities of deploying TLS in smart metering and smart grid applications and presents performance results of our TLS implementation. Our analysis shows that given an appropriate implementation and configuration, deploying TLS in constrained smart metering systems is possible with acceptable overhead.
基金Supported by the China National Science and Technology Major Project (2017ZX05030)
文摘Using current Embedded Discrete Fracture Models(EDFM) to predict the productivity of fractured wells has some drawbacks, such as not supporting corner grid, low precision in the near wellbore zone, and disregarding the heterogeneity of conductivity brought by non-uniform sand concentration. An EDFM is developed based on the corner grid, which enables high efficient calculation of the transmissibility between the embedded fractures and matrix grids, and calculation of the permeability of each polygon in the embedded fractures by the lattice data of the artificial fracture aperture. On this basis, a coupling method of local grid refinement(LGR) and embedded discrete fracture model is designed, which is verified by comparing the calculation results with the Discrete Fracture Network(DFN) method and fitting the actual production data of the first hydraulically fractured well in Iraq. By using this method and orthogonal experimental design, the optimization of the parameters of the first multi-stage fractured horizontal well in the same block is completed. The results show the proposed method has theoretical and practical significance for improving the adaptability of EDFM and the accuracy of productivity prediction of fractured wells, and enables the coupling of fracture modeling and numerical productivity simulation at reservoir scale.
文摘The interconnection of Solar PV to the Tarkwa Bulk Supply Point (BSP) has become necessary in order to provide additional capacity to meet the ever-increasing demand of Tarkwa and its environs during the day. The Solar PV Plant will support the Tarkwa BSP during the day. In this study, a grid impact analysis for the integration of Solar PV plant at three points of common coupling (PCC) at Tarkwa Bulk Supply Point’s (BSP) 33 kV network of the Electricity Company of Ghana was carried out. The three PCCs were Tarkwa BSP, Ghana Australia Gold (GAG) Substation and Darmang Substation. Simulations and detailed analysis were carried out with the use of CYME Software (Cyme 8.0 Rev 05). The Solar PV was integrated at varying penetration levels of 9 MWp, 11 MWp, 14 MWp, 16 MWp, 18 MWp, 20 MWp and 23 MWp (representing penetration levels of 40%, 50%, 60%, 70%, 80%, 90% and 100%, respectively) of the 2020 projected light demand of Tarkwa BSP 25.15 MVA network at an average power factor of 0.903. From the study, the optimum capacity of Solar PV power that could be connected is 9 MWp at an optimum inverter power factor of 0.94 lagging, and the GAG Substation was identified as the optimal location. The stiffness ratio at the optimal location was determined as 41.9, a figure which is far greater than the minimum standard value of 5, and gives an indication of very little voltage control problems in the operation of the proposed Solar PV interconnection. The integration of the optimum 9 MW Solar PV Plant to the Tarkwa network represents an additional 12.77% capacity, decreased the technical losses by 7.76%, and increased the voltage profile by 1.97%.
基金supported by the Basic Science Research Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Education (2012R1A1A4A0105777)supported by the MSIP (Ministry of Science, ICT and Future Planning), Korea, under the ITRC (Information Technology Research Center) support program (NIPA-2013-H030113-4007) supervised by the NIPA (National IT Industry Promotion Agency)
文摘A scheduling scheme is proposed to reduce execution time by means of both checkpoint sharing and task duplication under a peer-to-peer(P2P) architecture. In the scheme, the checkpoint executed by each peer(i.e., a resource) is used as an intermediate result and executed in other peers via its duplication and transmission. As the checkpoint is close to a final result, the reduction of execution time for each task becomes higher, leading to reducing turnaround time. To evaluate the performance of our scheduling scheme in terms of transmission cost and execution time, an analytical model with an embedded Markov chain is presented. We also conduct simulations with a failure rate of tasks and compare the performance of our scheduling scheme with that of the existing scheme based on client-server architecture. Performance results show that our scheduling scheme is superior to the existing scheme with respect to the reduction of execution time and turnaround time.